Tender Archieve
 

S.No Click Here To Download NIT Uploading Date Closing Date Circle Address Classification Description Corrigendum /
Downloads
1. 12/EE(M)/RPSK/2024-25 30-08-2024 13-09-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Coating on under water parts of unit-03
2. 11/EE(M)/RPSK/2024-25 24-08-2024 13-09-2024 PauriGarhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. PauriGarhwal Executive Engineer Hiring of one no. 32 seater non AC bus for transportation of employees of Ramganga Power Station, Kalagarh for a period of 12 calendar months
3. 08/EE(M)/2024-25 22-08-2024 13-09-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply of different filter spares for power house
4. 10/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-08-2024 13-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Repair and Reconstruction Work of drains in Type-IInd residential area at Hydel Colony Kalagarh
5. 05/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 13-09-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Annual Routine Maintenance of Electro-Mechanical and Hydro Mechanical Equipment of barrage including sweeping and cleaning for the year 2024-25
6. 06/EE(G)/Chilla/2024-25 23-08-2024 12-09-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Preventive Maintenance works of 36 MW Generator and associated equipment of Three Units of Chilla Power House.
7. 10/EE(H.Q.)/2024-25 22-08-2024 11-09-2024 Dehradun Office of the Executive Engineer (H.Q.), UJJWAL, Maharani Bagh, Dehradun Executive Engineer CANTEEN Work AT UJVNL “UJJWAL” MAHARANI BAGH, GMS ROAD, DEHRADUN
8. E-CH (Maint.) - 24/2024-25 21-08-2024 11-09-2024 Dehradun Office of Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing of damaged draft tube gate 1 set (Top & Bottom) at Chibro Power Station
9. E-CH (Maint.) - 23/2024-25 21-08-2024 11-09-2024 Dehradun Office of Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Capital Maintenance Work of 60 MW Hydro Turbine, Generator and Associated Equipment’s of Unit # 2 at Chibro Power Station
10. 05/EE(Test)/DKP/2024-25 22-08-2024 10-09-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Hiring of diesel vehicle (6+1-Seater) non-AC with driver for Test Unit, Dakpathar.
11. 09/EE(G)/CPH/2024-25 09-08-2024 10-09-2024 Chibro Chibro Executive Engineer Miscellaneous work of 4x60 MW Generator at Chibro Power House as & when required basis
12. 01/2024-25/EE(HM-I)/CD&H, Rishikesh 20-08-2024 10-09-2024 Dehradun For and on behalf of UJVN Limited, Executive Engineer (HM-I), CD&H, Pashulok, Rishikesh, Dehradun Executive Engineer Hiring of one no. light non-AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for DGM(CD-II) CD&H Office Dehradun
13. 07/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 10-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual Horticulture Maintenance, Development of Lawns and Clearing grass at Sharda Power House, Lohiahead for the year 2024-25
14. 06/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 10-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual General Cleaning work of Lohiahead colony for the year 2024-25
15. 04/EE(E&M)/PB/2024-25 17-08-2024 09-09-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Manufacturing & Providing of Spares of Barrage gates at Virbhadra Barrage, Rishikesh
16. 03/SPH/2024-25 16-08-2024 09-09-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual Maintenance (Generator & Electrical auxiliaries) of Unit # 1, 2 & 3 of Sharda Power House Lohiahead, Khatima
17. 01(GH)/EE (E&M-III)/Lakhwar/ 2024-25 17-08-2024 09-09-2024 Dehradun Office of the EE (E&M-III), Lakhwar, UJVN Ltd, Dakpathar (Dehradun) EE (E&M-III) Consultancy work to conduct feasibility study for Pilot Plant of Green Hydrogen Energy Generation
18. 01/EE(E&M - ISO)/2024-25/IMS 16-08-2024 09-09-2024 Dehradun Office of the Executive Engineer (E&M-ISO), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Consultancy services for ReCertification of Integrated Management System (ISO 9001:2015, 14001:2015, 45001:2018) in UJVN Ltd. for Phase-I, II, III, IV, V of UJVN Ltd.
19. 03/EE(E&M)/AB/ (2024-25) 18-08-2024 07-09-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Operation of TRCM for a period of one year at Asan Barrage, Dhalipur (Dehradun)
20. 02/EE(E&M)/AB/ (2024-25) 18-08-2024 07-09-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Caulking of Barrage Gates at Asan Barrage, Dhalipur, Dehradun .
21. 14/EEM/2023-24 17-08-2024 07-09-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of various fasteners for Units of Chilla Power House
22. 13/EEM/2023-24 17-08-2024 07-09-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of Miscellaneous Consumable Items for Units of Chilla Power House
23. 08/EE(Gen)/Khodri/2024-25 17-08-2024 06-09-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Annual Preventive Maintenance ofGenerator of Unit No. 1 at Khodri Power Station
24. 07/EE(M)/2024-25 14-08-2024 06-09-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Refilling of nitrogen cylinder
25. 06/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Installation, Testing, and Commissioning of 12 Nos. Potential Transformer including interfacing with existing control and protection scheme and dismantling of existing Capacitive Voltage Transformer installed at MB-II, Dharasu Power House
26. 05/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Strengthening of earthing and foundation of various 220 KV equipment installed at switchyard of MB-II Dharasu Power House.
27. 04/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Partial discharge Testing of Transformer at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi (Uttarakhand).
28. 03/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Testing of Transformer Oil at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi (Uttarakhand).
29. CH(M)-21/2024-25 03-08-2024 06-09-2024 Chibro Chibro Executive Engineer छिबरो विद्युत गृह के सेंट्रल स्टोर परिवहन अनुभाग के लिए अग्रिमक यंत्रों की आपूर्ति
30. 01/EE(E&M)/Maneri Dam/2024-25 13-08-2024 05-09-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer SITC of SCADA based real time level monitoring sensor for dam gallery seepage water pit at Maneri Dam, Uttarkashi
31. 10/EE(G)/CPH/2024-25 14-08-2024 04-09-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Polishing, Mirror machining work of spare Thrust Collar & Mirror Disk assembly for Unit 1 & 3 at Chibro Power Station
32. 15/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 14-08-2024 04-09-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Renovation of AE club at Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi.
33. 14/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 14-08-2024 04-09-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Finishing work of newly constructed Saraswati Vidya Mandir inter college at Shaktipuram Colony, MB-II, Chinyalisaur.
34. 11/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Repair & Maintenance of D, F, FH and LCT-Type Residences at Dakpathar Colony, Dakpathar, Dehradun
35. 14/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Repair & Maintenance of CT-Type, P-Type, E and CPT-Type residences at Dakpathar Colony, Dakpathar, Dehradun
36. 13/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil maintenance & repair works of A-Type, LA-Type & PIV-Type residences at Dakpathar Colony, Dakpathar Dehradun
37. 12/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of stores, workshops and other non-residential buildings at Dakpathar, Dehradun
38. 02/EE(CM)/DDN/2024-25 29-07-2024 04-09-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive annual maintenance of Firefighting, Fire alarm detection, public address system and related electrical works at the New corporate office building Ujjwal Maharani Bagh G.M.S. Road Dehradun.
39. 07/EE/PCM-DKP/TN/2024-25 06-07-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Dakpathar Barrage, Dakpathar, Dehradun.
40. 03 /EE(E&M)/Ichari dam/ 2024-25 13-08-2024 03-09-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Annual contract for Operation & Maintenance of LT panels, DG set and lighting system of Ichari Dam in District Dehradun
41. 02 /EE(E&M)/Ichari dam/ 2024-25 13-08-2024 03-09-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Annual cleaning of trash rack including disposal of trash at Ichari Dam in District Dehradun.
42. 04/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 03-09-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Shifting of 11kV MVCC HRT Line near Vikas Bhawan, Ladari, Uttarkashi
43. 03/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 03-09-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Supply and Repairing of Bi-Directional Sirens at Joshiyara barrage, Uttarkashi
44. 05/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 02-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual M & R work of Sharda Power House, Lohiahead for the year 2024-25
45. 09/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 09-08-2024 02-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Interior Painting in Type-III residences and Aluminum Painting work over APP on the roofs of Type- I, II, III & IV residences at Hydel Colony Kalagarh
46. 08/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 09-08-2024 02-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Type – I & Type- A Residences at Hydel Colony Kalagarh
47. 10/EE (M)/MB-II/2024-25 08-08-2024 31-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual/Capital Maintenance of Machine No 1,2,3,4 of Dharasu Power House for the Year 2024-25
48. 08e/EE(G)/CPH/2024-25 09-08-2024 30-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual Contract for operation of 33/11kV Sub Station and maintenance of 11kV lines (44KM approx) at Chibro Power House
49. CH (Maint.) – 22/2024-25 08-08-2024 30-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply of Self Lubricating Guide Vane Bushes (Top, Middle) and Lip Seal of 60 MW Machines at Chibro Power Station.
50. 11/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Runner Servo Tube Assembly for Units of Chilla Power House.
51. 10/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer O&M & Repairing and Maintenance works of Three Phase Induction Motor at Power House
52. 09/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Removal of silt from drainage/dewatering gallery nearby area at Power House
53. 03/EE(E&M)/DKP BRG/2024-25 02-08-2024 30-08-2024 Dakpathar Dakpathar Executive Engineer Safety audit/Inspection of various equipment of Dakpathar barrage, Distt-Dehradun.
54. 03/EE(Civil-I)/LMP/2024-25 18-07-2024 30-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Providing services for Site Offices of Lakhwar MPP
55. 01/EE(Civil-I)/LMP/2024-25 18-07-2024 30-08-2024 Dakpathar (Dehradun), Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Cleaning, Up-keeping, Gardening and minor repair works of Lakhwar Bhawan-I at Dakpathar (Dehradun).
56. 09/2024-25/EE(C-M)Vyasi Project 07-08-2024 29-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of community shed at Gram Panchayat Bhaler (Nakor), Vikasnagar, Dehradun
57. 13/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-08-2024 29-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Restoration of Damage Pulley Foundation at draft tube floor of Dharasu Power House Complex at Dharasu, Uttarkashi.
58. 12/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-08-2024 29-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Miscellaneous civil works at various location of Shaktipuram colony, MB-II project, Chinyalisaur, Uttarkashi.
59. 09/EE (M)/MB-II/2024-25 07-08-2024 28-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House.
60. 08/2024-25/EE(C-M)Vyasi Project 05-08-2024 28-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Repair, Maintenance & Strengthening of existing approach road from Barwala Lakhwar road to surge shaft (chainage 0.00 – 930.00 m) and internal road from Guard room to BL road via Hathiari sub – station (chainage 0.00- 300 m) of Vyasi HEP (2X60 MW) at Hathiyari, Dehradun
61. 06/UJVNL/EE(M&G)/KPS/2024-25 03-08-2024 28-08-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Hiring of one no. non AC Jeep (Bolero plus /TUV 300) (7-seater, Model 2021 or later) along with driver for one year.
62. 07/EE(HQ)/2024-25 29-07-2024 28-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Providing Manpower services for a period of one year on outsource basis for UJVNLtd. Head Office at Dehradun
63. 04/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer (M&G) Procurement of ABB make LT spares for different equipment
64. 03/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer (M&G) Fabrication and fixing of M.S Jali (Foldable type) at Intake and Penstock Gallery side
65. 02/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer(M&G) Hiring of one no. non-AC diesel light motor vehicle along with driver for one year
66. e-06/EE(M&G)/DKN/2024-25 03-08-2024 27-08-2024 Dhakrani Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Annual Maintenance Contract for various O&M activities at Dhakrani Power Station.
67. 09/EE(Pathri)/2024-25 05-08-2024 27-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Cleaning, Repairing & Overhauling of 02 nos. Generators & 12 nos. Generator Air Coolers of Pathri Power House.
68. 05/Executive Engineer (HQ)/2024-25 25-07-2024 27-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Miscellaneous Civil work at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun
69. 07/EE(Maint.)/Khodri/2024-25 25-07-2024 27-08-2024 Khodri Khodri Executive Engineer Safety audit of power house equipments of Khodri Power Station, khodri
70. 03/EE(E&M-SHP)/Kaliganga-II/2024-25 24-07-2024 27-08-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Design, drawing with detail engineering of MIV pit dewatering system and modification of existing open loop cooling water system to close loop cooling water system for Kaliganga-II SHP (2x2.25 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
71. 09/Executive Engineer (HQ)/2024-25 05-08-2024 26-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Annual maintenance, cleaning and upkeep of buildings at “UJJWAL” campus at Dehradun
72. 01/EE(M)/2024-25 05-08-2024 26-08-2024 Dehradun Office of the Executive Engineer (Monitoring) “Üjjwal”, GMS Road, Dehradun Executive Engineer Preparation of petitions for true up of FY 2023- 24, Annual Performance Review (APR) for FY 2024-25 and Multi Year tariff for the Control Period from FY 2025-26 to FY 2029-30 along with Business Plan for the control period of (05) Five financial years from April 1, 2025 to March 31, 2030 of UJVN Limited
73. 01/EE(M)/2024-25 04-08-2024 25-08-2024 Dehradun Office of the Executive Engineer (Monitoring) “Üjjwal”, GMS Road, Dehradun Executive Engineer Preparation of petitions for true up of FY 2023- 24, Annual Performance Review (APR) for FY 2024-25 and Multi Year tariff for the Control Period from FY 2025-26 to FY 2029-30 along with Business Plan for the control period of (05) Five financial years from April 1, 2025 to March 31, 2030 of UJVN Limited
74. 12/EEM/2024-25 09-08-2024 24-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for DGM (HGC), Chilla
75. 05/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Strengthening of Firefighting Hydrant system
76. 04/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of one No. Non-AC Diesel Vehicle for DGM HGC Dhakrani on annual contract basis.
77. 03/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Maintenance Contract for Grass Cutting & Gardening activities
78. 06/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repairing, Servicing and Overhauling of 66KV Isolators & Earth Links at Mohammadpur Power House
79. 05/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Application of Cold galvanizing/zinc rich coating on structures of 66KV switchyard of Mohammadpur Power House
80. 04/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Servicing & repairing of 27.5 TR, Ductable AC, Hitachi make at Mohammadpur Power House
81. 08/Executive Engineer (HQ)/2024-25 03-08-2024 23-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Annual Operation, maintenance, cleaning and upkeep of UJVN Ltd transit accommodation at Mussoorie, Dist.-Dehradun
82. 05/EE(Generation)/Vyasi/2024-25 02-08-2024 23-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Installation, Testing and Commissioning of 250KVA (11KV/440V) Transformer and LT distribution board with 11 KV cabling in Surge Shaft Area of Vyasi HEP.
83. 02/EE(E&M)/Dharchula/2024-25 27-07-2024 23-08-2024 Dharchula Office of the Executive Engineer (E&M), UJVN Limited, Dharchula, District Pithoragarh Executive Engineer (E&M) Repairing and protection work of 33 KV power evacuation line and 3 phase 4 wire LT line of 2x2.5 MW Suringad Stage-II SHP
84. 01/UJVNL/EE(C-SBR)/2024-25 26-07-2024 23-08-2024 Pithoragarh Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh Executive Engineer Hiring of one number diesel driven small vehicle for 12 months alongwith driver for Executive Engineer (Civil), SBR Project, UJVN Ltd., Munsiyari in distt. Pithoragarh.
85. 06/EE(Maint.)/Khodri/2024-25 25-07-2024 23-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Modification, Rectification and overhauling Work of 115/25Ton EOT Crane (Make- jessop) at khodri Power Station.
86. 07/EE(G)/CPH/2024-25 31-07-2024 22-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual maintenance of 60 MW generator & associated equipment of unit 1 & 4 at Chibro Power House
87. 05/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Repairing of various types of LED luminaries installed at Dakpathar Barrage
88. 04/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Dakpathar Executive Engineer Annual maintenance contract for barrage control and monitoring systems of Dakpathar Barrage
89. 02/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Dakpathar Executive Engineer Refilling of various types of Fire Extinguishers at Dakpathar barrage, Distt-Dehradun
90. 07/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Application of insulation epoxy coating on floor areas of Electric panels located at different place at Khodri Power Station.
91. 06/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Annual Preventive Maintenance of Generator of Unit No. 3 & 4 at Khodri Power Station.
92. 05/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply and Replacement of different type of valves of cooling lines of Khodri Power Station.
93. 06/EE(M)/2024-25 31-07-2024 22-08-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply of different gate valves for power house
94. 02/EE(Civil-SHP)/Dharchula/2024-25. 14-06-2024 22-08-2024 Dharchula Office of the Executive Engineer (Civil-SHP), UJVN Ltd., Dharchula Executive Engineer “Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) for 12 months along with driver for Dy. General Manager (E&M-SHP), UJVNLtd., Pithoragarh.:”
95. 02/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Supply, Installation, Testing, Commissioning & Net metering work of 12 kW Grid connected roof top Solar Power Plant on General Manager (Ganga) Office, UJVN Ltd, Mayapur, Haridwar.
96. 05/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 4 KW Roof Top Solar Power Plant at Office of DGM, Dhakrani
97. 04/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 8 KW Roof Top Solar Power Plant at Training Centre, Dhakrani
98. 03/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 8 KW Roof Top Solar Power Plant at Adhikari Avagaman Shivir, Dhakrani
99. 01/EE (Civil-I)/Urgam/2024-25 25-07-2024 21-08-2024 Srikot-Srinagar Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Annual Repair & Maintenance work of Civil structures at Urgam SHP (2X1.5) MW in Distt- Chamoli
100. CH(Maint.)-20/2024-25 30-07-2024 20-08-2024 Executive Engineer Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance Works of Unit no 01 at Chibro Power Station
101. CH(Maint.)-19/2024-25 30-07-2024 20-08-2024 Executive Engineer Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Miscellaneous repair & maintenance works of auxiliary systems of 60 MW Turbine of Chibro Chibro Power Station
102. 10/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Repairing & Overhauling of OPU System of unit-2 and unit-3
103. 09/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Fabrication, Supply and Installation of runner cones
104. 07/2024-25/EE(C-M)Vyasi Project 29-07-2024 20-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance) Executive Engineer (Civil-Maintenance) Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
105. 08/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station Executive Engineer (M) Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for Dy. General Manager (E&M) Kalagarh
106. 07/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station Executive Engineer (M) Hiring of one no. diesel driven AC LMV alongwith driver for the office of the GM (R&S) for a period of one year
107. 10/EE/PCM-DKP/TN/2024-25 29-07-2024 20-08-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Treatment of Right Side Hill Slope and Strengthening of Fencing of Surge Tank at Khodri Power House, Khodr
108. 09/EE/PCM-DKP/TN/2024-25 29-07-2024 20-08-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of Escape Channel & Spilling Surge Shaft Structures of Khodri Power House, Khodri
109. 03/EE/PCM/Dhalipur/ 2024-25 22-07-2024 20-08-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damaged structures of Syphon located at km 3.25 and km 3.68 of power Channel between Asan Barrage to Kulhal Power House
110. 02/EE (Civil-I)/Urgam/2024-25 03-08-2024 17-08-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Restoration work at Forebay Escape pipe and allied work at Urgam SHP (2x1.5 MW) in Distt. Chamoli
111. 04/EE/PCM/Dhalipur/ 2024-25 03-08-2024 17-08-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Construction of Transformer Foundation & Rail Line Laying work at Dhalipur Power House Switch-Yard, Dhalipur, Dehradun
112. 09/EE(G)/Klg/2024-25 27-07-2024 17-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Cleaning, repair and testing of Hydro Generator coolers of unit No 1, 2 & 3
113. 08/EE(G)/Klg/2024-25 27-07-2024 17-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal)27 Executive Engineer Refilling of fire extinguishers including supply of accessories.
114. 05/EE(M)/2024-25 27-07-2024 17-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Repair & maintenance of 33 KV transmission line between Tiloth & Heena substation
115. 04/EE(Test)/DKP/2024-25 26-07-2024 16-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Arrangement of 220V DC redundant supply for feeder no.83 & 84 and bus coupler in Switchyard at Chibro Power House
116. 01/EE/M&G/DLR/ 2024-25 26-07-2024 16-08-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Hiring of one no. (27-seater) School Bus and one no. School Van (10-Seater) for Academic year 2024-25 & 2025-26.
117. 04/EE(M)/2024-25 26-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Annual sweeping cleaning & bush cutting work of different substations
118. 03/EE(M)/2024-25 26-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Removal and disposal of wet silt form various places of power house
119. 01/EE(CM)/DDN/2024-25 26-07-2024 16-08-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of multi-storey New corporate office building of UJVN Limited at UJJWAL campus, G.M.S. road, Maharani Bagh, Dehradun
120. 11/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 23-07-2024 16-08-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and maintenance of rooms and other miscellaneous works at Officer’s field hostel, Shaktipuram colony, MBII Chinyalisaur.
121. 08/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual upkeeping & cleaning of Badminton Court/ Multipurpose Hall at Shaktipuram colony Chinyalisaur Uttarkashi.
122. 03/EE(Test)/DKP/2024-25 25-07-2024 14-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Replacement of current transformer 2000/5A on 11 kV generator side busbar at Khodri Power Station.
123. 02/EE(Test)/DKP/2024-25 25-07-2024 14-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Supply and fixing of insulation mat around LV and HV panels in Khodri and Chibro Power Station.
124. 05/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Annual maintenance work related to turbine & associated parts of Unit No. 3&4 of Khodri Power Station
125. 04/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer SITC of 25 H.P. VT Pump with Motor at Khodri Power Station
126. 03/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Supply and Fixing of Rubber Seal in 02 Nos. Surge Tank Gates of Khodri Power Station
127. 04/EE(Generation)/Vyasi/2024-25 24-07-2024 14-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Work of Fiber Splicing & other Miscellaneous Work of Overhead OFC Line from Vyasi Power House Hathiyari to Juddo Dam Site
128. 01/EE(E&M)/Ichari dam/ 2024-25 19-07-2024 14-08-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Safety audit of tools & equipments at Ichari Dam in district Dehradun
129. CH(Maint.) – 18/2024-25 23-07-2024 13-08-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance Works of Unit no 03 & 04 at Chibro Power Station
130. CH(Maint.)- 17/2024-25 23-07-2024 13-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Application of Coating Material on Draft Tube Chamber, Draft Tube Window & Stay vanes of Unit No. 01 at Chibro Power Station
131. 03/EE(E&M)/PB/2024-25 27-07-2024 12-08-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Electrical Maintenance of colonies and Virbhadra Barrage at Pashulok, Rishikesh
132. 06/EE(G)/CPH/2024-25 20-07-2024 12-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Detailed assessment by diagnostics & Engineering analysis for incipient fault prediction of MVA Generating Transformers at Chibro Power House
133. 05/EE(G)/CPH/2024-25 20-07-2024 12-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Rewiring and Installation, testing & commissioning of energy efficient LED light fixtures by replacing Induction light in machine hall at Chibro Power House
134. 05/UJVNL/EE (M&G)/KPS/2024-25 21-07-2024 12-08-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Maintenance Contracts (AMC) for Colony Maintenance work (Elec/Mech) at Kulhal Power Station
135. 6/EE(M)/RPSK/2024-25 21-07-2024 12-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven non AC light motor vehicle for emergency duties for a period of twelve months at Ramganga Power Station, Kalagarh, Distt. Pauri Garhwal.
136. 5/EE(M)/RPSK/2024-25 21-07-2024 12-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual Maintenance of Unit-02 and 03 and Hiring of one no. non AC LMV for emergency duties at Ramganga Power Station, Kalagarh.
137. 08/EE(Pathri)/2024-25 20-07-2024 10-08-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Providing services of Divers to carry out the underwater works of Pathri Power House
138. 03/EE(Civil-II)/Guptkashi/2024-25 26-07-2024 09-08-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Operation and Monitoring of all Civil structures at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
139. 06/Executive Engineer (HQ)/2024-25 25-07-2024 09-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Electrical Re-wiring of Training Hall “UJJWAL” UJVN Ltd , Maharani Bagh, G.M.S. Road, Dehradun
140. 02/EE(E&M)/MB-II/Barrage/2024-25 19-07-2024 09-08-2024 Uttarkashi The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Cleaning of trash rack through Diving Team at Joshiyara Barrage Uttarkashi for the period of six months
141. 01/EE(E&M)/MB-II/Barrage/2024-25 19-07-2024 09-08-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Hiring of 02 Non-AC diesel vehicles at Joshiyara Barrage, Uttarkashi for the period of one year
142. 10/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 16-07-2024 09-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Miscellaneous Civil Work in BP Type Quarters at Shaktipuram colony, Chinyalisaur, Uttarkashi .
143. 04/2024-25/EE/PCM(GV)/Mayapur 18-07-2024 08-08-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Making Temp. Bund at Right Bank of Mundal Nala for the Protection from Flood at a Distance of 1.50 KM (Approx.) Upstream of Mundal Bridge.
144. 03/2024-25/EE/PCM(GV)/Mayapur 18-07-2024 08-08-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Providing Approach Road for Block-B of Type-IIIrd Residential Building at Mohammadpur
145. 04/EE(Civil-I)/LMP/2024-25 18-07-2024 08-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Maintenance of Project Roads of Lakhwar Multipurpose Project.
146. 02/EE(Civil-I)/LMP/2024-25 18-07-2024 08-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Cleaning, Up-keeping and Maintaining of Kandriyan field Hostel of Lakhwar MPP
147. 08/EE (M)/MB-II/2024-25 18-07-2024 08-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of Two no. (8+1) seater, Two No. (6+1) seater and One No. Utility/Camper (Mahindra/Tata/equivalent) non- A.C. Diesel vehicles along with drivers
148. 01/EE (Civil-IV)/LMP/2024-25 23-07-2024 06-08-2024 Dehradun Office of The Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) Executive Engineer Dismantling, Shifting, Establishment and Operation of bank operated cable way based Gauge and Discharge measurement site on river Yamuna for Lakhwar Multipurpose Project
149. 07/EE(Pathri)/2024-25 16-07-2024 06-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Servicing of End Suction Type Horizontal Centrifugal Pumps of Cooling Water System & Procurement of its allied spares at Pathri Power House
150. 06/EE(Pathri)/2024-25 16-07-2024 06-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Supply, fabrication and fixing of G.I. drinking water pipeline at Pathri Power House
151. 07/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of spares for EHG100/G-40 Governor of Turbine at Dharasu Power House, MB-II, Uttarkashi.
152. 06/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of Drainage Pumps of Dharasu Power House
153. 05/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Guide vane leaver assembly at Dharasu Power House
154. 04/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Air Release Valve of 76 MW Turbine at Dharasu Power House
155. 03/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of 110kw Vertical Type Dewatering Pump at Dharasu Power House, MB-II
156. e-01/UJVNL/IT/EE(EM-II)/2024-25 29-06-2024 06-08-2024 Dehradun Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Maintenance and Support of SAP ERP at UJVN Limited
157. 02/EE(Maint.)/Khodri/2024-25 15-07-2024 05-08-2024 Dehradun Office of Executive Engineer (Maintenance), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of 2 Nos. school bus for wards of UJVNL employees located at Dakpather
158. 05/EE(M)/VP/2024-25 16-07-2024 05-08-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Annual maintenance contract of hydro-mechanical gates of Vyasi Power House at Hathiyari
159. 03/2024-25/EE(C-M)Vyasi Project 09-07-2024 05-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Seepage treatment by Polyurethane grouting at different areas/locations inside Power House building of Vyasi HEP at Hathiyari, Dehradun
160. 06/2024-25/EE(C-M)Vyasi Project 19-07-2024 02-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Dy. General Manager (Civil-Maintenance), Vyasi HEP Dakpathar, Dehradun for period of one year
161. CH (Maint.) – 16/2024-25 12-07-2024 02-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Procurement of various Rubber consumables for 60 mw machines of Chibro Power Station
162. 07/EE(G)/Klg/2024-25 11-07-2024 02-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal), Executive Engineer Annual Maintenance Contract for Routine Maintenance Activities
163. 03/EE(Generation)/Vyasi/2024-25 12-07-2024 02-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Establishment of workshop and site store for Generator section at Vyasi Hydro Power Station (2x60MW), Hathiyari (Dehradun)
164. CH(Maint.)-12/2024-25 02-07-2024 02-08-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of School Bus with Driver and Attendant for St. Mary’s Convent School, Vikasnagar.
165. PDD-06/2024-25 13-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Supply and Repairing of 60 Watt LED Street Lights.
166. PDD-05/2024-25 13-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Annual Contract for operation of 11/0.4 KV Sub Station No-01 Tons Colony Dakpathar
167. 05/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of damaged pathway to cremation place & platform for cremation for Vyasi HEP affected village Dindal & Gaski on the right bank of river Yamuna at Juddo, Dehradun
168. 05/EE(E&M)/Vyasi Dam/2024-25 12-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Annual Running & Maintenance of 05 KLD sewage Treatment Plant (STP), MBBR Based Technology at Vyasi Dam, Juddo Dist- Dehradun.
169. 01/EE (GC)/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Hiring of one No. Covered body light diesel vehicle (M&M Make Bolero or equivalent) along with driver on rent basis for 12 months for Executive Engineer and Assistant Engineer as pool vehicle for Galogi SHP and office, Ganga Bhawan, Dehradun
170. 05/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of damaged pathway to cremation place & platform for cremation for Vyasi HEP affected village Dindal & Gaski on the right bank of river Yamuna at Juddo, Dehradun
171. 05/EE(E&M)/Vyasi Dam/2024-25 12-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Annual Running & Maintenance of 05 KLD sewage Treatment Plant (STP), MBBR Based Technology at Vyasi Dam, Juddo Dist- Dehradun
172. 04/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of shed for Mata Vaishno Devi Temple at Vyasi project affected village Juddo
173. 04/EE(Gen)/Khodri/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Re-tubing of Generator Air coolers (05 Nos.) of Unit # 2 at Khodri Power Station
174. 03/EE(Gen)/Khodri/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Heavy Duty Hydrophobic Water & Moisture Displacer Protective Coating in 33 KV Panel along with other related work in 33KV breaker panel at Khodri Power Station
175. 03/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of services of Divers to carry out the underwater works of Power House
176. 02/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of one no. diesel vehicle (along with driver’s services) for official use of Executive Engineer and one no. driver for running of departmental ambulance for a period of one year.
177. 01/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of One non AC Vehicle for School going Children and Power house/office works at Mohammadpur Power House for one year
178. PDD-04/2024-25 12-07-2024 31-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Hiring of one no. diesel driven vehicle (Mahindra Bolero Camper/Tata Xenon Crew with cabin or equivalent) along with driver (02 Nos.) for one year.
179. PDD-03/2024-25 12-07-2024 31-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Hiring of one no. diesel driven vehicle (Mahindra Bolero Plus/TUV-300 or equivalent) along with driver for one year.
180. 09/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 31-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of one number Bolero or equivalent Non AC Diesel Vehicle (Model 2021 and onwards) along with driver for site supervision under E.E.( Civil) Division of MB-II, Chinyalisaur for the period of 12 months
181. 07/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 31-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Laying of Cement concrete approach pathway from central store to neri village at Dharasu Power House, MB-II, Dharasu, Uttarkashi.
182. 01/EE-II (E&M)/LP/2024-25 25-06-2024 31-07-2024 Dakpathar Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar Executive Engineer-II SITC of Internet Networking at New Office Building Lakhwar Bhawan-II Dakpathar, Dehradun
183. 05/2024-25/EE(C)/Pashulok Barrage 10-07-2024 30-07-2024 Rishikesh Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of Type-B, Type-C & Type-D Residences at Barrage Colony, Pashulok, Rishikesh.
184. 04/2024-25/EE(C)/Pashulok Barrage 10-07-2024 30-07-2024 Rishikesh Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of Type-A Residences at Barrage Colony, Pashulok, Rishikesh.
185. 08/EEM/2024-25 08-07-2024 29-07-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Enginee Repair of Drainage & Dewatering Pumps of Power House.
186. 04/Executive Engineer (HQ)/2024-25 06-07-2024 29-07-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Excavation, supply, installation of items for Rain Water Harvesting at UJJWAL campus, Maharani Bagh, G.M.S. Road, Dehradun
187. 08/EE/PCM-DKP/TN/2024-25 06-07-2024 29-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair of Khodri Power House and allied structure at Khodr
188. 02/EE(E&M-SHP)/Kaliganga-II/2024-25 04-07-2024 29-07-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi, Executive Engineer Annual Operation and Maintenance of Kaliganga-II SHP (2x2.25 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag.
189. 07/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual General Cleaning work of Hydel Colony Kalagarh
190. 06/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M&R work of Type-III & IV residences at Hydel Colony Kalagarh
191. 05/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual Horticulture Maintenance and Development of Park at Ramganga Power House Kalagarh
192. 01/EE (M)/MB-II/2024-25 24-06-2024 29-07-2024 Uttarkashi office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of TGB Housings of 76 MW Turbines at Dharasu Power House, Uttarkashi
193. 04/UJVNL/EE(M&G)/KPS/2024-25 20-07-2024 27-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Cleaning of drain water sump, sealing water tank, penstock gallery flushing of cooling water strainer and Bye pass gate charging pit for the period of one year of Kulhal Power House
194. CH(Maint.)-15/2024-25 05-07-2024 27-07-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Fixing of various valves of Machine # 2 at Chibro Power Station
195. 03/Executive Engineer (HQ)/2024-25 05-07-2024 27-07-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Construction of Boundary wall and Drain near new corporate Building at UJJWAL campus, Maharani Bagh, G.M.S. Road, Dehradun
196. 01/EE(E&M-SHP)/KG-II/2024-25 02-07-2024 27-07-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Supply, Installation, Testing and Commissioning of 250 KVA, (320-480/415±1% V) Copper Wound Constant Voltage Transformer (Servo) for Kaliganga-II SHP (2x.25 MW+15%COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
197. 03/EE (E&M)/(SHP)/Rishikesh/2024-25 29-06-2024 27-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Annual Operation and Maintenance for RPN SHP (2x750kW) Dunao, in District- Pauri Garhwal, Uttarakhand
198. 01/EE(Civil-SHP)/Dharchula/2024-25. 14-06-2024 27-07-2024 Dharchula Office of the Executive Engineer (Civil-SHP), UJVN Ltd., Dharchula Executive Engineer “Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) as pool vehicle for 12 months along with driver for the office of Executive Engineer (Civil-SHP), UJVNLtd., Dharchula .”
199. 01/EE(E&M)/AB/2024-25 12-07-2024 26-07-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Cleaning of Trash Rack at Asan Barrage, Dhalipur for a period of one year.
200. 02/EE(Gen)/Vyasi/24-24 11-07-2024 26-07-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Development & Maintenance of Garden and Operation of Canteen at Vyasi Power House.
201. 06/EE/PCMDKP/TN/2024-25 04-07-2024 26-07-2024 Dehradun Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Sweeping, cleaning & upkeep works of Vidyut Bhawan, Project Distribution Division Office & Project Civil Maintenance-Dakpathar Office at Dakpathar, Dehradun.
202. 05/EE/PCM-DKP/TN/2024-25 04-07-2024 26-07-2024 Dehradun Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Hiring of one number diesel vehicle such as Mahindra Bolero or equivalent (excluding fuel) as a pool vehicle without driver for Project Civil Maintenance Dakpathar.
203. 01/EE(Test)/DKP/2024-25 05-07-2024 26-07-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Hiring of diesel vehicle (6+ 1) seater (Non AC) with driver “for one year”
204. 06/EE(G)/Klg/2024-25 04-07-2024 26-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Complete overhauling of Generator Transformer cooling systemalongwith supply & fixing of water cooling pipeline of all threeunits
205. 05/EE(G)/Klg/2024-25 04-07-2024 26-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Mainexciter, PMG, stator core, air cooling ventilating duct, 11KV busduct & Generator transformer of Unit # 3
206. 01/EE(E&M)/(SHP)/RISHIKESH/2024-25 24-06-2024 26-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Supply of safety items for RPN SHP Dunao, District Pauri Garhwal, Pilangad SHP. District Uttarkashi, Urgam SHP, District Chamoli .
207. 01/EE(E&M)/DKP BRG/2024-25 05-07-2024 25-07-2024 Dakpathar Dakpathar Executive Engineer Hiring of one number non-AC Diesel vehicle (Mahindra Bolero Plus or equivalent) along with driver for Dakpathar Barrage, Dakpathar, Dehradun (excluding the cost of fuel) on contract basis for one year.
208. e-02/EE(M&G)/DKN/2024-25 03-07-2024 25-07-2024 Dehradun Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Hiring of vehicles for school going children of employees posted at Dhakrani Power Station
209. 04/EE/PCM-DKP/TN/2024-25 03-07-2024 25-07-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Hydel Colony, Old Yamuna Colony, New Yamuna Colony, main road from Dakpathar Tiraha to New Yamuna Colony and by pass road from Tikona Park to main gate of Play Ground near Barrage at Dakpathar, Dehradun
210. 03/EE/PCM-DKP/TN/2024-25 03-07-2024 25-07-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Tons Colony, Gole Market Colony, Colony Behind Post Office and main road from Dakpathar Bus Station to main gate of play ground near Barrage via Nehru Market and GMVN at Dakpathar, Dehradun
211. 02/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 25-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual Operation, Cleaning & Up-keeping of Staying Facility and Office of Executive Engineer (Civil), UJVN Ltd. at Sharda Power House, Lohiahead Khatima for the year 2024-25
212. 01/EE(Civil)/Lohiahead/Khatima/2024-25. 11-06-2024 25-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Hiring of Non A.C. Diesel Vehicle (Bolero or Equivalent Model 2022 or above) with Driver for Executive Engineer (Civil), Lohiahead (Khatima), for one year
213. 01/EE(Generation)/Vyasi/2024-25 03-07-2024 24-07-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer “Annual Running & Maintenance of 10 KLD Sewage Treatment Plant (STP), MBR based technology at Vyasi Power House, Hathiyari (Dehradun)
214. 05/EE(Pathri)/2024-25 02-07-2024 24-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Repair & maintenance of overhead LT Line supplying LT Power to Bypass regulator gates
215. 03/EE(Pathri)/2024-25 02-07-2024 24-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Providing & fixing of energy efficient lighting system in Pathri Power House
216. 01/EE (GEN)/MB-II/2024-25 24-06-2024 24-07-2024 Chinyalisaur Chinyalisaur Executive Engineer PROCUREMENT OF GENERATION LOG BOOK AND STATIONARY ITEMS FOR DHARASU POWER HOUSE.
217. 02/2024-25/EE(C-M)Vyasi 08-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Executive Engineer (Civil-Maintenance), Vyasi HEP Dakpathar, Dehradun for period of one year
218. 02/EE(Civil)/MB-I/TN/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual O&M of 4 KLD STP at Maneri Dam of MB-I HEP at Maneri, Uttarkashi.
219. 01/EE(Civil)/MB-I/TN/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual maintenance and repair of Maneri Dam Complex at Maneri, Uttarkashi.
220. CH(Maint.)-14/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of Pool vehicle 7-seater (Mahindra Bolero/TUV 300/Eq.) with driver for sites under DGM(HGC) Dakpathar.
221. CH(Maint.)-13/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of Vehicle (Mahindra Bolero/TUV300/Eq.) with driver for office of the EE(Maint.), Chibro Power Station.
222. CH(Maint.)- 11/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance contract for the works of transport & Central Store, Chibro Power Station
223. 02/EE(M)/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Annual Operation and maintenance of water supply from tube well plant to CWR Tiloth and CWR Tiloth to Kuteti Devi Colony
224. 01/EE(M)/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Hiring of 1 no. non AC diesel vehicle and 1 no. utility diesel vehicle for power house
225. 02/EE/PCM/Dhalipur/ 2024-25 01-07-2024 22-07-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damage road on right side of power channel from Court bridge to Skew bridge Dhalipur, Dehradun
226. 01/EE(Civil)/Tiuni-Plasu/2024-25 28-06-2024 22-07-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd, Dakpathar (Dehradun) Executive Engineer Sweeping, cleaning, upkeep & Civil maintenance works of office of Arakot-Tiuni & Tiuni Plasu at Dakpathar, Dehradun.
227. 01/EE(P&C)/2024-25 28-06-2024 20-07-2024 Dehradun Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun Executive Engineer Procurement of different Tubeless tyre for various Power House/Sites of UJVN LTD.
228. 04/EE(Pathri)/2024-25 28-06-2024 19-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Procurement of Submersible Pumps at Pathri Power House.
229. 02/EE(E&M)/(SHP)/RISHIKESH/2024-25 24-06-2024 19-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Hiring of one no. of non AC light diesel vehicle (M&M Bolero camper/ Double cabin or equivalent) without driver for one year on rent basis for Urgam SHP (2x1500 kW) in District Chamoli
230. 07/EEM/2024-25 27-06-2024 18-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer SITC of 3 Ton (Remote Operated) Electric hoist Crane at Central Store at Chilla
231. 04/EE(G)/CPH/2024-25 27-06-2024 18-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Re-Tubing and testing of bearing coolers for unit 2 & 4 at Chibro Powerhouse
232. 03/EE(G)/CPH/2024-25 27-06-2024 18-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Printing of various log books and supply of cartridges & stationary at Chibro Power Station
233. 01/EE(Test)/DKN/2024-25 26-06-2024 18-07-2024 Dehradun Dehradun Executive Engineer Hiring of One No. Non - AC Diesel Vehicle (Mahindra Bolero/TUV300 or equivalent vehicle model-2022 or later) for Executive Engineer (Test), Dhakrani for a period of Twelve Calendar Months
234. 01/EE(E&M)/Dharchula/2024-25 25-06-2024 18-07-2024 Dharchula Office of the Executive Engineer (E&M), Dharchula Executive Engineer Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) for 12 months alongwith driver as pool vehicle for the 2x2.5MW Suringad SHP, Munsyari, Dist.- Pithoragarh (Uttarakhand)
235. 06/EE(E&M-I)/LP/2024-25 25-06-2024 18-07-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer SITC of Video Conferencing System at Conference Room of Kandriyan Field Hostel, Lakhwar MPP, Dakpathar
236. 02/EE(E&M-II)/LP/2024-25 25-06-2024 17-07-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II Various Electrical works under Lakhwar MPP
237. 04/EE(E&M)/Vyasi Dam/2024-25 26-06-2024 17-07-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Supply, Testing & refilling of various Fire Extinguishers at Vyasi Dam Site Juddo, Dehradun
238. 05/EE(G)/2024-25 27-06-2024 16-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Cleaning of Intake Trash Rack of Chilla Power House.
239. 03/UJVNL/EE (M&G)/KPS/2024-25 25-06-2024 16-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer AMC of Hydromechanical governors installed at Kulhal Power Station along with other associated works
240. 02/EE (GEN)/MB-II/2024-25 24-06-2024 16-07-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and re-insulation of 1 No. rotor pole coil of 76 MW Hydro Generator, MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi
241. 06/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Graffiti wall painting work at Ramleela ground, Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi
242. 05/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Re-construction of damaged nigam boundary wall near water storage tank at Shaktipuram colony, MB-II project,Chinyalisaur,Uttarkashi.
243. 04/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Maintenance of water Supply system for residential and non- residential buildings of Shaktipuram colony Chinyalisaur, Uttarkashi
244. 03/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Upkeeping and maintenance work of Parks at various location of Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi.
245. 03/EE(E&M)/Vyasi Dam/2024-25 25-06-2024 16-07-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVNLtd Executive Engineer Supply & Laying of HDPE pipe for providing Dump yard water supply at Vyasi Dam, Juddo, Dakpatthar (Dehradun).
246. CH(Maint.)- 10/2024-25 24-06-2024 15-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Refurbishment of 02 Set TGB Pads and complete dismantling, Ultrasonic Testing, Blue-Matching, Installation & Commissioning of 01 Set TGB Pads of 60 MW Francis Turbine of Chibro Power Station
247. CH(Maint.)- 09/2024-25 24-06-2024 15-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing & maintenance of 15 Ton Hoist beam of Draft Tube crane at Chibro Power Station.
248. 02/EE(M)/MB-II/24-25 24-06-2024 15-07-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement Of Coating Material For Turbine At Dharasu Power House
249. 01/EE(Civil)/KB/2024-25 22-06-2024 15-07-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special Repair of approach road from Ambari More to Dakpathar Bus stand at Dakpathar, Dehradun
250. 04/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Ramganga Power House Kalagarh
251. 03/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual Horticulture Maintenance & Development of Parks and Play Ground at Hydel Colony Kalagarh
252. 02/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Type - II Residences at Hydel Colony Kalagarh
253. 03/2024-25/EE(C)/Pashulok Barrage 22-06-2024 12-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Strengthening of Surveillance & Monitoring System for Security Supervision at Virbhadra Barrage, Rishikesh.
254. 04/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Main exciter, PMG, stator core, air cooling ventilating duct, 11KV bus duct & Generator transformer of Unit # 2
255. 03/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Main exciter, PMG, 11KV bus duct & Generator transformer of Unit # 1
256. 02/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Supply and fixing of LT power cables from Excitation Panels to Generators of Unit no. 01 & 2
257. T-06/EEM/2023-24 21-06-2024 11-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repair of Mechanical Store in Central Store at Chilla Power House.
258. T-05/EEM/2023-24 21-06-2024 11-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Rotating Shaft Sleeve for Units of Chilla Power House
259. 02/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-06-2024 11-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual sweeping & cleaning work of Shaktipuram colony premises at MB-II, Chinyalisaur, Uttarkashi
260. 01/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-06-2024 11-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Civil Maintenance of Dharashu Power House Complex at Dharashu, Uttarkashi
261. CH(Maint.)-08/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Caulking of Surge Tank gate of Chibro Power Station
262. CH(Maint.)-07/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of vehicle (Mahindra Bolero/TUV 300/Eq.) with driver for office of the DGM, HGC, Dakpathar.
263. CH(Maint.)-06/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing of 01 No. Francis runner at Chibro Power Station.
264. 04/EE(M)/RPSK/2024-25 20-06-2024 10-07-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual operation & upkeeping of Inspection House and Canteen at Ramganga Power Station, Kalagarh.
265. CH (Maint.)-05/2024-25 19-06-2024 10-07-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Procurement of Spares for 60 MW Francis Turbine of Chibro Power Station
266. 02/2024-25/EE(C)/Pashulok Barrage 20-06-2024 10-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual Sweeping & Cleaning Work of Barrage and New Hydel Colony at Pashulok-Rishikesh.
267. 01/2024-25/EE(C)/Pashulok Barrage 20-06-2024 10-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of New Hydel Colony at Pashulok, Rishikesh
268. 04/EE(G)/2024-25 20-06-2024 10-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Printing and supply of log books and stationary items.
269. 03/EE(G)/2024-25 20-06-2024 10-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Cleaning & Sweeping of Chilla Power House
270. 01/EE(Civil-II)/Guptkashi/2024-25 17-06-2024 09-07-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Work of Operation and Monitoring of all Civil structures at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
271. 02/EE(G)/Chilla/2024-25 19-06-2024 09-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Hiring of diesel vehicle with driver for a period of one year
272. 02/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2024-25 18-06-2024 09-07-2024 Dakpathar Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Hiring of one number diesel vehicle (Mahindra Bolero/TUV 300 or equivalent) with driver for office of Executive Engineer(E&M) office, Arakot-Tiuni and Tiuni-Plasu, Projects, Dakpathar, Dehradun for one yea
273. 01/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2024-25 18-06-2024 09-07-2024 Dakpathar Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Hiring of 1 no. Diesel Vehicle Bolero/TUV 300 or Equivalent Model with Driver for DGM (E/M), Arakot Tiuni & Tiuni Plasu Dakpathar for one year
274. 01/EE(Civil)/SHP/Maneri/2024-25 14-06-2024 09-07-2024 Uttarkashi Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi Executive Engineer Annual repair & maintenance work of Pilangad (2x1125 KW) SHP in Bhatwari, Distt-Uttarkashi
275. 03/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Exterior repainting & repair of old P-III & P-II colony buildings at joshiyara Uttarkashi
276. 02/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual sweeping, cleaning, repair & Maintenance of septic tank, soak pit, sewer lines and drains in joshiyara colony Uttarkashi.
277. 1/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual operation & maintenance of water supply distribution system at joshiyara colony uttarkashi.
278. 01/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 14-06-2024 08-07-2024 Pauri Garhwal Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Repair & laying anti skid chequered tiles on approach road in Type-IV residences at hydel colony Kalagarh.
279. 02/EE/PCM-DKP/TN/2024-25 14-06-2024 08-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Renovation of Road from VSKC Government Degree College toPower Channel suspension bridge near Lower Lakhwar Colony at Dakpathar
280. 04/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 08-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer M&R works of residential Buildings of Lohiahead Colony for the year 2024-25
281. 03/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 08-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer M&R works of Non residential Buildings of Lohiahead Colony and other miscellaneous civil works at Sharda Power House Complex for the year 2024-25
282. PDD-02/2024-25 15-06-2024 06-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer AMC of 33 kV & 11kV Lines & other miscellaneous works
283. 01/EE(Solar)/2024-25 30-05-2024 06-07-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVNLtd, Dehradun EE (Solar) Preparation of pre-feasibility cum Detail Project Report (DPR) of Standalone Battery Energy Storage System (BESS) at various UJVNL substations near Hydro Plant
284. 01/EE(Gen.)/Khodri/2024-25 15-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Dismantling, Fabrication, Insulation and fixing of Rotor Bus Bar(D.C.) of unti No.1,2,3 &4 of 31 MVA Generator at Khodri Power Station
285. 02/EE(Gen.)/Khodri/2024-25 15-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fabrication of Iron Ramps & Iron trench covers of various sizes at Khodri Power Station, Khodri.
286. 01/EE/PCM-DKP/TN/2024-25 13-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special Repair works of St. Mary Convent School at Dakpathar, Dehradun.
287. 02/EE(Pathri)/2024-25 13-06-2024 05-07-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for General Operation of Pump House System & other miscellaneous electrical section works in Pathri Power House.
288. 01/EE(Pathri)/2024-25 13-06-2024 05-07-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for Sweeping, Cleaning & Up-keeping of Pathri Power House.
289. 02/EE(E&M)/PB/2024-25 11-06-2024 05-07-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Hiring of diesel vehicle non-AC(Mahindra & Mahindra Bolero or equivalent) without driver for emergency conditions at VirbhadraBarrage, Pashulok Rishikesh .
290. T-04/EEM/2024-25 15-06-2024 04-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer AMC of repairing works of 150 HP VT Pump at Power House
291. 03/EEM/2024-25 15-06-2024 04-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Annual General Cleaning of different places, Officers Club, Guest House, Substations, Central Store and Tube well premises etc. at Chilla Power House, Chilla
292. 02/2024-25/EE/PCM(GV)/Mayapur 12-06-2024 03-07-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for Executive Engineer, PCM(GV), Mayapur-Haridwar for the Year 2024-25.
293. 01/2024-25/EE/PCM(GV)/Mayapur 12-06-2024 03-07-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for DGM(CM-GV), Mayapur-Haridwar for the Year 2024-25.
294. 01/EEM&G)DKN/2024-25 11-06-2024 03-07-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual General cleaning of Power House area, HGC offices, other offices, switchyard area & other associated areas
295. 02/EE(Civil-II)/Guptkashi/2024-25 17-06-2024 02-07-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Repair & Maintenance of Type-I building at Weir site of Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
296. 01/UJVNL/EE (M&G)/KPS/2024-25 11-06-2024 02-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Repairing and Overhauling of Stop Log Gatewith gantry crane at Kulhal Power House
297. 04/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one no.(35 Seater) School Bus Model 2021 or later for academic session 2024-25 for one year on contract basis for transportation of school going children of Vyasi Project effected, Vyasi Project, Hathiyari.
298. 03/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for Emergency work of vyasi HEP for One Year
299. 02/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for one year period for Executive Engineer (Generation)
300. 01/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for the office of Dy.GM (O&M), Vyasi Project, Dakpathar for one year period .
301. 01/EE(Test)/GV/2024-25 30-05-2024 02-07-2024 Haridwar Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar Executive Engineer Hiring of diesel vehicle with driver for 1 year
302. 28e/EE(G)/CPH/2023-24 15-03-2024 02-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply, Installation, Testing and Commissioning of Generator Transformer (75 MVA, 11/220 KV, 3-ø, 50Hz) with all accessories, including dismantling of the existing transformer at 4x60 MW Chibro Power House
303. 01/EE(IC&CM)/2024-25 15-06-2024 01-07-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Supply of New Transformer Oil (Naphthenic & Paraffinic base) for different power houses/sites of UJVN Ltd.
304. 01/EE/PCM/Dhalipur/ 2024-25 10-06-2024 01-07-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damage road on right side of power channel from Court Bridge to Skew bridge Dhalipur, Dehradun
305. 01/EE (R&R)/LMP/2024-25 10-06-2024 01-07-2024 Dakpathar Office of The Executive Engineer (R&R), Lakhwar Multipurpose Project, Dakpathar Executive Engineer Hiring of one number Ambulance (Maruti Eeco/M&M Bolero/Tata Winger /Force Trax/equivalent model or higher model) along with driver for Lakhwar Project for the period of one year
306. 01/EE(G)/Klg/2024-25 08-06-2024 01-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh(Pauri-Garhwal) Executive Engineer Repairing of Ventilation system, Inlet and outletfans.
307. 03/EE(M)/RPSK/2024-25 08-06-2024 29-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual maintenance contract for repairing & overhauling of LOPs and EOCs of unit no. 1, 2 & 3
308. 02/EE(E&M)/Vyasi Dam/2024-25 07-06-2024 28-06-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Shifting of TRCM trash from Damsite to the Dump yard site at Juddo, Dakpathar, District Dehradun
309. 01/EE(Maint.)/Khodri/2024-25 07-06-2024 28-06-2024 Dakpathar Dakpathar Executive Engineer Cleaning & up-keeping of duplex strainer buckets system and other miscellaneous works during monsoon season at Khodri Power Station
310. 02/EE(M)/RPSK/2024-25 07-06-2024 27-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual Maintenance of Unit-03.
311. 01/EE(M)/RPSK/2024-25 07-06-2024 27-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual cleaning and gardening of various offices and central store premises
312. PDD-01/2024-25 06-06-2024 27-06-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Repairing of 630 KVA (11/0.4 KV) Distribution Transformer
313. 01/EE(G)/CPH/2024-25 05-06-2024 27-06-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Manufacturing & fixing of various Sign Boards and Safety Posters at Chibro Power House
314. 02e/EE(G)/CPH/2024-25 05-06-2024 27-06-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual Contract for miscellaneous work of lighting system, operation and maintenance at Chibro Power House
315. 01/EE(E&M-I)/LP/2024-25 06-06-2024 26-06-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Electrical wiring works in B-Type & C-Type Residential Buildings for Lakhwar Project
316. CH (Maint.)- 04/2024-25 03-06-2024 24-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Cleaning & Flushing of main cooling water Strainer during Monsoon period at Chibro Power Station
317. CH (Maint.)- 03/2024-25 03-06-2024 24-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Operation and routine servicing of 50t outlet structure crane during monsoon period at Chibro Power Station
318. 01/EE(E&M)/PB/2024-25 07-06-2024 22-06-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Electrical Maintenance of colonies and Virbhadra Barrage at Pashulok, Rishikesh
319. 01/2024-25/EE(C-M) 08-06-2024 21-06-2024 Vyasi Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer “Carrying out the Bathymetric Survey of Vyasi Reservoir before the onset of monsoon & after the monsoon
320. 02/SPH2024-25 30-05-2024 21-06-2024 Khatima Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual maintenance of bore wells, pipe Lines, cooling water pumps & cleaning of underground cooling water tank along with cleaning of grass, bushes, rubbish etc near intake area at Sharda Power House Lohiahead
321. 02/UJVNL/EE(M&G)/KPS/2024-25 12-06-2024 19-06-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Operation and Maintenance of cross regulating gates at downstream of Kulhal PH
322. 02/EE(H.Q.)/2024-25 27-05-2024 18-06-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Extension and Renovation of work of Training Hall at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun
323. 01/EE(Civil)/HT/2023-24 15-03-2024 18-06-2024 Dehradun Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Hanol-Tiuni Hydro Electric Project on River Tons in District Uttarkashi/Dehradun of Uttarakhand
324. 20/2023-24/EE(C-M)Vyasi Project 09-02-2024 18-06-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Levelling of land & Demarcation of plots at Village Dhaira Khadar,Kalsi Distt. Dehradun for Rehabilitation of Vyasi HEP affected village Lohari
325. 01/EE(HQ)/2024-25 18-05-2024 16-06-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Hiring of vehicles along with driver for corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun.
326. 01/SPH/2024-25 20-05-2024 13-06-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Refilling of old fire extinguishers and supply of other accessories at Sharda Power House, Lohiahead
327. 01/EE(E&M)/Vyasi Dam/2024-25 22-05-2024 11-06-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Hiring of 250 KVA DG Set at Vyasi Dam Site Juddo, Dehradun
328. 11/EE(Civil-II)/LMP/2023-24 12-03-2024 05-06-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. Executive Engineer Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2024-25)
329. 02/2024-25 14-05-2024 04-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Strengthening of Surge Tank Gate Guides at Chibro Power Station.
330. 01/2024-25 14-05-2024 04-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Make shift arrangement for lowering 2nd surge tank gate &associated work at Chibro Power Station.
331. 32/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Safe closure of adits,tunnels,surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi.
332. 31/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi.
333. 30/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi.
334. T-02/EEM/2024-25 21-05-2024 28-05-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply, Fabrication & Replacement of Gland Seal and other pipe line at Chilla Power House
335. 73/EE(M)/MB-II/23-24 13-03-2024 22-05-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Turbine Shaft Rubber Seal for 76MW Turbine at Dharasu Power House MB-II, Chinyalisaur
336. 72/EE(M)/MB-II/23-24 13-03-2024 22-05-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of consumable items at Dharasu Power House, MB-II Chinyalisaur
337. 01/EE(G)/Chilla/2024-25 14-05-2024 21-05-2024 Chilla Office of the Executive Engineer (G), Chilla Executive Engineer Annual Maintenance of electrical works of Unit 04 at Chilla Power House.
338. 01/EEM/2024-25 14-05-2024 21-05-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Enginee Supply and Application of Coating Material on different Underwater parts in Unit No-4 of Power House
339. e-T.No.10/EE(Test)/DKN/2023-24 05-03-2024 20-05-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels at Kulhal Powerhouse
340. 07/EE(Civil)/KB/2023-24 05-03-2024 15-05-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services for preparation of EPC tender documents and tender stage drawing for Katapathar Barrage on river Yamuna at Katapathar, Dist. Dehradun in Uttarakhand.
341. 16/EE(E&M-I)/LP/2023-24 26-03-2024 11-05-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Supply of Stationery items for the offices of E&M wing Lakhwar Multi Purpose Project, Dakpathar, Dehradun
342. 21/EE(C-M)/DDN/2023-24 21-02-2024 09-05-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive annual maintenance contract (CAMC) of 03 Nos. Kone Make lifts installed at the New Corporate Office Building G.M.S. Road, Ujjwal Dehradun
343. 32/EE/PCM-DKP/TN/2023-24 27-02-2024 03-05-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of spillway & roller bucket of bay no 3, 4 & 5, CC Blocks beyond the roller buckets of all spillway and pitching/retaining wall of approach road of Ichari dam
344. 21/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 11.00 to 15.20) at left bank of river Yamuna of Lakhwar MPP
345. 20/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 6.2 to Km 9.00 upto Doligad) at left bank of river Yamuna of Lakhwar MPP
346. 01/EE(Quality)/LMP/2023-24 18-03-2024 23-04-2024 Dehradun Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun Executive Engineer Construction of 04 nos. B-Type residences for Lakhwar Project at Dakpathar, Dehradun
347. e-04/UJVNL/IT/EE(EM-II)/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Supply, installation, testing & commissioning of Advance Training System in Training Hall, UJVN Limited, “Ujjwal”, GMS Road, Dehradun
348. 18/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Transit camp at Lakhwar SubStation Kandriyan
349. 17/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair and maintenance of Sub-Station Building and protection of switchyard at Kandriyan.
350. 27/EE-II (E&M)/LP/2023-24 22-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II Detailed Engineering & Designing, Procurement, Manufacturing, inspection, Transportation, site erection, installation, testing & commissioning of Early Warning System and Surveillance System of Lakhwar MPP
351. 26/2023-24/EE(C-M)Vyasi 14-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun
352. 38/EE/PCM/Dhalipur/ 2023-24 26-02-2024 22-04-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Protection work of Tail Race Channel (Asan River side) of Dhalipur Power House at Dhalipur, Dehradun
353. 48/EE(Pathri)/2023-24 20-03-2024 20-04-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Design, Manufacturing, Supply, Erection, Testing & Commissioning of one no. Hydraulically Operated Trash Rack Cleaning Machine at Pathri Power House
354. 14/EE (Civil)/Lohiahead/Khatima/2023-24 02-03-2024 20-04-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Construction of Type- IV residences in residential complex at Sharda Power House, Lohiahead Khatima Udham Singh Nagar
355. 37/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Zinc coating of Draft tube gates, TRC gates, TRC outfall gates, Surge shaft gates and coating of outer periphery of MIV Inlet Outlet pipe surface at Vyasi HEP, Hathiyari.
356. 36/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Executive Engineer Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Supply and application of coating material on Spiral casing inner surface, Stay Vane & Stay ring surface and inlet pipe inner surface of one unit of Vyasi power house, Hathiyari
357. 36/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Power house site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
358. 35/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Surge shaft site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
359. 34/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Dabrani and Gunga Adit site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi..
360. 33/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Barrage site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
361. 03/EE(Civil-IV)/LMP/2023-24 25-03-2024 18-04-2024 Dakpathar Office of the Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/Reconstruction of motor road from Dam top to Mussorrie bend (Km 9.0 to Km 11.0) at left bank of river Yamuna of Lakhwar MPP
362. T-08/EE(Solar)//2023-24 18-03-2024 17-04-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun Executive Engineer Supply, Installation, Testing & Commissioning work of 100 KW(AC) Grid connected Roof Top Solar Power Plant on new office and two Solar Tree at “Ujjwal”, Maharani Bagh GMS Road, Dehradun
363. PDD-19/2023-24 16-03-2024 15-04-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply and fixing of 33 KV LA, earthing of CT/PT and concreting of four pole structure of 33 KV Dhakrani-Chibro feeder at Mazri.
364. 02/EE(Quality)/LMP/2023-24 19-03-2024 13-04-2024 Dehradun Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun Executive Engineer Construction of 04 nos. C-Type residences for Lakhwar Project at Dakpathar, Dehradun
365. 26/EE-II (E&M)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun.
366. 28/EE-II (E&M-LWR)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Repairing, Maintenance & fencing work of 33/11 kV Substation Hathiyari, under Lakhwar MPP.
367. 26/EE-II (E&M)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun.
368. 16/EE(Civil-I)/LMP/2023-24 11-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), Executive Engineer Supply and Installation of Portable Office cabin/container of size 20’ x 10’ x 8.5’ (Lift & Shift type) at Lakhwar Multi-Purpose project in District Dehradun/Tehri Garhwal.
369. CH(Maint.)- 40/2023-24 20-03-2024 10-04-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Overhauling of TGB assembly (Including one set supply of T.G.B pads) of 60 MW Chibro Turbine
370. 25 /EE(C&M)/MB-II/Joshiyara/2023-24 13-03-2024 10-04-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Reconstruction of Damaged Road from Police Line Gyansu to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi.
371. 29/EE(G)/CPH/2023-24 16-03-2024 08-04-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual contract for cleaning, & up keeping of switchyard and Chibro Power House complex
372. 11/EE(E&M)/AB/2023-24 14-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer AMC of barrage control & monitoring systems
373. NCB/10/EE (E&M)/Asan Barrage/ 2023-24 07-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Repair & Overhauling of hoisting arrangement of Barrage gates (1 to 14) of Asan Barrage
374. NCB/09/EE (E&M)/Asan Barrage/ 2023-24 07-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Repairing and Major Overhauling of Head Regulator (HR) gates (1 to 5) at Asan Barrage
375. 26/EE(Gen)/Khodri/2023-24 15-03-2024 06-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun), Executive Engineer Supply, Erection, Testing and Commissioning of Collector Assy. 1219 mm diameter (48” slip Ring Assembly) of 31 MVA of Generator of unit no. 3 at Khodri Power Station
376. 25/EE(Gen)/Khodri/2023-24 15-03-2024 06-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Procurement of Electrical Consumable items at Khodri Power Station
377. 28/2023-24/EE(C-M)Vyasi Project 15-03-2024 06-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
378. 27/2023-24/EE(C-M)Vyasi Project 15-03-2024 06-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Landscaping & protection work on the right bank of river Yamuna at Vyasi HEP dam site at Juddo, Distt. Dehradun
379. 25/2023-24/EE(C-M)Vyasi 14-03-2024 05-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Repair and maintenance of Vyasi Dam & Allied structures of Vyasi Project at Juddo (Dehradun)
380. 24/2023-24/EE(C-M)Vyasi 14-03-2024 05-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Maintenance and Repair of Power House and allied structures of Vyasi HEP (2X60MW) at Hathiyari, Dehradun
381. 31/2023-24/EE(C)/Pashulok Barrage 15-03-2024 04-04-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Construction of Approach Road at Divine College of Nursing & Paramedical Sciences, Shyampur Kangri, Haridwar under CSR
382. 16/EE(Test)/DKP/2023-24 15-03-2024 04-04-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Miscellaneous works and supply of items.
383. 17/EE(E&M)/Vyasi Dam/2023-24 27-02-2024 04-04-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd Executive Engineer Supply of T&P Items at Vyasi Dam, Juddo, Dehradun
384. 28/UJVNL/EE(M&G)/KPS/2023-24 13-03-2024 03-04-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulha Executive Engineer Installation of one No. new Bore well with all necessary supply at Intake of Kulhal Power station
385. 35/EE(M&G)/MPH/2023-24 14-03-2024 03-04-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Hiring of One non AC Vehicle for School going Children and Power house work at Mohammadpur Power House for one year.
386. 24/EE(Gen)/Khodri/2023-24 12-03-2024 03-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fabrication of Iron Ramps & Iron trench covers of various sizes at Khodri Power Station, Khodri..
387. 19/EE(G)/2023-24 13-03-2024 02-04-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Flushing of Strainers and Flushing of Filtration Plant of Chilla Power House
388. 18/EE(G)/2023-24 13-03-2024 02-04-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Supply and Fixing of Gear based easy movable mechanism system of store gate of electrical section store at Chilla Power House
389. 15/EE(Civil-I)/LMP/2023-24 11-03-2024 02-04-2024 Dakpathar Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), Executive Engineer Repair and maintenance of Sub-Station Building and premises at Hathiyari.
390. 40/EE/PCM/Dhalipur/ 2023-24 12-03-2024 02-04-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of old M&U office Building Dhalipurat Dhalipur Dehradun
391. 50/EEM&G)DKN/2023-24 07-03-2024 02-04-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of Metering & protection of 132 Bus
392. 23/2023-24/EE(C-M)Vyasi Project, 11-03-2024 02-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of Office Building for Executive Engineer (E&M), Vyasi Dam at Juddo, Dehradun
393. 35/EE(M)/VP/2023-24 05-03-2024 01-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Fabrication and fixing of shed over HVAC pump motor set and over HVAC duct cut out on the roof of Vyasi HEP at Hathiyari
394. 34/EE(M)/VP/2023-24 05-03-2024 01-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Annual maintenance of Fire Hydrant System of Vyasi HEP at Hathiyari
395. 16/EE(E&M)/Vyasi Dam/2023-24 19-02-2024 01-04-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd. Executive Engineer SITC of High Mast lighting and Street Lighting system at Vyasi Dam, Juddo Dehradun
396. 41/EE (GEN)/MB-II/2023-24 08-03-2024 30-03-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer SITC of 15 Nos. Capacitive Voltage Transformer including interfacing with existing control, protection and metering scheme and dismantling of existing Capacitive Voltage Transformer installed at 220 kV switchyard of Dharasu Power House
397. 07/EE(Gen)/Klg/2023-24 08-03-2024 28-03-2024 Pauri Garhwal Office of Executive Engineer (Generation) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Procurement of Consumables.
398. 19/EE(E&M)/Vyasi Dam/2023-24 06-03-2024 28-03-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Work of electrification at new office building of EE(E&M) Near View Point at Vyasi Dam, Juddo Dehradun
399. 18/EE(E&M)/Vyasi Dam/2023-24 06-03-2024 28-03-2024 Dakpathar Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar Executive Engineer SITC of CCTV Camera system at Vyasi Dam, Juddo, Dakpathar, Dehradun
400. T-47/EEM/2023-24 15-03-2024 27-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repair and Painting work of Trash Rack at Chilla Power House
401. 15/EE(Test)/DKP/2023-24 04-03-2024 27-03-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Calibration and certification of Various Testing Instruments & Equipment’s of Chibro and Khodri Power House and Ichari Dam.
402. PDD-18/2023-24 05-03-2024 26-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Dismantling of damaged local communication telephone line at Dakpathar colony.
403. 17/EE(Generation)/Vyasi/2023-24 04-03-2024 26-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Supply and fixing of Sign boards, display board and other works at Vyasi HEP
404. CH(Maint.)- 39/2023-24 05-03-2024 26-03-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Supply, Installation, Testing and Commissioning of 10Ton Electric Wire Rope Hoist (Crane) remote operated with Cross Travel at Central Store, Chibro Power Station, Dakpathar.
405. 04/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 04-03-2024 26-03-2024 Tiuni Plasu Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Supply, Installation, Testing & Commissioning of 125 KVA, 415V (CPCB-IV Plus approved) Silent Diesel Generator (DG) set at the Project Office of ArakotTiuni & Tiuni-Plasu Projects, Dakpathar
406. T-46/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Rewinding and overhauling of 01 No.55HP Motor of pump house at chilla project colony .
407. T-45/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Rotating Shaft Sleeve for Units of Chilla Power House
408. T-44/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of Miscellaneous Consumable Items for Units of Chilla Power House
409. 02/EE(E&M - ISO)/2023-24/ISMS 28-02-2024 21-03-2024 Dehradun Office of the Executive Engineer (E&M-ISO), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer CONSULTANCY SERVICES FOR IMPLEMENTATION OF ISO 27001:2022 (ISMS) AT SITES HAVING IT/OT UNDER PHASE-II, III, V OF UJVN LTD
410. 13/EE(IC&CM)/2023-24 28-02-2024 20-03-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE(IC&CM) Valuation of scrap material lying at Chilla, Dhakrani, Vyasi, Yamuna Colony/Ujjwal Bhawan sites & stores, and Nissen hut at Harrawala of UJVN Ltd
411. 23/EE(CM)/DDN/2023-24 28-02-2024 20-03-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Plantation of Plants,Seasonal Flowers and Routine Maintenance of Garden in New Corporate Office Building UJVN Ltd.,UJJWAL, Maharani Bagh GMS Road,Dehradun .
412. 14/EE (Civil-I)/LMP/2023-24 24-02-2024 20-03-2024 Dakpathar Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Repair and maintenance of residences of Lakhwar Project at Dakpather (Dehradun)
413. 19/EE(Civil-III)/LMP/2023-24 28-02-2024 19-03-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Pre-fabricated site office/ Meeting hall at Power house site of LMPP Distt. Dehradun .
414. 34/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Providing & Fixing the Bird guard at Various locations at power House.
415. 33/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Fabrication & eraction of sliding SS mesh wire gate with one no. openable mesh door & sliding SS mesh wire gate at Power House.
416. 32/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Hiring of Services of Divers at Power House.
417. 31/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Fabrication & Fixing of MS Rack for Central Store at Power House
418. 30/2023-24/EE(C)/Pashulok Barrage 02-03-2024 16-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Work related to Fire Protection System with Fire Safety Equipments at Office of EE(Civil), Pashulok Barrage, Rishikesh.
419. 29/2023-24/EE(C)/Pashulok Barrage 02-03-2024 16-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Strengthening of Surveillance & Monitoring System for Security Supervision at Virbhadra Barrage, Rishikesh.
420. CH(Maint.)-38/2023-24 22-02-2024 16-03-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer AMC of various O&M works at different sites of Chibro Power Station and Ichari Dam under DGM (HGC) Dakpathar
421. 12/EE(Test)/DKP/2023-24 22-02-2024 16-03-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Procurement of Stationaries and office Items
422. 49/EEM&G)DKN/2023-24 22-02-2024 15-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Procurement & installation of Surge Arrester
423. 48/EEM&G)DKN/2023-24 22-02-2024 15-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of indoor sports facility complex
424. 27/EE(G)/CPH/2023-24 07-02-2024 15-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Comprehensive Annual Maintenance Contract of Ventilation system at Chibro Power House
425. 03/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 29-02-2024 14-03-2024 Arakot Tiuni & Tiuni Plasu Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Annual Operations & Maintenance Contract for Electrical Installations and other miscellaneous works at the project office of Arakot-Tiuni & Tiuni-Plasu, Dakpathar, Dehradun
426. 22/2023-24/EE/PCM(GV)/Mayapur 22-02-2024 14-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R work of Cement Concrete Road of Filtration Plant at Chilla Power House.
427. 45/EE(Pathri)/2023-24 22-02-2024 14-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Procurement of different types of safety items for Pathri Power House
428. 33/EE(M)/VP/2023-24 21-02-2024 14-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Annual maintenance contract of Cooling Water System of Vyasi HEP atHathiyari,Dehradun
429. 32/EE(M)/VP/2023-24 21-02-2024 14-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Annual Maintenance contract for EOT Crane Capacity 100/25 Ton, Vyasi HEP at Hathiyar
430. 20/EE/M&G/DLR/2023-24 28-02-2024 13-03-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer SITC of HOV to MOV Actuator at Penstock filling valve of Unit A, B & C at Dhalipur Power Station .
431. PDD-17/2023-24 22-02-2024 13-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Distt-Dehradun) Executive Engineer Supply & Fixing of 70 sq.mm. LT A2XY single core Aluminium cable .
432. 37/EE/PCM/Dhalipur/ 2023-24 21-02-2024 13-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Repair and Painting works P-I Type Quarters of Kulhal Power House Colony, Kulhal Dehradun
433. 36/EE/PCM/Dhalipur/ 2023-24 21-02-2024 13-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Annual M&R works of Office Building at Dhalipur for the year 2024-25, Dehradun
434. 28/2023-24/EE(C)/Pashulok Barrage 27-02-2024 12-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Repair & Strengthening of Damaged Protection Wrok in D/S of Veerbhadra Barrage Rishikesh
435. 27/2023-24/EE(C)/Pashulok Barrage 27-02-2024 12-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Repair & Realignment of Inlet & Outlet of Cross Drainages at Chilla Power Channel.
436. 22/EE(CM)/DDN/2023-24 26-02-2024 12-03-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive Annual Maintenance of VRF-Type HVAC air conditioner system installed at the New Corporate Building UJVN Ltd., Ujjwal Maharani Bagh, GMS road Dehradun
437. 22/2023-24/EE(C-M)Vyasi Project 27-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual cleaning, sweeping and other associated works in outer area of Power House building, HRT and Surge Shaft of Vyasi HEP at Hathiyari, Dehradun
438. 21/2023-24/EE(C-M)Vyasi Project 27-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Upkeeping and other works related to offices of Civil-Maintenance, Vyasi Project, Dakpathar, Dehradun
439. 24/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Restoration work of Upstream Damaged Panels of Afflux Bundh at Virbhadra Barrage
440. 23/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Repair and Strengthening of Boulder Excluder Tunnel of Under Sluice Gate No. 01 at Virbhadra Barrage, Pashulok, Rishikesh.
441. 22/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Refurbishment of Damaged Chilla Power Channel at Different Places from Barrage Head Regulator Gate to Intake of Chilla Power House.
442. CH (MAINT.) – 37/2023-24 20-02-2024 12-03-2024 Chibro Chibro Executive Engineer Hiring of Non AC vehicle (Mahindra Bolero/TUV 300/Eq.) round the clock with driver for maintenance duty at Chibro Power Station
443. 31/EE(M)/VP/2023-24 21-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Fabrication of MS racks, repairing of shed, rewiring, Painting and cleaning work at central store of Vyasi Power House, Hathiyari.
444. 18/EE(Civil-I)/KG-II/2023-24 16-02-2024 12-03-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Development and allied work at Project Kaliganga-II SHP (2x2.25 MW) in Tehsil Ukhimath, Distt- Rudraprayag
445. 27/UJVNL/EE(M&G)/KPS/2023-24 01-03-2024 11-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Trash Rack, Intake Area Cleaning & other associated work at Kulhal Power House for one year
446. 26/UJVNL/EE(M&G)/KPS/2023-24 01-03-2024 11-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer General cleaning work at Kulhal Power House for one year
447. 26/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 25-02-2024 11-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Digital Topographical Survey work of Allotted Forest Land for Virbhadra Barrage and Associated Chilla HEP Power Channel and Other Relevant Structures at Pashulok, Rishikesh
448. 24/2023-24/EE/PCM(GV)/Mayapur 24-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for Executive Engineer, PCM(GV), Mayapur-Haridwar for the Year 2024-25.
449. 23/2023-24/EE/PCM(GV)/Mayapur 24-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for DGM(CM-GV), Mayapur-Haridwar for the Year 2024-25
450. 09/EE(Civil-II)/LMP/2023-24 26-02-2024 11-03-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, LakhwarBhawan, Dakpathar, Dehradun Executive Engineer Supply, Installation and Monitoring of Instruments in underground Power house Cavern of Lakhwar Multipurpose Project (300 MW) in Dist. Dehradun, Uttarakhand
451. 17/EE(E&M)/(SHP)/RISHIKESH/2023-24 23-02-2024 11-03-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Hiring of one no. of non AC light diesel vehicle (M&M Bolero or equivalent) with driver for one year on rent basis for Executive Engineer (E&M)(SHP) UJVN Limited, Rishikesh
452. 06//EE(Civil)/Tiuni Plasu/2023-24 20-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd, Dakpathar (Dehradun) Executive Engineer Hiring of one number light diesel driven vehicle (Mahindra Make Bolero or Equivalent) along with driver for EE (Civil) Tiuni-Plasu, Dakpathar, Dehradun for period of one year
453. 35/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Cleaning works of Syphons across Power Channel Stage IV during Monsoon from Asan Barrage to Kulhal, Dehradun
454. 34/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer M&R of Power Channel from Silt Ejector Dakpathar to Dhakrani Village Bridge, Dehradun.
455. 33/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Annual M&R works of Power House Colony at Dhalipur, Dehradun
456. 32/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Repair works of Diesel Power House at Kulhal Dehradun
457. 47/EEM&G)DKN/2023-24 16-02-2024 11-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of potable water system
458. 46/EEM&G)DKN/2023-24 16-02-2024 11-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of One No. Non-AC Diesel Vehicle alongwith driver for Executive Engineer (M&G), Dhakrani Power House on annual contract basis
459. 46/EE(Pathri)/2023-24 19-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Major Overhauling of Unit-3 with spares along with Replacement of Runner blades in Pathri Power House
460. 16/EE(Generation)/Vyasi/2023-24 15-02-2024 11-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Establishment of Test Lab at Vyasi HEP
461. 15/EE(Gen)/Vyasi/23-24 15-02-2024 11-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Annual General Cleaning of 2 x 60 MW Vyasi HEP at Hathiyari, Dehradun
462. 30/EE(M)/VP/2023-24 17-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Providing and fixing of SS Rack, Bench, trolley and Aluminium partition at Mechanical workshop at Vyasi HEP, Hathiyar
463. 29/EE(M)/VP/2023-24 17-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Portable Protection Railing for Drainage pit, Dewatering pit, runner removal gallery, MIV & spiral casing cut outs and Stair railing of access stairs of power house to river at downstram side of control room at Vyasi HEP, Hathiyari
464. 07/EE(E&M)/Maneri Dam/2023-24 10-02-2024 11-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer SITC of Slip ring induction motors for 32 ton Gantry Crane at Maneri Dam.Maneri,Uttarkashi
465. 47/EE(Pathri)/2023-24 24-02-2024 10-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Hiring of two no. 7 (6+1) seater diesel vehicle (along with driver’s services) for official use of Executive Engineer, Pathri & DGM, HGC, Pathri and one no. driver for running of departmental ambulance for a period of one year
466. 39/EE(M&G)/DKN/2023-24 03-02-2024 09-03-2024 Dehradun Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Supply and Fixing of Air conditioning system
467. 16/EE(Civil-I)/Galogi/2023-24 09-02-2024 08-03-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Repair and Maintenance work at Power house and Residential Building at Galogi SHP (3.5 MW) in district-Dehradun .
468. 25/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 22-02-2024 07-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Annual Civil Maintenance & Repair Works of Virbhadra Barrage at Pashulok Rishikesh.
469. T-43/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Rewinding and overhauling of 01 No.HP Motor of pump house at chilla project colony .
470. T-42/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing and up-gradation of computers and other IT equipment of mechanical maintenance section of chilla power house
471. T-41/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Line shifting work of 11 KV Tubewell Feeder at Mundal River site and Preventive Maintenance work of feeder at chilla Project Colony
472. 30/EE(M&G)/MPH/2023-24 18-02-2024 07-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Removal of debris from Trashpit,forebay and Trashrack of Mohammadpur Power House fro one year
473. 44/EE(Pathri)/2022-23 15-02-2024 07-03-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer AMC of CCTV Camera System installed at various places such as in & around side of Andritz Store, Pathri Power House & 500KWp Solar PV Plant, Pathri and Supply, Installation, Testing & Commissioning of 01 no. CCTV Camera system in Pathri Power House Colony.
474. 42/EEM&G)DKN/2023-24 09-02-2024 07-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Strengthening of Protection system of 33 KV system
475. 24/EE(C&M)/MB-II/Joshiyara/2023-24 29-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards for for Office of Executive Engineer(C&M) MB-II, Joshiyara for the period of one year
476. 23/EE(C&M)/MB-II/Joshiyara/2023-24 29-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards for Executive Engineer(C&M) MB-II, Joshiyara for the period of one year
477. 13/EE (Civil)/Lohiahead/Khatima/2023-24 21-02-2024 06-03-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Construction of CC road on right bank of Main Sharda Canal from intake to byepass at Lohiahead Khatima.
478. 12/EE (Civil)/Lohiahead/Khatima/2023-24 21-02-2024 06-03-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Repair, modification and extension of office of DGM (HGC), Lohiahead, Khatima.
479. 33/EE(Civil)/MB-II/Chinyalisaur/2023-24 20-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply of cartridge for printers/photocopier machine for the office of EE(Civil), MB-II, Chinyalisaur, Uttarkashi.
480. 15/EE(E&M)/Vyasi Dam/2023-24 14-02-2024 06-03-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar Executive Engineer Annual operation of Dam related control system & associated equipment of Vyasi Dam at juddo
481. 07/EE (GC)/2023-24 07-02-2024 06-03-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Capital Maintenance of Generator, Turbine, and OPU of Unit No. # 02 of Galogi SHP
482. PDD-16/2023-24 09-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply of spares & overhauling of 33 kV CB Panels at 33/11 kV S/S Khodri .
483. PDD-15/2023-24 09-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply & Fixing of 28W,1200mm,5-star rated BLDC ceiling fans .
484. 28/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Pool Vehicle, Vyasi Power House, Hathiyari.
485. 27/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Executive Engineer (Maint.), Hathiyari
486. 26/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Executive Engineer, Vyasi Dam, Juddo.
487. 25/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring One No. 11 seater van for one year on contract basis for transportation of staff of Vyasi Dam Juddo
488. 30/EE(Civil)/MB-II/Chinyalisaur/2023-24 09-02-2024 04-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Operation and Maintenance of Water Supply System of Power House Complex at Dharasu, Uttarkashi.
489. 14/EE(E&M-I)/LP/2023-24 27-01-2024 04-03-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Re-conductoring & strengthening of 33 KV Dhakrani Lakhwar Construction Power line no- 02.
490. 17/EE(Civil-I)/KG-I/2023-24 09-02-2024 03-03-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Supply and Installation of IOT based real time data system for monitoring of various water parameters at Project Kaliganga- I SHP (2x2) MW SHP in District Rudraprayag.
491. e- 25/UJVNL/EE (M&G)/KPS/2023-24 21-02-2024 02-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Laying and Stringing Of 33 kV Medium Voltage Covered Conductors (Mvcc) At Dhalipur
492. 18/EE(Civil-III)/LMP/2023-24 18-02-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Cleaning, Upkeeping, Gardening and Minor repair works of Lakhwar Bhawan-II at Dakpathar (Dehradun)
493. 32/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 15-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual operation and Maintenance of 15 KLD STP at Dharashu Power House Complex at Dharashu, Uttarkashi.
494. 71/EE (M)/MB-II/2023-24 10-02-2024 02-03-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Upper bush housings for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
495. 06/EE(E&M)/Maneri Dam/2023-24 10-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer work of removal of deposited sediments from one no. hopper at Maneri Dam, Maneri, Uttarkashi.
496. 08/EE(E&M)/Maneri Dam/2023-24 10-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer Enamel Painting on steel structure of Maneri Dam, Maneri, Uttarkashi.
497. 45/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of potable water system
498. 44/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of power supply system of 33 KV switchyard/ Substation & Central store
499. 43/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Maintenance Contract (AMC) for Electrical Maintenance works of Dhakrani colony
500. 02/EE (Civil)/AT/2023-24 10-02-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Civil), Arakot Tiuni Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Pool vehicle related to Arakot Tiuni & Hanol-Tiuni Projects works for period of one year
501. 24e/EE(G)/CPH/2023-24 03-02-2024 02-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Manufacturing & fixing of Guide bearing support ring including annual maintenance of 60 MW generator & associated equipment of unit 3 at Chibro Power House.
502. 14/EE(Test)/DKP/2023-24 31-01-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Procurement of spare and consumable items for Test Unit in Khodri Power House.
503. 22/EE(G)/CPH/2023-24 26-01-2024 02-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer “Supply of spare parts for generator maintenance at Chibro Power House
504. 18/GM(CDH&NP)/UJVNL/2023-24 23-01-2024 02-03-2024 Uttarkashi Uttarkashi ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
505. 31/EE/PCM-DKP/TN/2023-24 16-02-2024 01-03-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Ichari Dam & its associated structures.
506. 12/EE (G)/TPH/2023-24 15-02-2024 01-03-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual Contract for Cutting, digging and uprooting the big bushes & grass of 220 kV/33 kV switchyard and GTF deck area of Tiloth Power House, Uttarkashi.
507. 21/2023-24/EE/PCM(GV)/Mayapur 09-02-2024 01-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer White Washing & Painting of D-Type Residences at Pathri Colony .
508. 20/2023-24/EE/PCM(GV)/Mayapur 09-02-2024 01-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer White Washing & Painting of C & G-Type Residences at Pathri Colony
509. 05/EE(Civil)/Tiuni Plasu/2023-24 09-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Construction/Repair of reference pillars along with land alignment /boundaries & making footpath on Tiuni –Plasu HEP at Tiuni, District -Dehradun
510. 22/EE(E&M)/MB-II/Barrage/2023-24 09-02-2024 01-03-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Hiring of pumps with complete Operation and Maintenance to maintain water level at Joshiyara barrage tunnel
511. 43/EE(Pathri)/2023-24 09-02-2024 01-03-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for operation & maintenance of 500 KWp Solar PV Plant Pathri.
512. 24/EE(M)/VP/2023-24 10-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Supply of different types of nut & bolts and filter elements of GOV and MIV OPU System of Vyasi power house
513. 23/EE(M)/VP/2023-24 10-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring of one no. 27 Seater Bus for one year on contract basisfor transportation of staff of Vyasi Project, Hathiyari, Dehradun
514. 30/EE/PCM-DKP/TN/2023-24 15-02-2024 29-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of C-Type Residences of Tons Colony at Dakpathar, Dehradun
515. 31/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 15-02-2024 29-02-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hill slope protection work behind Dharasu Power House of Maneri Bhali Project Stage-II at Dharasu,(Uttarkashi).
516. 20/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 07-02-2024 29-02-2024 Pauri Garhwal Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Painting work of Non Residential Buildings and Boundary wall at Kalagarh.
517. 29/EE(M&G)/MPH/2023-24 07-02-2024 29-02-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar Executive Engineer Annual Routine Maintenance Contract of Power House
518. 13/EE(Test)/DKP/2023-24 31-01-2024 29-02-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Supply and fixing of electrical insulation mat around LV and HV panels in Khodri and Chibro Power Station
519. 27/SPH/2023-24 11-01-2024 29-02-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply, Installation, Testing & Commissioning of 62.5 KVA D.G. set with AMF panel in learning centre of Sharda Power House Lohiahead
520. 26e/EE(G)/CPH/2023-24 07-02-2024 28-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply of spare parts for electrical maintenance (S/Y & light) at Chibro Power House
521. 25/EE(G)/CPH/2023-24 07-02-2024 28-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Hiring of Non AC vehicle with round O clock driver for emergency duty of Chibro Power House
522. 11/EE (G)/TPH/2023-24 08-02-2024 28-02-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Application of Insulation Epoxy coating on floor area of different LT Boards (415V AC) and HT Boards (11kV) installed at Tiloth Power House, Uttarkashi
523. 23/EE(Maint.)/Khodri/2023-24 07-02-2024 28-02-2024 Dakpathar Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Modification & Overhauling work of 50 HP Emergency pump Pipe Line, PSE Protection coating and Repairing of Valve at 30 MW Khodri Power Station
524. 22/EE(Maint.)/Khodri/2023-24 07-02-2024 28-02-2024 Dakpathar Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply and installation of the thermal insulation (Elastomeric Foam based on rubber with Aluminum Cladding) on cooling water Pipe Line in MIV gallery and miscellaneous works of Khodri Power Station .
525. 19/2023-24/EE/PCM(GV)/Mayapur 07-02-2024 28-02-2024 Executive Engineer Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Restoration of Damaged Structures due to Disaster at Pathri Power House & Colony
526. 20/EE/(C-M)/ DDN/2023-24 07-02-2024 28-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Purchasing of T&P for day-to-day routine maintenance work at the new corporate building Ujjwal Dehradun
527. 19/EE(C-M)/DDN/2023-24 07-02-2024 28-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Supply of electrical spare parts (Stocks) for day-to-day routine maintenance work at the new corporate building Ujjwal Dehradun
528. 22/EE(C&M)/MB-II/ Joshiyara/2023-24 06-02-2024 27-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Restoration of Damaged Protection wall of Barrage Reservoir at left bank of Bhagirathi River, near Nigam Parking, Joshiyara Uttarkashi.
529. 22/EE(M)/VP/2023-24 07-02-2024 27-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Hiring of 1 No. 05 Seater light utility vehicle along with driver for one year period for Vyasi Dam Juddo
530. 21/EE(M)/VP/2023-24 07-02-2024 27-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer SITC of LED lights on Draft tube gate hoist, TRC gate hoist and surge shaft gate hoist and HRT Adit Gate of Vyasi HEP at Hathiyar
531. 41/EEM&G)DKN/2023-24 05-02-2024 27-02-2024 Dhakrani Power House Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of shutter and racks etc. and repair/overhauling of shutters of various stores
532. 40/EEM&G)DKN/2023-24 05-02-2024 27-02-2024 Dhakrani Power House Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer “Landscaping and misc. maintenance works in Officer Transit Camp & associated areas
533. NIT- 68/EE(M)/MB-II/23-24 06-02-2024 27-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Overhauling of Draft Tube Gantry Crane of Capacity 20 Ton at Dharasu Power House, MB-II Uttarkashi.
534. NIT-70/EE (M)/MB-II/2023-24 06-02-2024 27-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of SS Forged Liner Plates for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
535. CH(Maint.)- 36/2023-24 06-02-2024 27-02-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Application of Coating Material on Draft Tube Chamber, Draft Tube Window & Stay vanes of Unit No. 03 at Chibro Power Station
536. 21/EE(E&M)/MB-II/Barrage/2023-24 05-02-2024 27-02-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Supply of various submersible dewatering and slurry pumps and their starters at Joshiyara Barrage
537. 15/EE(C&M)/MB-II/Joshiyara/2023-24 27-01-2024 27-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Reconstruction of Damaged Road from Police Line Gyansu to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi.
538. 40/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of DOL Starter Panel for 3.0 H.P and 10.0 H.P Submersible Pumps for Units of Power House
539. 39/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of Cleaning and Gasket Sealant Products for Preventive and Breakdown maintenance of units of Chilla Power House
540. 38/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of different types of Electrical consumables for Residences of Project Colony
541. 36/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of various size Gate Valves of Units of Chilla Power House
542. 35/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of safety relief valve, NRV ,Vacuum breaking valve, Servo tube assembly ,Support plates and adjusting bolts /studs ,OCU ,OLU and GOP pumps of Chilla Power House
543. 34/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of 33 kV Chilla- Bhupatwala Feeder at Neeldhara in River Ganga
544. 33/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Runner Servo Tube Assembly for Units of Chilla Power House
545. 32/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Removal of silt from drainage/dewatering gallery nearby area at Power House
546. 21/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer Works related to Barrels and Cross Drainages of Chilla HEP Power Channel at Rishikesh.
547. 20/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer Internal Painting work of Type-B, Type-C & Type-D Residences of Maneri Bhali-II Colony Rishikesh.
548. 19/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer External Painting work of Type-A, Type-B, Type-C & Type-D Residences of Maneri Bhali-II Colony Rishikesh
549. 23/EE(Gen)/Khodri/2023-24 04-02-2024 26-02-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fire Protection coating on power cables and control cables of cable gallery
550. 22/EE(Gen)/Khodri/2023-24 04-02-2024 26-02-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Replacement & Modification of Hydrant line along with providing of hose fireboxes
551. 69/EE(M)/MB-II/23-24 05-02-2024 26-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Lower bush housings and Gun Metal Bushes for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
552. 67/EE(M)/MB-II/23-24 05-02-2024 26-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply of miscellaneous electrical items for colony maintenance in Shaktipuram Colony, Chinyalisaur
553. 23/EE(G)/CPH/2023-24 26-01-2024 26-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Testing of oil for 4*69 MVA Transformers at Chibro Power House
554. 19/2023-24/EE(C-M)Vyasi Project 20-01-2024 26-02-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
555. 18/2023-24/EE(C-M)Vyasi Project 20-01-2024 26-02-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Landscaping & protection work on the right bank of river Yamuna at Vyasi HEP dam site at Juddo, Distt. Dehradun
556. 19/EE(E&M)/MB-II/Barrage/2023-24 10-01-2024 26-02-2024 Uttarkashi The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Annual cleaning of trash rack through Diving Team at Joshiyara Barrage, Uttarkashi for the period of one year
557. 17/EE(Civil-III)/LMP/2023-24 10-02-2024 24-02-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Reclaiming of land by construction of Gravity wall and Cladding wall for Muck storage/Muck dumping , at right bank of river Yamuna near Plankhera of Lakhwar MPP.
558. 16/EE(E&M-SHP)/KG-II/2023-24 09-02-2024 24-02-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Annual cleaning, up keeping and gardening of the entire area of Kaliganga-II (2x2.25 MW) Power House building and other associated areas in Village Kaviltha, Guptkashi, DistrictRudraprayag.
559. 21/EE(Maint.)/Khodri/2023-24 03-02-2024 24-02-2024 Dehradun Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Procurement and repair of Bearing bodies at Khodri Power House
560. 66 /EE (M)/MB-II/2023-24 03-02-2024 24-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of PPV control panel and other works at Valve House of Dharasu Power House, MB-II, Uttarkashi
561. 65/EE(M)/MB-II/23-24 03-02-2024 24-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Fasteners for Turbines at Dharasu Power House, MB-II Uttarkashi .
562. CH(Maint.) - 35/2023-24 02-02-2024 24-02-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Replacement of damaged part of drainage & dewatering pipe line at Chibro Power Station.
563. CH(Maint.) - 34/2023-24 02-02-2024 24-02-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance Works of unit No 03 of Chibro Power Station.
564. 15/EE(Civil-I)/Dunao/2023-24 30-01-2024 24-02-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Annual Repair & Maintenance work of Civil structures at Ram Prasad Nautiyal, Dunao SHP (2x0.75 MW) in Distt- Pauri Garhwal
565. 29/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 01-02-2024 24-02-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Development of footpath for DT type residences near Birja Inter college at Shaktipuram Colony, MB-II Chinyalisaur.
566. 23/EE(E&M-II)/LP/2023-24 18-01-2024 24-02-2024 Dakpathar Office of the Executive Engineer (EM-II),Lakhwar MPP, Dakpathar, UJVN Ltd Executive Engineer Supply and applying epoxy based electrical insulation floor and coating on M.S structure at 33/11 kV Hathyari Substation.
567. 15/EE(E&M-SHP)/KG-I/2023-24 08-02-2024 23-02-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Annual cleaning, up keeping and gardening of the entire area of Kaliganga-I (2x2 MW) Power House building and other associated areas in Village Khunnu, Guptkashi, District-Rudraprayag
568. 18/EE(CM)/DDN/2023-24 02-02-2024 23-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive AnnualMaintenance of VRF-Type HVAC airconditioner system installed at the NewCorporate Building UJVN Ltd., UjjwalMaharani Bagh, GMS road Dehradun
569. 64/EE (M)/MB-II/2023-24 02-02-2024 23-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of vacuum breaking valve with sealing seat for turbine of Dharasu power House MB-II, Uttarkashi
570. 63/EE(M)/MB-II/2023-24 02-02-2024 23-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Overhauling of 5 Ton Motorized chain hoist at Dharasu Power House, MB-II
571. 62/EE(M)/MB-II/2023-24 02-02-2024 23-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and Extension of Drainage Pipe Line and Other Work At Dharasu Power House, MB-II
572. 61/EE(M)/MB-II/2023-24 02-02-2024 23-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Level marking in TRC and Drainage Pit at Dharasu Power House, MB-II, Uttarkashi
573. 10/EE (G)/TPH/2023-24 01-02-2024 22-02-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Refilling & Fixing of various Fire Extinguishers, Mock drill & other associated miscellaneous works at Tiloth Power House and Maneri Dam, Uttarkashi
574. 09 EE(Test)/GV/2023-24 01-02-2024 22-02-2024 Haridwar Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar Executive Engineer Work of Main and Backup Numerical Distance Protection Relays and Annunciator work for Feeders Emanating from Chilla Power House
575. 38/EEM&G)DKN/2023-24 31-01-2024 22-02-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Replacement of fences in switchyard of Dhakrani Power Station
576. 37/EEM&G)DKN/2023-24 31-01-2024 22-02-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Oil testing of various transformers of Dhakrani Power Station
577. 04/EE(P&C)/2023-24 31-01-2024 22-02-2024 Dehradun Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun Executive Engineer Procurement of different Stationery Items for various offices of UJVN Ltd. Located at Dehradun
578. 28/EE(M&G)/MPH/2023-24 07-02-2024 21-02-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar Executive Engineer Supply, testing & commissioning work of 10 H.P submersible pump along with suitable control panel & HDPE flexible pipe
579. 18/2023-24/EE/PCM(GV)/Mayapur 31-01-2024 21-02-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R Work of Chilla Power House at Chilla for the Year 2023-24
580. 17/2023-24/EE/PCM(GV)/Mayapur 31-01-2024 21-02-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Annual M&R Works of Type-III & IV Residences at Chilla Colony for the year 2023-24
581. 60/EE (M)/MB-II/2023-24 31-01-2024 21-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Strengthening of 11 KV Chinyalisaur Line -2 from DPH Dharasu to Shaktipuram Colony Chinyalisaur
582. 14/EE(E&M-SHP)/Madhyamaheshwar/2023-24 22-01-2024 21-02-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Supply, erection and commissioning of DG set with control panel including civil work at weir site of Madhyamaheshwar SHP, Tehsil Ukhimath, District Rudraprayag.
583. 14/Manager(A&S)/2023-24 27-01-2024 20-02-2024 Dehradun Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun Manager Annual Operation, maintenance, cleaning and upkeep of UJVN Ltd transit accommodation at “UJJWAL”, Dehradun
584. 06/EE(Civil)/KB/2023-24 24-01-2024 20-02-2024 Dehradun Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Geological Mapping work and other allied works of Katapathar Barrage, Dehradun
585. 09/EE(Test)/DKN/2021-22 25-01-2024 20-02-2024 Dhakrani Dhakrani Executive Engineer Supply of Stationary for Office of Deputy General Manager, Dhakrani
586. 26/SPH/2023-24 11-01-2024 20-02-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual operation, upkeeping & horticulture Maintenance at Learning center/Guest House of Sharda Power House Lohiahead
587. 17/EE(G)/2023-24 30-01-2024 19-02-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual maintenance contract of NEC SL-2100 (NEC make) EPABX system at Chilla Power House
588. 16/EE(G)/2023-24 30-01-2024 19-02-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual maintenance contract (AMC) for computers, printers at Chilla Power House
589. 15/EE(G)/2023-24 30-01-2024 19-02-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Refilling of Fire Extinguishers at Chilla Power House
590. 13/EE(E&M)/PB/2023-24 30-01-2024 19-02-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Procurement of electrical accessories for colonies and Virbhadra Barrage, Pashulok, Rishikesh .
591. 29/EE/PCM-DKP/TN/2023-24 29-01-2024 19-02-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Protection Works at Outfall Tail Race Tunnel of Chibro Power House
592. 30/EE/PCM/Dhalipur/ 2023-24 27-01-2024 19-02-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Maintenance & Repair works of Type-II residences of Dhakrani Power House Colony, Dhakrani, Dehradun
593. 29/EE/PCM/Dhalipur/ 2023-24 27-01-2024 19-02-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Repair and Painting works P-II Type Quarters of Kulhal Power House Colony, Kulhal Dehradun
594. 31/EE/PCM/Dhalipur/ 2023-24 27-01-2024 19-02-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Maintenance & Repair works of TypeIII& Type-IV residences of Dhakrani Colony, Dhakrani, Dehradun
595. 59/EE (M)/MB-II/2023-24 29-01-2024 19-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House
596. 17/EE(CM)/DDN/2023-24 29-01-2024 19-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Outer Painting & associated repair work of Type-II (P-II & SBC) residences of UJVN Limited at Yamuna Colony, Dehradun.
597. 16/EE(CM)/DDN/2023-24 29-01-2024 19-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Outer Painting & associated repair work of Type-II (CT Type) residences of UJVN Limited at Yamuna Colony, Dehradun.
598. 11/EE(Civil)/Lohiahead/Khatima/2023-24 25-01-2024 19-02-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Treatment of Leakage of Roofs in AP-Type, II- Type, C-Type and DPType residences & Exterior Painting of AP- Type Residences in Sharda Power House Colony, Lohiahead (Khatima).
599. 14/EE(E&M)/Vyasi Dam/2023-24 20-01-2024 19-02-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Supply & Application of Dielectric EpoxyCoating Around Electric Panels (LT/HT) & Moisture Tolerance Glass Flake epoxy protective coating work over the surface of Dewatering Pipeline at Vyasi Dam Juddo, Dehradun
600. 24/UJVNL/EE(M&G)/KPS/2023-24 07-02-2024 18-02-2024 Executive Engineer Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Refilling of fire extinguisher & other miscellaneous fire equipment related works at Kulhal power Station
601. 23/UJVNL/EE(M&G)/KPS/2023-24 07-02-2024 18-02-2024 Executive Engineer Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Protective coating on stay vanes and stay ring area of Unit A at Kulhal Power Station
602. 20/EE(M)/VP/2023-24 29-01-2024 18-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer SITC of Drainage water and cooling water pipe line extension at Vyasi power house, Hathiyar
603. 19/EE(M)/VP/2023-24 29-01-2024 18-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer SITC and Refilling of different type of fire extinguisher at Vyasi Power House, Hathiyar
604. 08/EE(E&M)/AB/2023-24 03-02-2024 17-02-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Repairing and annual maintenance contract (AMC) of CCTV & EPABX system at Asan Barrage, Dhalipur for a period of one year
605. 12/EE (Civil-I)/LMP/2023-24 20-01-2024 17-02-2024 Dakpathar Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Supply and Installation of Portable Office cabin/container of size 20’ x 10’ x 8.5’ (Lift & Shift type) at Lakhwar Multi-Purpose project in District Dehradun/Tehri Garhwal
606. 40/EE (GEN)/MB-II/2023-24 18-01-2024 17-02-2024 Chinyalisaur The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply, Installation, Testing and commissioning of digital oil level indicator for bearing oil bath of 76 MW Machine at MB-II, Dharasu Power House, Chinyalisaur, Uttarakashi.
607. 21/EE(M)/RPSK/2023-24 26-01-2024 16-02-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual contract for routine maintenance works
608. 12/EE(IC&CM)/2023-24 25-01-2024 16-02-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE(IC&CM) Hindi Translation and Printing of annual financial Report of UJVN Ltd. for the F.Y. 2022-23
609. 13/EE(Gen)/Vyasi/23-24 18-01-2024 16-02-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer General Repairing, Maintenance works of 220 KV Pothead yard and Metering works at Vyasi HEP.
610. 21/EE(C&M)/MB-II/Joshiyara/2023-24 01-02-2024 15-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Deployment of one number Retired Tehsildar and one number Revenue Inspector for proper maintenance of Purchased and Acquired land and land records of M.B-II project, at Joshiyara, Uttarkashi.
611. 20/EE(C&M)/MB-II/Joshiyara/2023-24 01-02-2024 15-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards with Driver for Office of Executive Engineer(C&M) MB-II, Joshiyara for the period of one year.
612. 10/EE(Civil-II)/Guptkashi/2023-24 30-01-2024 15-02-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Site Clearance and Protection of Weir Site at Madhyamaheshwar SHP (3x5) in District- Rudraprayag
613. 06/DGM(IT)/EE (E&M-I)/2023-24 25-01-2024 15-02-2024 Dehradun Office of the EXECUTIVE ENGINEER (E&M-I) “Ujjwal”, IT- Department, Dehradun EXECUTIVE ENGINEER Supply of IT equipment at UJJWAL, UJVN Limited, Dehradun for Arakot Tiuni & Tiuni Plasu Project.
614. 25/EE(E&M-II)/LP/2023-24 25-01-2024 15-02-2024 Dehradun Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun Executive Engineer Supply & Construction of 11 KV feeders from Lakhwar Substation to Different Locations of Lakhwar MPP
615. NIT- 57 /EE (M)/MB-II/2023-24 25-01-2024 15-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Valves of MIV at Dharasu Power House
616. NIT- 58/EE(M)/MB-II/23-24 25-01-2024 15-02-2024 Uttarkashi e-Tender NOTICE The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Engagement of Underwater Diving Team for under water works at Dharasu power House
617. 09/EE(G)/2023-24 23-01-2024 15-02-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Supply of silver coated flexible braided copper connector and bimetallic strip (Cu+Al) for 3x30 MW Tiloth Power House, Uttarkashi.
618. 15/EE(M)/2023-24 15-01-2024 15-02-2024 Uttarkashi The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi Executive Engineer Annual maintenance contract for operation of drinking water plant, HT/LT lines, sweeping-cleaning at different substations of Tiloth Power House
619. 13 /EE(E&M)/Vyasi Dam/2023-24 19-01-2024 15-02-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd Executive Engineer Design, Drawing, Supply, Installation, Testing & Commissioning of Log Boom Barrier at Vyasi Dam Site at Juddo, Dehradun
620. 42/EE(Pathri)/2023-24 24-01-2024 14-02-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Hiring of two no. 7 (6+1) seater diesel vehicle (along with driver’s services) for official use of Executive Engineer, Pathri & DGM, HGC, Pathri and one no. driver for running of departmental ambulance for a period of one year
621. 14/EE(Generation)/Vyasi/2023-24 18-01-2024 14-02-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Purchase of 75 Mbps Internet Leased Line with SIP numbers for Vyasi HEP for one year
622. 17/EE(M)/2023-24 16-01-2024 14-02-2024 Uttarkashi The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi Executive Engineer Annual contract for operation of DPH Tiloth & DPH Heena of Tiloth Power House, Uttarkashi.
623. 35/EE (GEN)/MB-II/2023-24 15-01-2024 14-02-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Routine maintenance work of LT and Switchyard at MB-II, Dharasu Power House.
624. 19/EE(M)/2023-24 23-01-2024 13-02-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Repairing, overhauling & foundation work of 25 HP capacity centrifugal pump
625. 18/EE(M)/2023-24 23-01-2024 13-02-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Repairing and overhauling of Cooling Tower
626. 21/EE(IE&M-II)/LP/2023-24 12-01-2024 13-02-2024 Dakpathar Dakpathar Executive Engineer Modification in 33/11 kV Lakhwar MPP Substations along with SITC of energy accounting System
627. 06/EE(Test)/DKN/2023-24 24-12-2023 13-02-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer AMC of Computer and other peripherals
628. 29/EE(Civil)/MB-I/TN/2023-24 29-01-2024 12-02-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Supply of Stationary items at the Office of DGM(CM-BV) at Maneri, Uttarkashi
629. 28/EE(Civil)/MB-I/TN/2023-24 29-01-2024 12-02-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Cleaning & Gardening of Maneri Dam Complex at Maneri Uttarkashi.
630. 17/GM(CDH&NP)/UJVNL/2023-24 23-01-2024 12-02-2024 Uttarkashi Uttarkashi ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
631. 16/GM(CDH&NP)/UJVNL/2023-24 23-01-2024 12-02-2024 Uttarkashi Uttarkashi ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
632. 15/GM(CDH&NP)/UJVNL/2023-24 23-01-2024 12-02-2024 Uttarkashi Uttarkashi ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
633. 19/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 19-01-2024 12-02-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Interior & Exterior painting work of TypeIVth residences at Hydel Colony Kalagarh.
634. 18/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 19-01-2024 12-02-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Treatment of Leakage in Penstock Gallery of Unit No. 01 and other balance work of Ramganga Power House Kalagarh
635. 24/EE-II (E&M-LWR)/LP/2023-24 19-01-2024 12-02-2024 Dakpathar Supply of Electrical appliances at Field Hostel & Electrical Wiring for Transit Camp at Kandriyan Lakhwar Project. Executive Engineer Supply of Electrical appliances at Field Hostel & Electrical Wiring for Transit Camp at Kandriyan Lakhwar Project.
636. 39/EE (GEN)/MB-II/2023-24 17-01-2024 12-02-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer M&R of LED fixtures including strengthening of illumination system installed at Dharasu Power House.
637. 38/EE (GEN)/MB-II/2023-24 17-01-2024 12-02-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply and Installation of Resistance Temperature Detector (RTD) and Winding Temperature Scanner in UAT & SAT at Dharasu Power House
638. 37/EE (GEN)/MB-II/2023-24 17-01-2024 12-02-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Cleaning in 220 kV Switchyard and other associated works at Dharasu Power House for the year 2024-25.
639. 36/EE (GEN)/MB-II/2023-24 17-01-2024 12-02-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Maintenance Contract (AMC) for CCTV and Security Related Items at different location of MB-II, Dharasu Power House for the period of one year
640. 14/GM(CDH&NP)/UJVNL/2023-24 29-12-2023 12-02-2024 Uttarakhand Uttarakhand ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
641. 13/GM(CDH&NP)/UJVNL/2023-24 29-12-2023 12-02-2024 Uttarakhand Uttarakhand ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
642. 12/GM(CDH&NP)/UJVNL/2023-24 29-12-2023 12-02-2024 Uttarakhand Uttarakhand ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
643. 11/GM(CDH&NP)/UJVNL/2023-24 29-12-2023 12-02-2024 Uttarakhand Uttarakhand ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
644. 10/ GM (CDH&NP)/UJVNL /2023-24 09-11-2023 12-02-2024 Pithoragarh Pithoragarh ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
645. 09/ GM (CDH&NP)/UJVNL /2023-24 09-11-2023 12-02-2024 Pithoragarh Pithoragarh ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
646. 08/ GM (CDH&NP)/UJVNL /2023-24 09-11-2023 12-02-2024 Pithoragarh Pithoragarh ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
647. 01/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
648. 02/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
649. 03/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
650. 04/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
651. 05/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
652. 06/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
653. 07/ GM (CDH&NP)/UJVNL/2023-24 23-10-2023 12-02-2024 UTTARAKHAND UTTARAKHAND Others INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
654. 16/EE(E&M)/(SHP)/RISHIKESH/2023-24 25-01-2024 09-02-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Supply, Erection, Testing and Commissioning of switchyard equipments and associated misc work at 2x1500kW Urgam SHP in District Chamoli.
655. 22/EE-II (E&M-LWR)/LP/2023-24 18-01-2024 09-02-2024 Dakpathar Office of the Executive Engineer-II (E&M), LakhwarProject, Dakpathar, UJVN Ltd. Executive Engineer Repairing of Electrical Wiring of Lakhwar Guest House & Field Hostel at Dakpathar
656. 41/EE(Pathri)/2023-24 24-01-2024 08-02-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer O&M works of Cooling Water System of Pathri Power House during monsoon period.
657. 27/EE/PCM-DKP/TN/2023-24 18-01-2024 08-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of C-Type Residences of Tons Colony at Dakpathar, Dehradun
658. 26/EE/PCM-DKP/TN/2023-24 18-01-2024 08-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of C-Type Residences of Old & New Yamuna Colony at Dakpathar, Dehradun
659. 25/EE/PCM-DKP/TN/2023-24 18-01-2024 08-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of B-Type Residences of Tons Colony at Dakpathar, Dehradun
660. 24/EE/PCM-DKP/TN/2023-24 18-01-2024 08-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of B-Type Residences of Old & New Yamuna Colony at Dakpathar, Dehradun
661. T-31/EEM/2023-24 17-01-2024 08-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing work of 48 No. strainer buckets at power house.
662. T-30/EEM/2023-24 17-01-2024 08-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing and overhauling work of water filtration plant of Chilla Power House
663. 02/DGM(E&M SHP)/Suringad-II/2023-24 16-01-2024 08-02-2024 Pithoragarh Office of the DGM(E&M-SHP), Pithoragarh DGM Construction of RCC toe wall and saddle support for protection of feeder pipe of 2X2.5MW Suringad stage-II SHP, tehsil-Munsyari in district Pithoragarh
664. 06/EE(GC)/2023-24 10-01-2024 08-02-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer General Overhauling and Maintenance of Generator, Turbine, and OPU of Unit No. # 01 of Galogi SHP
665. 16/2023-24/EE/PCM(GV)/Mayapur 31-01-2024 07-02-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Leakage Treatment work of Machine No. 2 & Water Cooling Line Duct at Mohammadpur Power House
666. 18/EE(C&M)/MBII/Joshiyara/2023-24 23-01-2024 07-02-2024 Uttarkashi Office of the Executive Engineer (C&M) Maneri Bhali Stage – II Joshiyara, Uttarkashi Executive Engineer Repair of damaged boundary wall, behind typeIII nigam quarters at MB-II, Joshiyara, Uttarkashi
667. 17/EE(C&M)/MB-II/Joshiyara/2023-24 23-01-2024 07-02-2024 Uttarkashi Office of the Executive Engineer (C&M) Maneri Bhali Stage – II Joshiyara, Uttarkashi Executive Engineer Development and widening of UJVNL Road to Manera bypass at Joshiyara Barrage MB-II, Uttarkashi
668. 16/EE(C&M)/MB-II/Joshiyara/2023-24 23-01-2024 07-02-2024 Uttarkashi Office of the Executive Engineer (C&M) Maneri Bhali Stage – II Joshiyara, Uttarkashi Executive Engineer Annual Civil Repair & Maintenance of Joshiyara Barrage, Uttarkashi
669. 28/EEM/2023-24 17-01-2024 07-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Supply and Application of Coating Material on different Underwater parts in Unit No-3 of Power House
670. 17/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 16-01-2024 07-02-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Repair & Reconstruction Work of drains in type-IVth and Type-IIIrd residential area at Hydel Colony Kalagarh
671. 16/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 16-01-2024 07-02-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Renovation of balance 09 Nos. garages and approach roads in Type-III residencies at Hydel Colony Kalagarh
672. 05/EE(E&M)/Maneri Dam/2023-24 16-01-2024 06-02-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer work of removal of deposited sediments from one no. hopper at Maneri Dam, Maneri, Uttarkashi
673. 08/EE(G)/TPH/2023-24 16-01-2024 06-02-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Supply, Installation, Testing and Commissioning of 33 kV Vacuum Circuit Breakers at 33 kV switchyard at Tiloth Power House, Uttarkashi
674. 33/EE (GEN)/MB-II/2023-24 15-01-2024 06-02-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer SITC of 15 Nos. Capacitive Voltage Transformer including interfacing with existing control, protection and metering scheme and dismantling of existing Capacitive Voltage Transformer installed at 220 kV switchyard of Dharasu Power House
675. 34/EE (GEN)/MB-II/2023-24 15-01-2024 06-02-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer General Cleaning work at MB-II, Dharasu Power House for the year 2024-25
676. 25/SPH/23-24 10-01-2024 06-02-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Cleaning of trash rack and disposal of debris from collecting pit of Sharda Power House, Lohiahead.
677. 27/EE(Civil)/MB-I/TN/2023-24 22-01-2024 05-02-2024 Uttarkashi Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi Executive Engineer Civil Maintenance & repair of Various type of residences at Kuteti Devi Colony, Uttarkashi.
678. 26/EE(Civil)/MB-I/TN/2023-24 22-01-2024 05-02-2024 Uttarkashi Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Electrical work at Maneri Dam Colony, Maneri, Uttarkashi
679. 25/EE(Civil)/MB-I/TN/2023-24 22-01-2024 05-02-2024 Uttarkashi Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Maintenance and Repair of Maneri Dam Colony, Maneri, Uttarkashi
680. 16/EE(M)/2023-24 15-01-2024 05-02-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Supply and application of wear and protective coating on underwater parts of Unit #1
681. 55/EE (M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Rotating shaft Sleeve for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
682. 56 /EE (M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Guide vane leaver assembly at Dharasu Power House
683. 54/EE(M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Enamel Painting of Valve House Equipment, surge tank and other areas at Dharasu Power House M.B -II Uttarkashi
684. 52/EE(M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Providing and fixing of Electronic Drain Valve in General Purpose Compressor and other work at Dharasu Power House, MB-II.
685. 51/EE(M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and Overhauling of Ventilation System at Dharasu Power House M.B-II, Uttarkashi.
686. 53/EE (M)/MB-II/2023-24 15-01-2024 05-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Protective Coating of underwater parts of turbine of Dharasu Power House Uttarkashi
687. 24/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 02-01-2024 05-02-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hill slope protection work behind Dharasu Power House of Maneri Bhali Project Stage-II at Dharasu,(Uttarkashi)
688. 22/EE(Civil)/MB-I/TN/2023-24 20-01-2024 03-02-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual sweeping and cleaning work of DGM(CM-BV) office and Maneri Dam Colony at Maneri, Uttarkashi
689. 24/EE(Civil)/MB-I/TN/2023-24 20-01-2024 03-02-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Hiring of One number Non AC diesel Vehicle such as Mahindra Bolero or Equivalent with driver for one year for EE (Civil), MB-I, at Maneri, Uttarkashi.
690. 23/EE(Civil)/MB-I/TN/2023-24 20-01-2024 03-02-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Hiring of One number Non AC diesel Vehicle such as Mahindra Bolero or Equivalent without driver for one year for all AEs (Civil), MB-I, at Maneri, Uttarkashi.
691. 21/UJVNL/EE(M&G)/KPS/2023-24 13-01-2024 03-02-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Fabrication work of various items at Kulhal Power House
692. 20/UJVNL/EE(M&G)/KPS/2023-24 13-01-2024 03-02-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Supply and application of coating material on stay vanes and stay ring area of Unit -A at Kulhal Power Station
693. 19/UJVNL/EE(M&G)/KPS/2023-24 13-01-2024 03-02-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual contract for Operation and Maintenance activities at Kulhal Power Station
694. 18/UJVNL/EE(M&G)/KPS/2023-24 13-01-2024 03-02-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Gardening, Grass cutting of Power House & Switchyard (132KV) area jungle cleaning, grass cutting & other associated work at Kulhal Power Station
695. 21/EE(G)/CPH/2023-24 12-01-2024 03-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Overhauling & re-gasketing of generator transformer (69 MVA, 11/220 kV, 3-ø) of Unit- 3 at Chibro Powerhouse
696. 20/EE(Maint.)/Khodri/2023-24 12-01-2024 03-02-2024 Dehradun Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Overhauling and application of protective coating on Surge tank and DT gate of Khodri Power House.
697. 01/EE(Civil-IV)/LMP/2023-24 20-12-2023 03-02-2024 Dakpathar Office of the Executive Engineer (Civil-IV) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun Executive Engineer Supply, Installation and Monitoring of Instruments in underground Power house Cavern of Lakhwar Multipurpose Project (300 MW) in Dist. Dehradun, Uttarakhand
698. 17/2023-24/EE(C-M)Vyasi Project 13-01-2024 02-02-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer “Landscaping & Beautification work in Power House Complex of Vyasi HEP(2x60 MW), Hathiyari, Dehradun
699. 16/2023-24/EE(C-M)Vyasi Project 13-01-2024 02-02-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Landscaping work at hill side of approach road of plunge pool at Left bank of Vyasi Dam at Juddo
700. 13/EE(E&M-SHP)/Kaliganga-I/2023-24 08-01-2024 02-02-2024 Guptkashi Executive Engineer Executive Engineer Supply of electrical consumables in Kaliganga-I SHP (2x2 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand.
701. 13/EE(E&M-I)/LP/2023-24 10-01-2024 02-02-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Re-conductoring & Re-strengthening of 33 KV Dhakrani Lakhwar Construction Power line no- 02.
702. 05/EE(G.C.)/2023-24 03-01-2024 02-02-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Procurement of Spares of 11 KV VCB Along with Fixing, Testing and Commissioning at Galogi SHP
703. 04//EE(Civil)/Tiuni Plasu/2023-24 12-01-2024 01-02-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Renovation of office building of Arakot-Tiuni and Tiuni-Plasu offce at Dakpathar
704. 25/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 08-01-2024 01-02-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Development of approach road behind water storage tank near officer transit hostel at Shaktipuram colony MB-II Chinyalisaur
705. 05/EE(Civil)/KB/2023-24 16-01-2024 31-01-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Construction of Level Reference pillars for Katapathar Barrage Project, Dehradun
706. 23/EE/PCM-DKP/TN/2023-24 16-01-2024 31-01-2024 Executive Engineer Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Upkeep Works Related to Dakpathar Barrage at Dakpathar (Dehradun).
707. 18/2023-24/EE(C)/Pashulok Barrage 11-01-2024 31-01-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Miscellaneous Civil Works in Office Premises of Pashulok Barrage Rishikesh
708. 17/2023-24/EE(C)/Pashulok Barrage 11-01-2024 31-01-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual Upkeeping and Horticulture works of Virbhadra Barrage Premises & Office at Rishikesh.
709. 07/EE(E&M)/AB/2023-24 11-01-2024 31-01-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Work for new wiring for improvement of new store, guard room and existing store etc
710. 06/EE(E&M)/AB/2023-24 11-01-2024 31-01-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer AMC of Hydro-Mechanical and Electro-Mechanical Equipment
711. 14/EE(M)/2023-24 10-01-2024 31-01-2024 Uttarkashi The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi Executive Engineer Hiring of 01 no. non AC diesel vehicle
712. 20/EE-II (E&M)/LP/2023-24 10-01-2024 31-01-2024 Dakpathar Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar Executive Engineer Repairing & Overhauling of 500 kVA, 250 kVA transformers and other associated work of 33/11kV Substation Hathiyari.
713. 26/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 08-01-2024 31-01-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of one number M&M Bolero Neo/Honda Elevate or equivalent Non AC Diesel/Petrol Vehicle (Model 2022 and onwards) along with driver for Executive Engineer (Civil), MB-II, Chinyalisaur for the period of 12 months
714. 11/EE(E&M-SHP)/KG-II/2023-24 06-01-2024 31-01-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Repair and maintenance of Unit-II of Kaliganga-II SHP (2x2.25 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag.
715. 11/EE(IC&CM)/2023-24 09-01-2024 30-01-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE Supply of CTs and PTs for different power houses/sites of UJVN Ltd.
716. 28/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 08-01-2024 30-01-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Civil Maintenance work of CP & DP type Residential building at Shaktipuram colony, Chinyalisaur, Uttarkashi.
717. 27/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 08-01-2024 30-01-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Civil Maintenance work of AP & BP type Residential & Non Residential building of Shaktipuram colony at Chinyalisaur, Uttarkashi.
718. 07/UJVNL/EE(C-SBR)/2023-24 08-01-2024 30-01-2024 Pithoragarh Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh Executive Engineer Construction of Temporary Approach road to Power House Portal of Sirkari Bhyol Rupasiabagar HEP (120 MW) at Tehsil Munsiyari District Pithoragarh .
719. 15/EE(E&M)(SHP)/Rishikesh/2023-24 11-01-2024 29-01-2024 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Miscellaneous Electromechanical works at 2x1500kW Urgam SHP in District Chamoli.
720. 10/EE(IC&CM)/2023-24 08-01-2024 29-01-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE(IC&CM) Procurement of testing equipments for different Power Houses of UJVN Ltd
721. NIT- 05/EE(T)/MB-II/23-24 06-01-2024 29-01-2024 Chinyalisaur The office of Executive Engineer (Test), MB-II, Dharasu Power House, Chinyalisaur Executive Engineer Up Keeping and Maintenance Of GM (BV)/ DGM (HGC) Offices, Officers Club, JE Club,Type-3 club and 11kv/0.4kv Substation in Shaktipuram Colony, Chinyalisaur.
722. 50/EE(M)/MB-II/23-24 08-01-2024 29-01-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Boring Machine for Turbine at Dharasu power House M.B -II, Uttarkashi
723. 49/EE(M)/MB-II/23-24 08-01-2024 29-01-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Maintenance for Hydro-Mechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months
724. 28/EE/PCM/Dhalipur/ 2023-24 03-01-2024 29-01-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer M&R works of Power Channel including other work from Asan Barrage to Kulhal Power House, Dehradun
725. 10/EE(Generatlon)/Vyasil2023-24 01-01-2024 29-01-2024 Dakpathar The offce of Execulve Engineer (Generatlon). Vyas! Power Staion, Dakpathar Execulve Engineer Repairing, Servicing & overhauing of 10T EOT Crane in GIS Hall of Vyasi Power House
726. 18/EE(M)/VP/2023-24 08-01-2024 28-01-2024 Dehradun Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun Executive Engineer Hiring of One No. Non-AC Diesel Vehicle along with Driver (Mahindra Bolero or equivalent) for Vyasi Project Juddo Dam Site for a period of One year
727. 04/EE(Civil)/KB/2023-24 12-01-2024 27-01-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Geo-Technical Investigation works at Katapathar Barrage in District-Dehradun, Uttarakhand.
728. 08/EE(Test)/DKN/2023-24 06-01-2024 27-01-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Procurement and Installation of various electronic/digital equipments
729. 07/EE(Test)/DKN/2023-24 06-01-2024 27-01-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Supply of Printer Cartridges
730. T-27/EEM/2023-24 05-01-2024 27-01-2024 Pauri Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Removal of silt from drainage/dewatering gallery nearby area at Power House
731. T-26/EEM/2023-24 05-01-2024 27-01-2024 Pauri Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer AMC work of 33kV Chilla Bhoopatwala Feeder and Project Colony, Mayapur Haridwar
732. 12/EE(Generation)/Vyasi/2023-24 05-01-2024 27-01-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer General Maintenance of 75 MVA Generating Transformers and related fabrication works at GTs bay of Vyasi Hydro Power Station (2x60MW), Hathiyari (Dehradun)
733. 02/UJVNL/ EE(CD-III)/ Lakhwar /2023-24 04-01-2024 27-01-2024 Dehradun Office of the Executive Engineer (CD-III), CD&H, UJVN Limited, Pashulok, Rishikesh, Dehradun Executive Engineer Carrying out GLOF studies at Lakhwar Dam site on river Yamuna
734. 12/EE(Civil-I)/Urgam/2023-24 23-12-2023 27-01-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Construction of launching apron and allied works at downstream side of Diversion weir at Urgam SHP (2x1.5) MW in Distt. Chamoli.
735. 05/DGM(IT)/EE (E&M-I)/2023-24 11-01-2024 25-01-2024 Dehradun Office of the EXECUTIVE ENGINEER (E&M-I) “Ujjwal”, IT- Department, Dehradun EXECUTIVE ENGINEER Supply of IT items at UJJWAL, Dehradun for Lakhwar project
736. 19/EE/M&G/DLR/2023-24 11-01-2024 25-01-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Annual Cleaning of Dhalipur Power House Intake Trash Rack, Parks, Power House Campus, Pitching walls, uneven field, Switchyard .
737. 14/EE(Civil-I)/Galogi/2023-24 09-01-2024 25-01-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Protection work at upstream side of Diversion weir at Galogi SHP 3.5 MW in DisttDehradun
738. 24/SPH/2023-24 04-01-2024 25-01-2024 Khatima Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply of various copper and aluminium cables required for electrical maintenance work at Sharda Power House, Lohiahead.
739. 14/EE(E&M)(SHP)/Rishikesh/2023-24 01-01-2024 25-01-2024 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Modification of Existing Cooling Water System at RPN SHP, Dunao (2X750 kW) in District Pauri Garhwal.
740. 12/Manager(A&S)/2023-24 03-01-2024 24-01-2024 Dehradun Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun Manager (A&S) Leveling work of the land and disposal of building malba or waste materials adjacent to the New Corporate Office Building, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun
741. 11/EE (Civil-I)/LMP/2023-24 04-01-2024 24-01-2024 Dakpathar Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Special Repair of Lakhwar Bhawan-I at Dakpathar (Dehradun)
742. 10/EE (Civil-I)/LMP/2023-24 04-01-2024 24-01-2024 Dakpathar Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer “Construction of Site Office at Dam top andMiscellaneous Construction Works in Lakhwar Multipurpose Project
743. 40/EE(Pathri)/2023-24 03-01-2024 24-01-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Operation & Maintenance works of Trash Rack Cleaning Machine of Power House
744. 39/EE(Pathri)/2023-24 03-01-2024 24-01-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Removal of Debris from Intake of Power House.
745. 27/EE(M&G)/MPH/2023-24 15-12-2023 24-01-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Removal of debris from Trashpit,forebay and Trashrack of Mohammadpur Power House fro one year
746. 12/EE(E&M-SHP)/Madhyamaheshwar/2023-24 08-01-2024 23-01-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Construction of one number 33 kV Bay at existing 33/11 kV substation Ukhimath of UPCL, in tehsil Ukhimath, district Rudraprayag, Uttarakhand.
747. 12/2023-24/EE(C-M)Vyasi Project 09-01-2024 23-01-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Operation of Mahseer Hatchery at Vyasi Dam , Juddo, Distt. Dehradun
748. 13/EE(Civil-I)/KG-II/2023-24 29-12-2023 23-01-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Supply and Installation of Butterfly valve & other Hydro-mechanical works at Project Kaliganga-II (2x2.25 MW) SHP in District – Rudraprayag.
749. 15/2023-24/EE(C-M)Vyasi Project 08-01-2024 22-01-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual cleaning, Up keeping and Clearing of grass of Steel Store campus at Dakpathar, Dehradun
750. 14/2023-24/EE(C-M)Vyasi Project 08-01-2024 22-01-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Cleaning and upkeeping of Dam site office (Civil) Vyasi HEP at Juddo Dehradun
751. 13/2023-24/EE(C-M)Vyasi Project 08-01-2024 22-01-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Cleaning, Upkeeping and other associated works of site office at power house complex Vyasi HEP at Hathiyari, Dehradun
752. 10/EE(E&M-SHP)/KG-I/2023-24 06-01-2024 22-01-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Repair and maintenance of Unit-II of Kaliganga-I SHP (2x2 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag.
753. 36/EEM&G)DKN/2023-24 06-01-2024 22-01-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Wear protection coating on underwater parts of Unit-C.
754. 13/EE(Civil-III)/LMP/2023-24 02-01-2024 22-01-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Pre-fabricated site office/ Meeting hall at Power house site of LMPP Distt. Dehradun .
755. 11/EE(Generatlon)/Vyasil2023-24 01-01-2024 22-01-2024 Dakpathar The offce of Execulve Engineer (Generatlon). Vyas! Power Staion, Dakpathar Execulve Engineer Comprehensive AMC of Network CCTV Camera System at Vyasl HEP
756. 17/EE(M)/VP/2023-24 02-01-2024 22-01-2024 Dakpathar Office of the Executive Engineer( Maint.), Vyasi Project, Dakpathar Executive Engineer Annual maintenance work of turbine and its accessories equipments of Unit-1 & 2 of Vyasi Project, Hathiyari
757. 02/EE(Civil-SHP)/Dharchula/2023-24 27-12-2023 22-01-2024 Dharchula Office of the Executive Engineer (Civil-SHP), Dharchula Executive Engineer Covering work of forebay tank and power channel of 2X2.5 MW Suringad stage-II SHP, tehsil-Munsyari in district Pithoragarh
758. 01/EE/BP/2023-24 18-12-2023 22-01-2024 Tehri Garhwal Office of the Executive Engineer, Bhilangna Projects, UJVN Ltd., Ghansali, Tehri Garhwal Executive Engineer Construction of Access Path & Tin Shed at Cremation Place (Ghat) at Vill.- Samangaon, BlockBhilangna, Distt.- Tehri Garhwal
759. 22/UJVNL/EE(M&G)/KPS/2023-24 13-01-2024 20-01-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Repair and Strengthening of the affected portion of the stator core of the 10 MW Generator of Unit # C at Kulhal Power Station
760. 18/EE/M&G/DLR/2023-24 06-01-2024 20-01-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Supply and application of ceramic based coating on stay vanes of unit A at Dhalipur power station.
761. 17/EE/M&G/DLR/2023-24 06-01-2024 20-01-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Cleaning of Intake Trash Rack Bed of Intake Power Channel through out the intake span with the help of Dredger Machine of Dhalipur Power Station
762. 15/EE(CM)/DDN/2023-24 30-12-2023 20-01-2024 Executive Engineer Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of Type- II (P-II & SBC) residences of UJVN Limited at yamuna colony, Dehradun
763. 14/EE(CM)/DDN/2023-24 30-12-2023 20-01-2024 Executive Engineer Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of Type- IV residences of UJVN Limited at yamuna colony, Dehradun
764. 13/EE(CM)/DDN/2023-24 30-12-2023 20-01-2024 Executive Engineer Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of Non-residential buildings of UJVN Limited at yamuna colony, Dehradun
765. 19/EE-II (E&M-LWR)/LP/2023-24 04-01-2024 19-01-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II SITC of LT panels for 33/11 kV Hathiyari Substation, Dakpathar
766. 11/EE(E&M-I)/LP/2023-24 29-12-2023 19-01-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Repair and Maintenance of 33 KV and 11 KV Feeders of Lakhwar Project, Dakpathar, Dehradun
767. 09/EE(Civil-II)/Guptkashi/2023-24 03-01-2024 18-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Protection work near TRC and other Miscellaneous works at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
768. 08/EE(Civil-II)/Guptkashi/2023-24 03-01-2024 18-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Protection work near Penstock and Powerhouse and other Miscellaneous works at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag.
769. 06/EE(G)/Klg/2023-24 28-12-2023 18-01-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Overhauling of 03 MVA, 33/11 kV Distribution Transformers (02 Nos.).
770. 16/EE(M)/VP/2023-24 29-12-2023 18-01-2024 Dakpathar Office of the Executive Engineer( Maint.), Vyasi Project, Dakpathar, Executive Engineer Routine annual mechanical maintenance work of units & its auxiliaries of Vyasi Project at Hathiyari, Dakpathar, Dehradun
771. 11/EE(E&M)/Vyasi Dam/2023-24 28-12-2023 17-01-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Cleaning work of Dam reservoir at Vyasi Dam, Juddo Dehradun
772. 13/EE(E&M)(SHP)/Rishikesh/2023-24 01-01-2024 16-01-2024 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Supply, Erection, Testing and Commissioning etc. of new LT Line from Forbay to Intake and 33kV related works at 2X1125 kW Pilangad SHP, in District- Uttarkashi, Uttarakhand.
773. 22/EE/PCM-DKP/TN/2023-24 26-12-2023 16-01-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Hiring of one number diesel vehicle such as Mahindra bolero or equivalent (excluding fuel) with driver for office of the Executive Engineer, Project Civil Maintenance – Dakpathar.
774. 07/EE (G)/TPH/2023-24 27-12-2023 16-01-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual Contract for Cutting, digging and uprooting the big bushes & grass of 220 kV/33 kV switchyard and GTF deck area of Tiloth Power House, Uttarkashi
775. 04/EE(Test.)/MB-II/2023-24 20-12-2023 16-01-2024 Chinyalisaur The office of Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply, Installation, Testing & Commissioning of 220 VDC, 1395 AH, Battery Bank Including Buy back of old Batteries at Dharasu Power House, Chinyalisaur, Uttarkashi
776. 01/UJVNL/ EE(CD-III)/ Lakhwar /2023-24 30-12-2023 15-01-2024 Rishikesh Office of the Executive Engineer (CD-III), CD&H, UJVN Limited, Pashulok, Rishikesh, Dehradun Executive Engineer Review & Updating of Hydrology of Lakhwar MPP.
777. 25/EEM/2022-23 24-12-2023 13-01-2024 Pauri Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer O&M work of clean water pumping station and AMC of plumbing related works at project colony chilla
778. 24/EEM/2022-23 24-12-2023 13-01-2024 Pauri Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Hiring of 01 No. diesel driven ambulance vehicle along with driver for 12 months for Chilla Project Colony .
779. 05/EE(Civil-II)/Guptkashi/2023-24 18-12-2023 13-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Providing & Laying Water supply line for project affected village Saruna at Madhyamaheshwar SHP (3x5 MW) in DisttRudraprayag.
780. 04/EE(Civil-II)/Guptkashi/2023-24 18-12-2023 13-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Construction of foothpath for project affected village Pali at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag.
781. T-05/EE(Solar)/2023-24 30-10-2023 13-01-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Setting-up of 4.0 MW Ground Mounted Grid Connected Solar PV Plants near Dharasu HEP Chinyalisaur District- Uttarkashi, Uttarakhand.
782. T-04/EE(Solar)/2023-24 30-10-2023 13-01-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Setting-up of 4.0 MW Ground Mounted Grid Connected Solar PV Plants near Bhatwari District- Uttarkashi, Uttarakhand
783. T-03/EE(Solar)/2023-24 30-10-2023 13-01-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Setting-up of 7.75 MW Ground Mounted Grid Connected Solar PV Plants at Aungi near Maneri, District- Uttarkashi, Uttarakhand
784. 03/EE(R&R)/LMP/2023-24 23-12-2023 12-01-2024 Dakpathar Office of the Executive Engineer (R&R), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Providing service of 02 Nos. Data Entry Operator and 01 No. Helper for office of the Rehabilitation and Resettlement Officer (Tehri Garhwal), Lakhwar Multipurpose Project
785. 34/EEM&G)DKN/2023-24 21-12-2023 12-01-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer AMC for Mechanical type Governors and Misc. maintenance works
786. 33/EEM&G)DKN/2023-24 21-12-2023 12-01-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of one No. Non AC diesel (Mahindra Camper or equivalent) vehicle for one year
787. 32/EEM&G)DKN/2023-24 21-12-2023 12-01-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Strengthening of fencing security system of Dhakrani Power Station
788. 13/EE(M)/2023-24 22-12-2023 12-01-2024 Uttarkashi The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi Executive Engineer Hiring of 01 No. 26 + 1 seater bus for Tiloth Power House Uttarkashi.
789. 09/EE(Generation)/Vyasi/2023-24 22-12-2023 12-01-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Annual Maintenance works of 60MW Generators and associated equipment of both units of Vyasi Power Station (2 x 60MW), Hathiyari (Dehradun)
790. 38/EE(Pathri)/2023-24 21-12-2023 12-01-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Hiring of vehicles for school going children of Pathri Power House Colony
791. 15/EE(M)/VP/2023-24 08-11-2023 12-01-2024 Dehradun Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun Executive Engineer Hiring of One No. 05 Seater light utility vehicle along with driver for one year period for Vyasi Dam, Juddo
792. 16/EE/M&G/DLR/2023-24 22-12-2023 11-01-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Annual Cleaning and Up-keeping work of Dhalipur power station.
793. 03/EE(Civil)/KB/2023-24 21-12-2023 11-01-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Construction of Level Reference pillars for Katapathar Barrage Project, Dehradun
794. 23/SPH2023-24 18-12-2023 11-01-2024 Khatima Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Calibration of monitoring and measuring equipments installed at Sharda Power House Lohiahead
795. 07/EE(Civil-II)/Guptkashi/2023-24 27-12-2023 10-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi, Executive Engineer Finishing & Rock slope protection in Forebay and other Miscellaneous works at Madhyamaheshwar SHP (3x5 MW) in DisttRudraprayag
796. 06/EE(Civil-II)/Guptkashi/2023-24 27-12-2023 10-01-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Finishing work at Escape and other Miscellaneous works at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
797. 27/EE/PCM/Dhalipur/ 2023-24 14-12-2023 10-01-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer M&R works of Dhakrani Power House Colony at Dhakrani, (Dehradun)
798. T-23/EEM/2023-24 19-12-2023 09-01-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing work of 3 No.s stator coolers of Power House
799. T-22/EEM/2023-24 17-12-2023 08-01-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer SITC of 5 Ton (Remote Operated) Electric hoist Crane at Central Store at Chilla
800. T-21/EEM/2023-24 17-12-2023 08-01-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repair and other related work of Overhead Crane roof of Chilla Central Store.
801. NIT-48/EE(M)/MBII/23-24 18-12-2023 08-01-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of 90kW Flygt MakeCooling Water Pumps of Dharasu Power House.
802. NIT-47/EE (M)/MB-II/2023-24 18-12-2023 08-01-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and Strengtheningwork of Cooling pump lifting arrangement at Maneri Bhali Stage-II, Dharasu Power House.
803. 04/DGM(IT)/EE (E&M-I)/2023-24 16-12-2023 08-01-2024 Dehradun Office of the EXECUTIVE ENGINEER (E&M-I) “Ujjwal”, IT-Department, Dehradun Executive Engineer Work/Supply-Rate Contract of Maintenance/Supply of IT Items at various office for UJVN Ltd. located at Dehradun.
804. 10/EE(E&M)/Vyasi Dam/2023-24 18-12-2023 08-01-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Annual Running & Maintenance of 05 KLD sewage Treatment Plant (STP), MBBR Based Technology at Vyasi Dam, Juddo Dist- Dehradun.
805. 26/EE/PCM/Dhalipur/ 2023-24 13-12-2023 08-01-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Supply of Stationary items for Project Civil Maintenance office Dhalipur Dehradun
806. 25/EE/PCM/Dhalipur/ 2023-24 13-12-2023 08-01-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Repair of existing water supply system including boring for Kulhal Power House Colony, Dehradun
807. 21/SPH/2023-24 07-12-2023 08-01-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Hiring of one number diesel driven vehicle model 2023 or later along with services of driver for a period of one year for departmental use for office of Executive Engineer (M&G), Sharda Power House,Lohiahead, Khatima
808. 46/EE(M)/MB-II/23-24 11-11-2023 08-01-2024 Chinyalisaur The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Modification and Repairing of strainer shed structure and extension of Cooling pump hoist traveling path at Maneri Bhali Stage-II, Dharasu Power House
809. 03/EE(Civil)/Tiuni Plasu/2023-24 16-12-2023 06-01-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Extension of old office building of Arakot-Tiuni and Tiuni-Plasu offce at Dakpathar Estimated cost: Rs-2
810. 31/EE (GEN)/MB-II/2023-24 15-12-2023 06-01-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Resin Cast Neutral Grounding Transformer (NGT) for 4X76 MW Generator at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi.
811. 32/EE (GEN)/MB-II/2023-24 15-12-2023 06-01-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of foundation of 220 kV CT at 220KV Switchyard of MB-II Dharasu Power House.
812. 04/EE(E&M)/Maneri Dam/2023-24 14-12-2023 06-01-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer Annual operation and routine maintenance contract of Sirror Irrigation lift scheme at Heena, Uttarkashi
813. 03/EE(E&M)/Maneri Dam/2023-24 14-12-2023 06-01-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer Annual Routine Maintenance (ARM) of Hydro-Mechanical and Electro-Mechanical equipment of Maneri Dam, Maneri Uttarkashi
814. 17/UJVNL/EE(M&G)/KPS/2023-24 14-12-2023 06-01-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Automation of Sealing water tank pumps at Kulhal Power Station
815. 20/EE(G)/CPH/2023-24 16-12-2023 05-01-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Hiring the 1 No. Non AC vehicle (Bolero or equivalent) along with driver for Executive Engineer (Gen), Chibro Power House
816. NIT- 09/EE(E&M)/Vyasi Dam/2023-24 15-12-2023 05-01-2024 Dakpathar The office of Executive Engineer (E&M), Vyasi Dam Juddo, Dakpathar Executive Engineer Supply of illumination Items at Vyasi Dam, Juddo, Dehradun
817. 12/EE(E&M)/PB/2023-24 14-12-2023 05-01-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Strengthing of surveillance system at Virbhadra Barrage, Pashulok, Rishikesh
818. 26/EE(M&G)/MPH/2023-24 15-12-2023 04-01-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Annual Cleaning & Upkeeping of Mohammapur Power House.
819. 25/EE(M&G)/MPH/2023-24 15-12-2023 04-01-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Providing of 9.0 Mbps Internet Leased line services at Mohammadpur Power House.
820. 11/EE(E&M)/PB/2023-24 08-12-2023 04-01-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Hiring of Light diesel vehicle non AC (Mahindra & Mahindra Bolero) or equivalent with driver for a period of 12 months for EE (E&M), Virbhadra Barrage, Pashulok Rishikesh
821. 35/EEM&G)DKN/2023-24 26-12-2023 03-01-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer 1.Wear protection coating on runner of Unit-B.
822. 15/2023-24/EE/PCM(GV)/Mayapur 13-12-2023 03-01-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R Work of Mohammadpur Power House Colony at Mohammadpur for the year 2023-24
823. 14/2023-24/EE/PCM(GV)/Mayapur 13-12-2023 03-01-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R Work of Pathri Power House at Pathri for the year 2023-24.
824. 16/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 13-12-2023 02-01-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Hiring of One No. Light Non AC Diesel Vehicle (M&M Bolero or Equivalent) along with driver for Executive Engineer (Civil), UJVNL, Pashulok Barrage, Rishikesh for One Year.
825. 19/EE(G)/CPH/2023-24 12-12-2023 02-01-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Upgradation & replacement of LT Distribution Panels at Chibro Power House
826. 14/EE(G)/Chilla/2023-24 05-12-2023 02-01-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Providing and Revamping of Gravels in 132kV Switch Yard at Chila Power House.
827. 09/EE(E&M-SHP)/Madhyamaheshwar/2023-24 25-11-2023 02-01-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer :Design, Supply, Installation, Testing & Commissioning of 33 KV Capacitor Banks & Shunt Reactor for Madhyamaheshwar SHP (3x5 MW+15% COL), located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
828. 37/EE(Pathri)/2023-24 15-12-2023 01-01-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Supply, Installation &Commissioning of 01 Set of DC Battery Bank (108V/400 Ah) at Pathri Power House.
829. 42/EE(M)/MB-II/2023-24 20-11-2023 01-01-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Underwater Inspection through ROV (Remotely Operated Vehicle) of track rail guides of Draft Tube Gates, TRC Gates and Draft Tube Liner plates at Dharasu power House M.B -II, Uttarkashi
830. 13/2023-24/EE/PCM(GV)/Mayapur 08-12-2023 29-12-2023 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Providing Approach Road for New Type-IIIrd Residential Building at Mohammadpur
831. 12/2023-24/EE/PCM(GV)/Mayapur 08-12-2023 29-12-2023 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R Work of Mayapur Colony for the year 2023-24
832. 03/DGM(IT)/EE (E&M-I)/2023-24 07-12-2023 29-12-2023 Dehradun Office of the EXECUTIVE ENGINEER (E&M-I) “Ujjwal”, IT- Department, Dehradun Executive Engineer Supply of IT items at UJJWAL, Dehradun for Lakhwar project.
833. 06/EE(G)/2023-24 10-11-2023 29-12-2023 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer supply of silver coated flexible braided copper connector and bimetallic strip (CU+AL) for Tiloth Power House Uttarkashi
834. PDD-14/2023-24 07-12-2023 28-12-2023 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar Executive Engineer Annual contract for Repairing & Rewiring of Dakpathar Residential Colonies .
835. PDD-13/2023-24 07-12-2023 28-12-2023 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar Executive Engineer Annual contract for maintenance & service of 02 Nos. DG sets ( 500 kVA each ) at 33/11 kV S/s DPH,Khodri .
836. 15/EE/M&G/DLR/2023-24 12-12-2023 27-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Supply and application of ceramic based coating on stay vanes of unit B at Dhalipur power station.
837. 08/EE(E&M)/ICHARI/TN/2023-24 06-12-2023 27-12-2023 Dehradun Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Hiring of one number non-AC diesel vehicle (6+1-seater) such as Mahindra Bolero or equivalent with driver (Excluding cost of fuel) for one year for Emergency & Shift duty in Ichari Dam
838. 07/EE(E&M)/ICHARI/TN/2023-24 06-12-2023 27-12-2023 Dehradun Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Hiring of 01 No. Non-AC diesel vehicle (6+1-Seater) such as Mahindra bolero or equivalent with driver for office of Executive Engineer, (E&M), Ichari Dam, Dakpathar, Dehradun for period of one year
839. 22/SPH20213-24 16-12-2023 26-12-2023 Khatima Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima
840. 18/EE(E&M)/MB-II/Barrage/2023-24 06-12-2023 26-12-2023 Joshiyara Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Procurement of various mechanical fittings for sedimentation gallery at Joshiyara barrage Uttarkashi
841. 17/EE(E&M)/MB-II/Barrage/2023-24 06-12-2023 26-12-2023 Uttarkashi The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Piping work for fair weather channel at Joshiyara barrage, Uttarkashi
842. 14/EE/M&G/DLR/2023-24 03-12-2023 26-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Wiring of residential Quarters C & E type of hydel colony at Dhalipur Power Station (Dehradun).
843. 13/EE/M&G/DLR/2023-24 03-12-2023 26-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Annual Maintenance Contract ( AMC) for Colony Electrical works at Colony of Dhalipur Power Station, Including Operation & Maintenance of Colony Tube well
844. 12/EE/M&G/DLR/2023-24 03-12-2023 26-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer SITC of HOV to MOV Actuator at Penstock filling valve of Unit A, B & C at Dhalipur Power Station
845. T-06/EE(Solar)/2023-24 30-10-2023 26-12-2023 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Setting-up of 1.5 MW Ground Mounted Grid Connected Solar PV Plants at Gaddha Colony, Hathiyari near Vyasi HEP District- Dehradun, Uttarakhand
846. 05/EE(E&M)/AB/2023-24 02-12-2023 23-12-2023 Dhakrani Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Work of painting on steel structure
847. 04/EE(E&M)/AB/2023-24 02-12-2023 23-12-2023 Dhakrani Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Hiring of 01 nos. non-AC diesel vehicles
848. 45/EE(M)/MB-II/23-24 02-12-2023 23-12-2023 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual General Electrical Maintenance of colony, L.T and H.T lines at Shaktipuram Colony, Chinyalisaur and Dharasu for the year 2023-24
849. 16/EE(E&M)/MB-II/Barrage/2023-24 17-11-2023 23-12-2023 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Level Marking at required places of pond and forebay at Joshiyara Barrage
850. 19/EE(Maint.)/Khodri/2023-24 01-12-2023 22-12-2023 Dehradun Office of Executive Engineer (Maint), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Procurement of Polymeric Gland Ring Segment for Khodri Power Station
851. 16/UJVNL/EE(M&G)/KPS/2023-24 01-12-2023 22-12-2023 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Contract for Operation and cleaning work of 33/11 KV Kulhal Substation, Kulhal
852. 15/UJVNL/EE(M&G)/KPS/2023-24 01-12-2023 22-12-2023 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Fabrication & Erection of 01 No. New draft tube gate at Kulhal Power Station
853. 03/UJVNL/ EE(I&P-II) /2023-24 30-11-2023 22-12-2023 Dehradun Office of the EE(I&P-II), Ujjwal, Maharanibagh, Dehradun EE(I&P-II) Carrying out the survey work for the procurement of river cross-section data of hydroelectric projects on river Yamuna and its tributaries in Uttarakhand
854. 21/EE/PCM-DKP/TN/2023-24 01-12-2023 21-12-2023 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Ichari Dam & its associated structures
855. 20/EE/PCM-DKP/TN/2023-24 01-12-2023 21-12-2023 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Chibro Power House & its associated structures
856. 06/UJVNL/EE(C-SBR)/2023-24 28-11-2023 21-12-2023 Pithoragarh Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh Executive Engineer Running & Maintenance of Gauge & Discharge Site and Silt measurement at of Gori ganga river near Dam/Barrage axis of Sirkari Bhyol Rupsiabagar HEP (120 MW), Munsiyari, Pithoragarh
857. 18e/EE(G)/CPH/2023-24 19-11-2023 21-12-2023 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply of miscellaneous consumables items for Electrical & Generator maintenance at Chibro Power House.
858. 04/EE(GC)/2023-24 20-11-2023 21-12-2023 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Electrical Rewiring of Residences of UJVN Limited Employees and officers at Yamuna Colony Dehradun
859. 14/UJVNL/EE(M&G)/KPS/2023-24 18-11-2023 21-12-2023 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Maintenance Contract of 33kV and 11 kV lines from 33/11kV Substation Kulhal.
860. 13/UJVNL/EE(M&G)/KPS/2023-24 17-11-2023 21-12-2023 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Hiring of one no. (28 seater) School Bus or equivalent for academic year 2023-24 & 2024-25 on contract basis from Hydel Colony Kulhal to Paonta Sahib.
861. 11/Manager(A&S)/2023-24 30-11-2023 20-12-2023 Dehradun Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun Manager Renovation work of additional 04 Nos. rooms of Directors’ Block & eastern side of block for accommodation of operating Staff and other associated civil works for Guest House, at UJJWAL campus, Maharani Bagh, G.M.S. Road, Dehradun
862. 02/UJVNL/ EE(I&P-II) /2023-24 21-11-2023 20-12-2023 Dehradun Office of the EE(I&P-II),”UJJWAL”, Maharanibagh, GMS Road, Dehradun EE(I&P-II) Preparation of Prefeasibility Report for different “Pumped Storage Projects” to be developed near the existing Hydroelectric- Projects (with storage) of UJVNL in Uttarakhand.
863. 13/EE(G)/Chilla/2023-24 28-11-2023 19-12-2023 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Repair & Overhauling of 42.5 MVA, 11/139KV Transformer (BHEL make) of Chilla Power House .
864. 06/EE(E&M)/ICHARI/TN/2023-24 03-11-2023 18-12-2023 Dakpathar Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Re-filling of fire extinguisher installed at Ichari Dam
865. 03/EE(E&M)/ICHARI/TN/2023-24 03-11-2023 18-12-2023 Dakpathar Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Supply and fixing of additional CCTV cameras in the existing CCTV system at Dam premises of Ichari Dam in district Dehradun
866. 10/EE(Test)/DKP/2023-24 23-10-2023 18-12-2023 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Supply and installation of HMI screen on control desk of Unit no. 01 & supply of governor panel spares for Khodri Power
867. 02/UJVNL/ DGM(CD-II)/ Lakhwar /2023-24 20-10-2023 18-12-2023 Dehradun Office of the Dy. GM (CD-II), CD&H, UJVN Limited, Pashulok, Rishikesh, Dehradun Dy. GM Engagement of Project Management Consultant for Lakhwar MPP (300 MW) on River Yamuna in District Dehradun, Uttarakhand.
868. 21/EE(Gen)/Khodri/2023-24 25-11-2023 16-12-2023 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply and Installation of the thermal insulation on generator cooling pipe lines of machine no.1 &4 of Khodri Power station
869. 20/EE(Gen)/Khodri/2023-24 25-11-2023 16-12-2023 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Overhauling of 20 MVA, 33/132 kV NGEF make Transformer.
870. 16/EE(G)/CPH/2023-24 17-11-2023 16-12-2023 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Replacement of damaged PMG Poles of Unit No. 3 at Chibro Power House
871. 18/SPH/2023-24 10-11-2023 16-12-2023 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply, Installation, Testing & Commissioning of CCTV surveillance System at Helipad situated in Sharda Power House Lohiahead premises
872. 14/EE(G)/CPH/2023-24 04-11-2023 16-12-2023 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply & installation of 02 nos water coolers and Comprehensive Annual Maintenance Contract of drinking water coolers including RO at Chibro Power House
873. CH(Maint.)-33/2023-24 30-11-2023 15-12-2023 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Permanent blocking of tappings from penstocks for microhydel Set No # 1 & 2 at Chibro Power Station
874. 20/EE(M)/RPSK/2023-24 23-11-2023 15-12-2023 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Supply & installation of inverter along with batteries and other associated works.
875. T-02/EE(Solar)/2023-24 07-10-2023 15-12-2023 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Setting up of 2.5 MW Canal Bank Grid Connected Solar PV Plants On Yamuna Power Channel Near Bridge No-1, Dakpathar District- Dehradun, Uttarakhand.
876. 31/EEM&G)DKN/2023-24 22-11-2023 14-12-2023 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Repairing of vertical mounting type triple screw governor oil pumps
877. 30/EEM&G)DKN/2023-24 22-11-2023 14-12-2023 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of Dredger Machine with operator for removal of rubbish & sludge from intake
878. 01/DGM(E&M SHP)/Suringad-II/2023-24 20-11-2023 14-12-2023 Pithoragarh Office of the DGM(E&M-SHP), Pithoragarh DGM(E&M-SHP Repair and maintenance of Damaged approach road upto power house of Suringad-II SHP at tehsil Munsyari in district Pithoragarh
879. 15/2023-24/EE(C)/Pashulok Barrage 23-11-2023 13-12-2023 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual Upkeep Works of the Office of General Manager (CDH&NP) at New Hydel Colony, Pashulok-Rishikesh.
880. 14/2023-24/EE(C)/Pashulok Barrage 23-11-2023 13-12-2023 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual Sweeping & Cleaning Works of Maneri Bhali-II Colony, Rishikesh .
881. 13/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 23-11-2023 13-12-2023 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Hiring of One No. Light Non-AC Vehicle (M&M Bolero or Equivalent) without driver on rent basis for the one year months for Office of EE (Civil), UJVN Ltd., Pashulok Barrage, Rishikesh.
882. 11/EE/M&G/DLR/2023-24 22-11-2023 13-12-2023 Executive Engineer Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Procurement of ride on scrubber drier Dhalipur Power Station
883. 10/EE/M&G/DLR/2023-24 22-11-2023 13-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Supply installation testing and commissioning of Aluminum Ventilation (24”) at central stores of Dhalipur power station
884. 09/EE/M&G/DLR/2023-24 22-11-2023 13-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Refurbishment of dewatering pits - 02 Nos of Dhalipur Power Station
885. 08/EE/M&G/DLR/2023-24 22-11-2023 13-12-2023 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer SITC of 110V/165AH VRLA battery Bank at Dhalipur Power Station
886. 05/EE(G)/2023-24 10-11-2023 13-12-2023 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer SITC of high quality CCTV cameras with all accessories at Tiloth Power House, Uttarkashi.
887. 43/EE(M)/MB-II/23-24 20-11-2023 12-12-2023 Chinyalisaur The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of One No. (6+1) Seater (Mahindra/Tata/equivalent) non A.C. Diesel vehicle along with driver.
888. 44/EE(M)/MB-II/23-24 20-11-2023 12-12-2023 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Disc Spring Washer for Spherical Valve at Dharasu Power House, MB-II, Uttarkashi.
889. 09/EE (E&M)/(SHP)/Rishikesh/2023-24 11-11-2023 12-12-2023 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Repair and maintenance of Unit-1 Machine at Pilangad SHP (2 X 1125 kW) in distt. Uttarkashi
890. 08/EE (E&M)/(SHP)/Rishikesh/2023-24 11-11-2023 12-12-2023 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Modification & Reverse Engineering for Design, Detail Engineering, Manufacturing, Factory Testing, Supply, Transportation, Shifting, Erection, Testing & Commissioning of Switchyard equipments of 33kV Marwari Substation, Joshimath, District Chamoli Uttrakhand
891. 12/EE(E&M)(SHP)/Rishikesh/2023-24 11-11-2023 12-12-2023 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Servicing of Vacuum Circuit Breakers (11 kV) at RPN SHP (2x750 kW), Dunao in District Pauri Garhwal.
892. 11/EE(E&M)(SHP)/Rishikesh/2023-24 11-11-2023 12-12-2023 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Design, Manufacturing, Transportation & Supply of Dummy Plate/Bulkhead Gate for MIV, Penstock Drain Valve & Bypass Valve at Ram Prasad Nautiyal SHP (2x750 kW), Dunao in District Pauri Garhwal, Uttarakhand.
893. 10/EE(E&M)(SHP)/Rishikesh/2023-24 11-11-2023 12-12-2023 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Design, Supply, Installation, Commissioning and Testing for additional cooling water system including replacement of pipe and fitting of Urgam SHP (2x1500 kW) in District Chamoli Uttarakhand.
894. 36/EE(Pathri)/2023-24 20-11-2023 11-12-2023 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer 1.Supply of various types of electrical items at Pathri Power House.
895. 08 EE(Test)/GV/2023-24 18-11-2023 11-12-2023 Haridwar Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar Executive Engineer Routine maintenance & testing related activities for Chilla, Pathri&Mohammadpur power houses under Ganga Valley Haridwar
896. 15e/EE(G)/CPH/2023-24 11-11-2023 11-12-2023 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply, installation, testing and commissioning of 220 KV XLPE Armoured Power Cable with all accessories including dismantling of the existing 220 KV Oil Filled Cable at 4X60 MW Chibro Power House
897. 01/EE(Solar)/2023-24 01-11-2023 11-12-2023 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Annual Maintenance of various Roof Top Solar PV Plants of UJVNL Ltd
898. 02/EE(Civil)/KB/2023-24 01-11-2023 11-12-2023 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Hiring of one number vehicle such as Swift Dzire, Amaze or equivalent (excluding fuel) with driver for Dy. Chief Account Officer, Lakhwar Multipurpose Project, Dakpathar, Dehradun
899. 01/EE(Civil)/KB/2023-24 01-11-2023 11-12-2023 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Hiring of one number diesel vehicle such as Mahindra bolero or equivalent (excluding fuel) along with driver for Katapathar Barrage, Dakpathar, Dehradun
900. 05/EE(Test)/DKN/2023-24 10-11-2023 10-12-2023 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Strengthening of existing protection system by retrofitting of numerical relays, provisioning of reverse power protection, trip circuit supervision and LBB protection at Kulhal Powerhouse
901. 06/EE(IC&CM)/2023-24 18-11-2023 09-12-2023 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun, Executive Engineer Supply of CTs and PTs for different power houses/sites of UJVN Ltd.
902. 17/EE(G)/CPH/2023-24 17-11-2023 08-12-2023 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Replacement of damaged PIT heaters for Stator winding of 60MW Hydro Generators U# 3&4 at Chibro power house
903. 08/EE(E&M)/Vyasi Dam/2023-24 17-11-2023 08-12-2023 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Disposing of animal’s dead body etc from reservoir at Vyasi Dam, Juddo Dakpatthar (Dehradun)
904. 15/EE(E&M)/MB-II/Barrage/2023-24 17-11-2023 08-12-2023 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Procurement of Nut bolts and other items at Joshiyara barrage Uttarkashi
905. 17/EE-II (E&M-LWR)/LP/2023-24 21-11-2023 07-12-2023 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer SITC of LED Board, Main Gate & Store repair work at 33/11 kV Substation Lakhwar Kaldriyan, Nain Bagh, Tehri Garhwal
906. 05/EE(E&M)/ICHARI/TN/2023-24 03-11-2023 07-12-2023 Dakpathar Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Painting works on various steel structures of Ichari Dam in District Dehradun
907. 04/EE(E&M)/ICHARI/TN/2023-24 03-11-2023 07-12-2023 Dakpathar Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) Executive Engineer Supply and fixing of miscellaneous electrical items including supply of spares for Ichari Dam in District Dehradun
908. 07/EE(IC&CM)/2022-23 25-10-2023 07-12-2023 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE(IC&CM) Supply of Lighting Arrestor for various Power Houses/Sites of UJVN Ltd
909. 29/EEM&G)DKN/2023-24 21-11-2023 06-12-2023 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Arresting of oil leakage from 2 Nos. 132/33 KV 40 MVA Transformers at 132/33 kV Switchyard.
910. CH(Maint.)-32/2023-24 15-11-2023 06-12-2023 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Fixing of various valves of Machine # 4 at Chibro Power Station.
911. 20/SPH/2023-24 10-11-2023 05-12-2023 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, of Unit 3 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead as per technical specifications
912. 19/SPH/2023-24 10-11-2023 05-12-2023 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply, Installation, Testing & Commissioning of 62.5 KVA D.G. set with AMF panel in learning centre of Sharda Power House Lohiahead
913. 11/EE(Civil-I)/Srikot/2023-24 09-11-2023 05-12-2023 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Maintenance and Repair work of UJVNL Office Building at kund, Guptkashi in district-Rudraprayag
914. 07/EE(Test)/DKP/2023-24 23-10-2023 05-12-2023 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpatha Executive Engineer Retrofitting of Turbine Gauge Panel with Static Relay and SCADA compatibility for Units-3 and spares of TG panels at Chibro Power House.
915. 19/EE(M)/RPSK/2023-24 11-11-2023 01-12-2023 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual Maintenance Contract for electrical works at residential and nonresidential buildings of UJVN limited, Kalagarh in Distt. Pauri Garhwal.
916. 18/EE(M)/RPSK/2023-24 09-11-2023 01-12-2023 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Procurement of filter elements for Microprocessor Based Governing System.
917. 01/EE-I(E&M Design-II)/2023-24 09-11-2023 01-12-2023 Dehradun Office of the Executive Engineer-I(E&M Design-II), Ganga Bhawan, Dehradun Executive Engineer-I Painting/repairing of various Almirah at Central library and E&M design office at Ganga Bhawan, Dehradun
918. 10/EE (Civil-III)/LMP/2023-24 11-11-2023 30-11-2023 Dakpathar Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Construction of Public Toilet for project affected villagers of vill-Kwaansha at Kalsi block, Dehradun Of LMPP
919. 01/UJVNL/ DGM(Civil)/PITH/SBR /2023-24 12-09-2023 30-11-2023 Pithoragarh Office of the Dy General Manager (Civil), UJVN Limited, Munsiyari, Pithoragarh Dy General Manager Consultancy Services for Detailed Civil Design and Engineering including Project Monitoring & Quality Control of Sirkari Bhyol Rupsiabagar Hydro Electric Project (3x40MW =120MW) on River Goriganga in District Pithoragarh, Uttarakhand
920. 09/EE (Civil-III)/LMP/2023-24 09-11-2023 29-11-2023 Dakpathar Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Construction of level pillars for demarcation of reservoir at Lakhwar MPP Distt. Dehradun/ Tehri Garhwal Uttarakhand
921. 04/EE (G)/TPH/2023-24 08-11-2023 29-11-2023 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual Contract for Gardening, Plantation & other associated miscellaneous works at Tiloth Power House, Uttarkashi
922. 03/EE (G)/TPH/2023-24 08-11-2023 29-11-2023 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual contract for General Cleaning and up keeping of Tiloth Power House, Uttarkashi.
923. 11/EE(Test)/DKP/2023-24 23-10-2023 29-11-2023 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Arrangement for Breaker failure Protection for all 220KV bays of Generating units at Khodri Power Station.
924. 20/EEM/2023-24 20-11-2023 28-11-2023 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer SITC of 200 Ton Crane Capacity Hook at Chilla Power House.
925. 15/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 07-11-2023 28-11-2023 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Renovation of 10 Nos. garages and approach roads in Type - III residences at Hydel colony Kalagarh
926. 14/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 07-11-2023 28-11-2023 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Non Residential Buildings at Kalagarh.
927. CH (Maint.)- 31/2023-24 06-11-2023 28-11-2023 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Cleaning of D&D pits, clean water tank, and miscellaneous work at Chibro Power Station
928. CH (Maint.)- 30/2023-24 06-11-2023 28-11-2023 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Servicing & Maintenance of 15 Ton Draft Tube Gantry Crane at Chibro Power Station.
929. 12/EE(E&M)/MB-II/Barrage/2023-24 25-09-2023 28-11-2023 Uttarkashi The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Sealing of gates of Joshiyara Barrage with caulking material by under water diving team
930. 41/EE(M)/MB-II/23-24 06-11-2023 27-11-2023 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Rewiring in residential/ non-residential buildings at Shaktipuram Colony, Chinyalisaur
931. 10/EE(M)/2023-24 25-10-2023 27-11-2023 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Testing of various equipments and pressure vessels of Tiloth Power House
932. 08/EE(E&M-SHP)/Madhyamaheshwar/2023-24 31-10-2023 26-11-2023 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi, Executive Engineer Reconductoring of Dog conductor to AL-59 Panther conductor of 33kV transmission line from Madhyamaheshwar SHP to 33kV Ukhimath S/s in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
933. 21/SPH/2023-24 18-11-2023 25-11-2023 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Repair and maintenance of 09 nos intake gates and 08 nos bypass gates along with supply and installation of the brake coil assembly, overhauling of cooling water system and other miscellaneous work” at Sharda Power House, Lohiahead
934. 33/EE(Pathri)/2023-24 02-11-2023 25-11-2023 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Refilling & Repairing of various types of Fire Extinguishers and Procurement of different types of new Fire Extinguishers for Pathri Power House
935. 17/SPH/2023-24 21-10-2023 25-11-2023 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, replacement of 07 nos. shutter vane servomotor seal kit, dismantling of turbine guide bearing of Unit 2 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead
936. 11/2023-24/EE(C)/Pashulok Barrage 22-10-2023 25-11-2023 Rishikesh UJVN Ltd , Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Operation and Maintenance of UJVNL Officer Transit Camp and Office of General Manager (SHP) at Maneri Bhali-II Colony, Rishikesh.
937. 16/EE(M)/RPSK/2023-24 11-10-2023 25-11-2023 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for EE(G).
938. 15/EE(M)/RPSK/2023-24 07-10-2023 25-11-2023 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months.
939. 05/EE(E&M)/DKP BRG/2023-24 04-11-2023 24-11-2023 Dakpathar Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Up keeping & Maintaining of Inspection House for a period of twelve months at Dakpathar District- Dehradun.
940. 15/EE(E&M-II)/LP/2023-24 02-11-2023 24-11-2023 Dakpathar Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun Executive Engineer Annual operation and Maintenance contract of various 33/11 kV substation and 11 kV lines of Lakhwar MPP for the period of 12 months.
941. 11/2023-24/EE(C-M)Vyasi Project 03-11-2023 23-11-2023 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Protection work at D/S of plunge pool at left bank of Vyasi Dam (Ch 230.00M to 290.00M D/S) Near Motor Bridge at Juddo,Distt Dehradun
942. 12/EE(CM)/DDN/2023-24 02-11-2023 23-11-2023