UJVN LIMITED Details of FRL, MDDL & TWL
Name of Dam/Barrage/Canal |
MDDL (m) |
FRL (m) |
Name of Power Station |
Tail Race Water Level (TWL ) at Full Load |
Ichari Dam |
639 |
644.75 |
Chibro (240 |
518 m |
Khodri (120 MW) |
457 m |
Dakpathar Barrage |
449.847 |
456.646 |
Dhakrani (33.75 MW) |
432.39 m |
Dhalipur (51 MW) |
401 m |
Asan Barrage |
395.95 |
401.5 |
Kulhal (30 MW) |
382.6 m |
Maneri Dam |
1280.5 |
1286.5 |
Tiloth (90 MW) |
1117.5 m/1118.5 m (lean season/ monsoon) |
Joshiyara Barrage |
1103 |
1108 |
MB-II (304 MW) |
830 m |
Pashulok Barrage |
333 |
336.5 |
Chilla (144 MW) |
297 m (Normal)
295 m (Min.) |
Ramganga Dam |
317 |
366.3 |
Ramganga (198 MW) |
260.4 m |
Banbasa Barrage |
219.9 |
225.4 |
Khatima (41.4 MW) |
652.36 ft |
Bhatta Head |
1366.51 |
1370.5 |
Galogi (3 MW) |
- |
Pathri (UG Canal) |
- |
Full supply level 280.03 |
Pathri (20.4 MW) |
270.05 m/268.3 m (MAX/MIN) |
Mohammadpur (UG Canal) |
- |
Full supply level 261.14 |
Mohd.pur (9.3 MW) |
256.3 m/254.6 m (MAX/MIN) |