Tenders Archive
 

S.No Click Here To Download NIT Uploading Date Closing Date Circle Address Classification Description Corrigendum /
Downloads
1. 03/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 24-04-2024 08-07-2024 Dehradun Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun Dy. General Manager Construction of Power House Building, Tail Race Channel, Switch yard and other associated work of Power House site of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand
2. 02/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 24-04-2024 08-07-2024 Dehradun Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun Dy. General Manager Construction of Head Race Tunnel, Adits, Surge Shaft, Excavation of penstock of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand
3. 01/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 24-04-2024 08-07-2024 Dehradun Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun Dy. General Manager Construction of Barrage, Intake and its appurtenant works including River Diversion of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand
4. 01/EE(Civil)/HT/2023-24 15-03-2024 01-06-2024 Dehradun Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Hanol-Tiuni Hydro Electric Project on River Tons in District Uttarkashi/Dehradun of Uttarakhand Time Extn. 1
5. 07/EE(Civil)/KB/2023-24 05-03-2024 15-05-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services for preparation of EPC tender documents and tender stage drawing for Katapathar Barrage on river Yamuna at Katapathar, Dist. Dehradun in Uttarakhand. Time Extn. 1 Time Extn. 2
6. 16/EE(E&M-I)/LP/2023-24 26-03-2024 11-05-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Supply of Stationery items for the offices of E&M wing Lakhwar Multi Purpose Project, Dakpathar, Dehradun Time Extn. 1
7. 20/2023-24/EE(C-M)Vyasi Project 09-02-2024 06-05-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Levelling of land & Demarcation of plots at Village Dhaira Khadar,Kalsi Distt. Dehradun for Rehabilitation of Vyasi HEP affected village Lohari Time Extn. 1 Time Extn. 2 Time Extn. 3 Time Extn. 4
8. 32/EE(Civil)/MB-I/TN/2023-24 20-03-2024 02-05-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Safe closure of adits,tunnels,surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi. Time Extn. 1
9. 31/EE(Civil)/MB-I/TN/2023-24 20-03-2024 02-05-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. Time Extn. 1
10. 30/EE(Civil)/MB-I/TN/2023-24 20-03-2024 02-05-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. Time Extn. 1
11. 32/EE/PCM-DKP/TN/2023-24 27-02-2024 27-04-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of spillway & roller bucket of bay no 3, 4 & 5, CC Blocks beyond the roller buckets of all spillway and pitching/retaining wall of approach road of Ichari dam Time Extn. 1 Time Extn. 2
12. 21/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 11.00 to 15.20) at left bank of river Yamuna of Lakhwar MPP Time Extn. 1
13. 20/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 6.2 to Km 9.00 upto Doligad) at left bank of river Yamuna of Lakhwar MPP Time Extn. 1
14. 01/EE(Quality)/LMP/2023-24 18-03-2024 23-04-2024 Dehradun Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun Executive Engineer Construction of 04 nos. B-Type residences for Lakhwar Project at Dakpathar, Dehradun Time Extn. 1
15. 11/EE(Civil-II)/LMP/2023-24 12-03-2024 23-04-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. Executive Engineer Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2024-25) Time Extn. 1
16. 21/EE(C-M)/DDN/2023-24 21-02-2024 23-04-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive annual maintenance contract (CAMC) of 03 Nos. Kone Make lifts installed at the New Corporate Office Building G.M.S. Road, Ujjwal Dehradun Time Extn. 1 Time Extn. 2
Download Tender
17. e-04/UJVNL/IT/EE(EM-II)/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Supply, installation, testing & commissioning of Advance Training System in Training Hall, UJVN Limited, “Ujjwal”, GMS Road, Dehradun Time Extn. 1
18. 18/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Transit camp at Lakhwar SubStation Kandriyan Time Extn. 1
19. 17/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair and maintenance of Sub-Station Building and protection of switchyard at Kandriyan. Time Extn. 1
20. 73/EE(M)/MB-II/23-24 13-03-2024 22-04-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Turbine Shaft Rubber Seal for 76MW Turbine at Dharasu Power House MB-II, Chinyalisaur Time Extn. 1
21. 72/EE(M)/MB-II/23-24 13-03-2024 22-04-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of consumable items at Dharasu Power House, MB-II Chinyalisaur Time Extn. 1
22. 27/EE-II (E&M)/LP/2023-24 22-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II Detailed Engineering & Designing, Procurement, Manufacturing, inspection, Transportation, site erection, installation, testing & commissioning of Early Warning System and Surveillance System of Lakhwar MPP
23. 26/2023-24/EE(C-M)Vyasi 14-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun Time Extn. 1
24. 38/EE/PCM/Dhalipur/ 2023-24 26-02-2024 22-04-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Protection work of Tail Race Channel (Asan River side) of Dhalipur Power House at Dhalipur, Dehradun Time Extn. 1 Time Extn. 2
25. 48/EE(Pathri)/2023-24 20-03-2024 20-04-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Design, Manufacturing, Supply, Erection, Testing & Commissioning of one no. Hydraulically Operated Trash Rack Cleaning Machine at Pathri Power House Time Extn. 1
26. 14/EE (Civil)/Lohiahead/Khatima/2023-24 02-03-2024 20-04-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Construction of Type- IV residences in residential complex at Sharda Power House, Lohiahead Khatima Udham Singh Nagar Time Extn. 1
27. 37/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Zinc coating of Draft tube gates, TRC gates, TRC outfall gates, Surge shaft gates and coating of outer periphery of MIV Inlet Outlet pipe surface at Vyasi HEP, Hathiyari.
28. 36/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Executive Engineer Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Supply and application of coating material on Spiral casing inner surface, Stay Vane & Stay ring surface and inlet pipe inner surface of one unit of Vyasi power house, Hathiyari
29. 28e/EE(G)/CPH/2023-24 15-03-2024 19-04-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply, Installation, Testing and Commissioning of Generator Transformer (75 MVA, 11/220 KV, 3-ø, 50Hz) with all accessories, including dismantling of the existing transformer at 4x60 MW Chibro Power House
30. 36/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Power house site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. Corrigendum 1
31. 35/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Surge shaft site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. Corrigendum 1
32. 34/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Dabrani and Gunga Adit site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.. Corrigendum 1
33. 33/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Barrage site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. Corrigendum 1
34. e-T.No.10/EE(Test)/DKN/2023-24 05-03-2024 19-04-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels at Kulhal Powerhouse Time Extn. 1
35. 03/EE(Civil-IV)/LMP/2023-24 25-03-2024 18-04-2024 Dakpathar Office of the Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/Reconstruction of motor road from Dam top to Mussorrie bend (Km 9.0 to Km 11.0) at left bank of river Yamuna of Lakhwar MPP
36. T-08/EE(Solar)//2023-24 18-03-2024 17-04-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun Executive Engineer Supply, Installation, Testing & Commissioning work of 100 KW(AC) Grid connected Roof Top Solar Power Plant on new office and two Solar Tree at “Ujjwal”, Maharani Bagh GMS Road, Dehradun
37. PDD-19/2023-24 16-03-2024 15-04-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply and fixing of 33 KV LA, earthing of CT/PT and concreting of four pole structure of 33 KV Dhakrani-Chibro feeder at Mazri.
38. e-28/EE(Gen)/Khodri/2021-22 10-01-2022 05-03-2022 Dakpathar E.E.-Generation Khodri Electrical and Mechanical Procurement of DC excitation cable. Corrigendum 1 Corrigendum 2 Corrigendum 3 Cancellation Notice