Tender Archieve
 

S.No Click Here To Download NIT Uploading Date Closing Date Circle Address Classification Description Corrigendum /
Downloads
1. 33/EE(Pathri)/2024-25 18-12-2024 08-01-2025 Hardwar Executive Engineer (M&G) Others Supply of various types of Furniture at Pathri Power House
2. 06/EE(Civil-I)/KG-II/2024-25 13-12-2024 08-01-2025 Small Hydro Project Executive Engineer (Civil-I) Srinagar, Pauri Garhwal Others Protection work at Penstock area and Power House site at Kaliganga-II SHP (2x2.25) MW in District- Rudraprayag
3. 17/EE/PCM-DKP/TN/2024-25 09-12-2024 07-01-2025 Dakpathar Executive Engineer Project Civil Maintenance - Dakpathar Others Protection work related to water clean/cooling tank of Chibro Power Station and Saradi Khad at Chibro, Dehradun Corrigendum 1 Corrigendum 2
4. 19/EE(Civil)/MB-I/TN/2024-25 09-12-2024 07-01-2025 Uttarkashi Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi Others Safe closure of adits, tunnels, surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi Corrigendum 1
5. 18/EE(Civil)/MB-I/TN/2024-25 09-12-2024 07-01-2025 Uttarkashi Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi Others Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of LoharinagPala HEP (600 MW) discontinued in district Uttarkashi Corrigendum 1
6. 17/EE(Civil)/MB-I/TN/2024-25 09-12-2024 07-01-2025 Uttarkashi Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi Others Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site ofLoharinag-Pala HEP (600 MW) discontinued in district Uttarkashi Corrigendum 1
7. 27/EE(MPH)/2024-25 22-12-2024 06-01-2025 Hardwar Executive Engineer (M&G)Mohammadpur, Gurukul Narsan Others Providing of 15.0 Mbps Internet Leased Line Services with static IP at Mohammadpur Power House
8. 07/EE(E&M-SHP)/MM SHP/2024-25 11-12-2024 06-01-2025 Small Hydro Project Executive Engineer, (E&M-SHP), UJVNL, Kund (Guptkashi) Others Annual cleaning, up keeping and gardening of the entire area of Madhyamaheshwar SHP Powerhouse Building and other associated areas situated in Tehsil Ukhimath, District Rudraprayag
9. 22/EE(GEN)/MB-II/2024-25 12-12-2024 04-01-2025 Chinyalisaur EE-Generation Others Procurement of miscellaneous general consumable and Safety items at MB-II, Dharasu Power House
10. 20/EE/PCM/Dhalipur/2024-25 10-12-2024 04-01-2025 Dehradun Executive Engineer, PCM-Dhalipur Others General Cleaning, upkeeping, park and plantation work of Dhakrani Power House Colony at Dhakrani, Dehradun
11. 15/2024-25/EE(C-M)Vyasi Project 20-12-2024 03-01-2025 Dakpathar Executive Engineer Project Civil Maintenance - Dakpathar Others Construction of Play Ground at Village Farsil in Gram Panchayat Bhaler, Tehsil - Vikasnagar, Dehradun
12. 17/EE(M)/RPSK/2024-25 13-12-2024 03-01-2025 Kalagarh E.E.-Maintenance Others Electrical rewiring at residential and non-residential buildings
13. 34/EE(M)/MB-II/2024-25 13-12-2024 03-01-2025 Chinyalisaur EE-Maintenance Others Annual General Electrical Maintenance of colony, L.T and H.T lines at Shaktipuram Colony, Chinyalisaur and Dharasu for the year 2024-25
14. 33/EE(M)/MB-II/2024-25 13-12-2024 03-01-2025 Chinyalisaur EE-Maintenance Others Electrical wiring works in Saraswati Vidhya Mandir Inter College, Shaktipuram Colony, Chinyalisaur
15. 03/EE(Civil)/SHP/Maneri/2024-25 10-12-2024 02-01-2025 Uttarkashi Executive Engineer(Civil)/SHP/Maneri Others Construction of Play Ground and its Protection work of Govt. Primary School at Pilang Village in Bhatwari Distt- Uttarkashi
16. 18/EE(G)/CPH/2024-25 10-12-2024 02-01-2025 Dakpathar E.E.-Generation Chibhro Others Hiring the 1 No. Non AC vehicle (Bolero or equivalent) along with driver for Executive Engineer (Gen), Chibro Power House” through open tender
17. 27/EE (M)/MB-II/2024-25 29-11-2024 02-01-2025 Chinyalisaur EE-Maintenance Others Procurement of Dial Type Temperature (DTT) Detector at Dharasu Power House, Uttarkash Corrigendum 1
18. 17/EE(Gen)/Khodri/2024-25 27-11-2024 02-01-2025 Dakpathar Executive Engineer (Generation) Others Annual Contract for O&M works of Khodri Power Station Corrigendum 1
19. 01/UJVNL/DGM(E&M-SHP)/Pithoragarh/2024-25 15-11-2024 01-01-2025 Pithoragarh DGM (E&M-SHP) Pithoragarh Others Consultancy Services for review of project alignment and updating of DPR with project cost at current price level of Tankul SHP (4X3 MW) on river Shymkholagad at Tehsil Dharchula in District Pithoragarh, Uttarakhand Corrigendum 1 Corrigendum 2
20. 14/2024-25/EE(C-M)Vyasi Project 18-12-2024 31-12-2024 Dakpathar Executive Engineer Project Civil Maintenance - Dakpathar Others River Training work in D/s of Hathiyari Power House of Vyasi HEP in Dist.- Dehradun
21. 05/EE(E&M)/Maneri Dam/2024-25 09-12-2024 31-12-2024 Uttarkashi Executive Engineer (E&M) SHP, UJVN Ltd., Maneri, Uttarkashi Others SITC of 1.5 HP submersible pump and detachable canopy for rope drum hoist mechanism at Maneri Dam
22. 03/EE(E&M)/Maneri Dam/2024-25 09-12-2024 31-12-2024 Uttarkashi Executive Engineer (E&M) SHP, UJVN Ltd., Maneri, Uttarkashi Others SITC of 16 m High Mast at Maneri Dam
23. 08/EE(Civil-III)/LMP/2024-25 10-12-2024 30-12-2024 Dakpathar Executive Engineer (Civil), Lakhwar Multipurpose Project Others Construction of Toilet at Barat Ghar situated in Lakhwar affected village Bel, ParogiNainbagh, Tehri Garhwal
24. 03EE(Test)/GV/2024-25 09-12-2024 30-12-2024 Hardwar Executive Engineer Test Ganga Velly Mayapur Haridwar Others Calibration of Testing Instruments and Panel Meters of Power Houses under Ganga Valley Haridwar
25. 31/EE(M)/MB-II/24-25 07-12-2024 30-12-2024 Chinyalisaur EE-Maintenance Others Servicing of Turbine Oil Centrifuging Machines at Dharasu Power House, MB-II, Uttarkashi
26. 30/EE(M)/MB-II/2024-25 07-12-2024 30-12-2024 Chinyalisaur EE-Maintenance Others Repair of different T&P items at Dharasu Power House, Uttarkashi
27. 29/EE(M)/MB-II/2024-25 07-12-2024 30-12-2024 Chinyalisaur EE-Maintenance Others Refurbishment of eight numbers Draft Tube Gates at Dharasu Power House, MB-II Uttarkashi
28. 19/EE/PCM/Dhalipur/2024-25 05-12-2024 30-12-2024 Dehradun Executive Engineer, PCM-Dhalipur Others M&R of Asan Barrage and other appurtenant structures at Dhalipur, Dehradun
29. 13/EE(GC)/2024-25 04-12-2024 30-12-2024 Dehradun EE(Galogi Complex) Ganga Bhawan Yamuna Colony Others Repair of servo motor & associated E&M work of Unit -3 and Unit-4 at Galogi SHP, Dehradun
30. 08/EE(Test)/DKP/2024-25 16-11-2024 30-12-2024 Dakpathar Executive Engineer, Test , UJVN Ltd, Vidyut Bhawan, Dakpathar, Dehradun-248125 Others Supply, Installation, Testing and Commissioning of 01 set, lead Acid Plante Battery Bank of 220 V DC/ 300 AH Capacity and 02 no, 440 V AC to 220 V DC (80 A), FCBC Battery charger, after dismantling of old battery bank and chargers at Khodri Power Station Corrigendum 1 Corrigendum 2
31. CH(Maint.)-28/2024-25 06-12-2024 28-12-2024 Dakpathar E.E.-Maintenance Chibhro Others Annual running & up-keeping work of clean water supply to shaft gland of 60 MW turbine at Chibro Power Station
32. CH(Maint.)-27/2024-25 06-12-2024 28-12-2024 Dakpathar E.E.-Maintenance Chibhro Others Annual up-keeping and maintenance of Chibro field hostel for year 2024-25
33. 04/EE(Civil-I)/KG-I/2024-25 29-11-2024 28-12-2024 Small Hydro Project Executive Engineer (Civil-I) Guptkashi, Rudraprayag Others Annual Repair & Maintenance work of Civil structures at Kaliganga-I SHP (2x2 MW) in Distt- Rudraprayag Corrigendum 1
34. 10/EE(CM)/DDN/2024-25 12-12-2024 27-12-2024 Dehradun Executive Engineer(Civil Maint.) Others Housekeeping Service for New Corporate Office Building for the year 2024-25 ,Ujjawal,Maharani Bagh, Dehradun
35. 11/2024-25/EE/PCM(GV)/Mayapur 03-12-2024 27-12-2024 Hardwar Executive Engineer Project Civil Maintenance(GV), Mayapur Others Annual Sweeping & Cleaning Work of Chilla Colony for the year 2024-25
36. 20/EE(Maint.)/Khodri/2024-25 26-11-2024 27-12-2024 Dakpathar E.E.-Maintenance Khodri Others Hiring of man power for Mechanical auxiliary section & Central store of Khodri Power house Corrigendum 1
37. 12/SPH/2024-25 15-11-2024 26-12-2024 Lohiahead Executive Engineer, Maint. & Generation Others Procurement of various clamps and connectors for 33 KV switchyard" of Sharda Power House, Lohiahead. Corrigendum 1 Corrigendum 2
38. 07/EE(E&M-II)/LP/2024-25 03-12-2024 24-12-2024 Dakpathar Executive Engineer (E&M-II) Others Supply & Construction of 11 KV feeder from Lakhwar Substation to Dam Top of Lakhwar MPP
39. 12/EE(Generation)/Vyasi/2024-25 03-12-2024 24-12-2024 Dakpathar Executive Engineer (Generation) Others Annual Contract for Operation and Routine Electrical Maintenance works at Vyasi Power Station
40. 18/EE/PCM/Dhalipur/ 2024-25 02-12-2024 23-12-2024 Dhalipur Executive Engineer (PCM ), Dhalipur Others M&R works of Dhalipur Power House at Dhalipur, Dehradun
41. 17/EE/PCM/Dhalipur/ 2024-25 02-12-2024 23-12-2024 Dhalipur Executive Engineer (PCM ), Dhalipur Others M&R works of Dhakrani Power House Colony at Dhakrani Dehradun
42. 16/EE/PCM/Dhalipur/ 2024-25 02-12-2024 23-12-2024 Dhalipur Executive Engineer (PCM ), Dhalipur Others M&R works of Dhakrani Power House at Dhakrani Dehradun
43. 11/EE(Generation)/Vyasi/2024-25 02-12-2024 23-12-2024 Dakpathar Executive Engineer (Generation) Others Annual Maintenance work of 60MW Generator and associated equipment of Unit # 1 & 2 of Vyasi Power Station (2 x 60MW), Hathiyari
44. 16/EE(M)/VP/2024-25 30-11-2024 21-12-2024 Hathiyari E.E.-Maintenance Others Replacement of Rubber seals of Top, bottom, and both -24 sides of Draft tube gate (04 No) at Vyasi Power House, Hathiyari
45. 14/EE(M)/VP/2024-25 30-11-2024 21-12-2024 Hathiyari E.E.-Maintenance Others /VP/2023 Name of work.: - Annual maintenance work of turbine and its accessories -24 equipment’s of Unit-1 & 2 of Vyasi Project, Hathiyari
46. 15/EE(M)/Vyasi/24-25 30-11-2024 21-12-2024 Dakpathar E.E.-Maintenance Others Supply of various mechanical seals for Vyasi Power House, Hathiyari, Dehradun
47. 16/UJVNL/EE (M&G)/KPS/2024-25 30-11-2024 21-12-2024 Kulhal E.E.-Maintenance - Generation Others Extension of Bay at 132kV switchyard at Kulhal Power station
48. 02/EE(C&T)SPH/2024-25 30-11-2024 21-12-2024 Lohiahead EE -Lohia head Others Hiring of 01 No diesel driven vehicle (Mahindra Bolero or equivalent model 2021 or later) along with services of driver for a period of one year for departmental use under Dy. General Manager, HGC, Lohiahead, Khatima
49. 01/EE(C&T)SPH/2024-25 30-11-2024 21-12-2024 Lohiahead EE -Lohia head Others Hiring of 01 No. 31 seated school bus Model 2022 or later with driver and conductor for one calendar year for Sharda Power House, Lohiahead, Khatima
50. 02/UJVNL/EE(I&P-II)/2024-25 25-11-2024 21-12-2024 Dehradun Executive Engineer (I&P-II) Others Providing Consultancy Servicesand Preparation of Comprehensive and Bankable Detailed Project Report of Lakhwar-Vysi PSP (300 MW) and Vyasi-Katapathar PSP (150MW) located in District Dehradun of Uttarakhand
51. 26/EE(M)/MB-II/24-25 29-11-2024 20-12-2024 Chinyalisaur EE-Maintenance Others Protective anti stick coating on Runner for 76 MW Turbine at Dharasu Power House M.B -II Uttarkashi
52. 23/EEM&G)DKN/2024-25 28-11-2024 20-12-2024 Dhakrani E.E.-Maintenance& Generation Others Supply, Installation, Testing & Commissioning (SITC) of EPABX for Offices at Jal Shakti Bhawan Dhakrani
53. 22/EEM&G)DKN/2024-25 28-11-2024 20-12-2024 Dhakrani E.E.-Maintenance& Generation Others Refurbishment of 11 KV line of Dhakrani Power House Colony
54. 28/EE(M)/MB-II/24-25 29-11-2024 20-12-2024 Chinyalisaur EE-Maintenance Others Engagement of Underwater Diving Team for under water works at Dharasu power House
55. 13/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 28-11-2024 20-12-2024 Kalagarh Executive Engineer(Civil) Kalagarh Others Repair and Reconstruction Work of drains in Type-Ist residential area at Hydel Colony Kalagarh
56. 09/EE(CM)/DDN/2024-25 04-12-2024 19-12-2024 Dehradun Executive Engineer(Civil Maint.) Others Housekeeping Service for New Corporate Office Building for the year 2024-25 ,Ujjawal,Maharani Bagh, Dehradun
57. 15/EE(M)/2024-25 27-11-2024 19-12-2024 Uttarkashi EE-Maintenance Tiloth Others Hiring of 02 nos. non AC diesel vehicles
58. 30/EE(Civil)/MB-II/Chinyalisaur/2024-25 19-11-2024 19-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Annual Operation & Maintenance of water treatment plant, pump house including pump and electrical fittings, Nagungad water supply line/head works of Shaktipruam colony MB- II at Chinyalisaur, Uttarkashi Corrigendum 1
59. 07/EE(E&M)/Ichari dam/2024-25 27-11-2024 18-12-2024 Dakpathar Executive Engineer (E/M) Others Underwater videography of underwater parts of Tunnel control structure gate of Ichari dam
60. 06/EE(E&M)/Ichari dam/2024-25 27-11-2024 18-12-2024 Dakpathar Executive Engineer (E/M) Others Overhauling and rubber seal replacement of F.C gate of Ichari dam
61. 05/EE(E&M)/Ichari dam/2024-25 27-11-2024 18-12-2024 Dakpathar Executive Engineer (E/M) Others Hiring of one number non AC diesel vehicle (6+1 seater) such as Mahindra Bolero or equivalent with driver (Excluding cost of fuel) for one year for Emergency & Shift duty in Ichari Dam
62. 04/EE(E&M)/Ichari dam/2024-25 27-11-2024 18-12-2024 Dakpathar Executive Engineer (E/M) Others Hiring of 01 No. Non-AC diesel vehicle (6+1 Seater) such as Mahindra bolero or equivalent with driver (Excluding cost of Fual) for one year Corrigendum 1
63. 13/2024-25/EE(C-M)Vyasi Project 03-12-2024 17-12-2024 Dakpathar Executive Engineer Project Civil Maintenance - Dakpathar Others Providing & Installation of Rock fall Barrier & Slope stabilization work on hill slope behind Intake Structure/ Control Room at Dam site of Vyasi HEP
64. 33/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 26-11-2024 17-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Providing and fixing of bamboo jaffery at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi
65. 32/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 26-11-2024 17-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Refurbishment of 04 No Semi VIP rooms of Officer's field hostel, Shaktipuram colony, MB-II, Chinyalisaur, Uttarkash
66. 31/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 26-11-2024 17-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Providing services for removing of debris and various civil works at Plant store & Shaktipuram Colony, MB-II, Chinyalisaur, Uttarkashi
67. 07/ EE(E&M)/ AB/ (2024-25) 27-11-2024 17-12-2024 Dhakrani Executive Engineer (E&M), Asan Barrage Others Hiring of 01 nos. non-AC diesel vehicle along with Driver for EE (E&M), Asan Barrage, Dhalipur for a period of one year
68. 19/EE(Maint.)/Khodri/2024-25 26-11-2024 16-12-2024 Dakpathar E.E.-Maintenance Khodri Others Supply & replacement of rubber seal of Draft tube gates of Khodri power station
69. 18/EE(Maint.)/Khodri/2024-25 26-11-2024 16-12-2024 Dakpathar E.E.-Maintenance Khodri Others Fabrication of Tin Shed at Surge Tank of Khodri Power station
70. 10/EE(E&M)/DKP BRG/2024-25 25-11-2024 16-12-2024 Dakpathar Executive Engineer (E/M) Others Up-keeping & Maintaining of Inspection House for a period of twelve months at Dakpathar, District- Dehradun
71. 10/EE(Generation)/Vyasi/2024-25 26-11-2024 16-12-2024 Dakpathar Executive Engineer (Generation) Others Supply, Installation, Testing, Commissioning of LGB Pit access doors for Vyasi HEP (2x60 MW)
72. 17/EE(G)/CPH/2024-25 24-11-2024 14-12-2024 Dakpathar E.E.-Generation Chibhro Others Annual maintenance of the coolers, valves & pumps of 69 MVA Generator Transformers of Unit- 1 & 2 and replacement of hydrant pipe line at Chibro Powerhouse
73. 16/EE(M)/RPSK/2024-25 22-11-2024 13-12-2024 Kalagarh E.E.-Maintenance Others Design, fabrication, supply, installation, testing & commissioning of High speed lubricating system with modification and re-babbitting of 08 nos of thrust bearing pads of unit#1 and 2
74. 16/EE(G)/CPH/2024-25 22-11-2024 13-12-2024 Chibro Executive Engineer (Generation) Others Rewinding of 11/0.44kV, 100kVA transformer and repairing of 33/11kV, 1.5 MVA Transformers & miscellaneous work at Chibro Sub Station
75. 15/EE(G)/CPH/2024-25 22-11-2024 13-12-2024 Chibro Executive Engineer (Generation) Others Supply of spare parts & preventive/breakdown maintenance work of 220kV switchyard at Chibro Power house
76. 14/EE(G)/CPH/2024-25 22-11-2024 13-12-2024 Chibro Executive Engineer (Generation) Others Renovation & Upgradation of Oil Level Indicators with all accessories for 4X60MW Generators at Chibro Power House
77. 13/EE(G)/CPH/2024-25 22-11-2024 13-12-2024 Chibro Executive Engineer (Generation) Others Replacement of damaged PIT heaters including control panel & wiring for 60 MW hydro generator of unit-1 & 2 at Chibro Power House
78. 09/EE(GC)/2024-25 19-11-2024 13-12-2024 Dehradun Executive Engineer (GC) UJVNL Others Electrical rewiring of different residential quarters of UJVN Ltd at Yamuna Colony, Dehradun
79. 09/EE(Test)/DKP/2024-25 21-11-2024 12-12-2024 Dakpathar Executive Engineer, Test , UJVN Ltd, Vidyut Bhawan, Dakpathar, Dehradun-248125 Others Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels for Unit No. 2 at Chibro Power Station
80. 10/2024-25/EE/PCM(GV)/Mayapur 21-11-2024 12-12-2024 Hardwar Executive Engineer Project Civil Maintenance(GV), Mayapur Others Works related to Roof Leakage & Damp Proofing of Class Rooms of Inter College at Motadhak, Kotdwar
81. 09/EE(E&M)/DKP BRG/2024-25 20-11-2024 12-12-2024 Dakpathar Executive Engineer (E/M) Others Repairing & Overhauling of Hoist Mechanism of Barrage Gate No. 18 of Dakpathar Barrage
82. 16/EE(Gen)/Khodri/2024-25 21-11-2024 11-12-2024 Dakpathar Executive Engineer (Generation) Others Annual Contract for Cleaning & Up keeping at switchyard of Khodri Power Station
83. 12/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 20-11-2024 11-12-2024 Kalagarh Executive Engineer(Civil) Kalagarh Others Miscellaneous Civil Repair & Maintenance Work at Central Store Kalagarh
84. 11/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 20-11-2024 11-12-2024 Kalagarh Executive Engineer(Civil) Kalagarh Others Annual M&R Work of Non Residential Buildings at Kalagarh
85. 15/EE(Gen)/Khodri/2024-25 20-11-2024 10-12-2024 Dakpathar Executive Engineer (Generation) Others Annual Maintenance Contract (AMC) of CCTV surveillance system installed at Khodri Power Station
86. 14/EE(Gen)/Khodri/2024-25 20-11-2024 10-12-2024 Dakpathar Executive Engineer (Generation) Others Printing of various Logbooks & procurement of stationary items for Generation Section at Khodri Power Station
87. 18/EE(GEN)/MB-II/2024-25 18-11-2024 10-12-2024 Chinyalisaur EE-Generation Others Providing and Fixing of 48V, 3.6 KVA inverters at MB-II, Dharasu Power House
88. 17/EE(GEN)/MB-II/2024-25 18-11-2024 10-12-2024 Chinyalisaur EE-Generation Others Repairing and overhauling of different valves of Generator cooling system, MB-II, DharasuPower House
89. 16/EE(GEN)/MB-II/2024-25 18-11-2024 10-12-2024 Chinyalisaur EE-Generation Others Repairing and overhauling of main hydrant vt pump at DharasuPower House, MB-II, Uttarkashi
90. 15/EE(GEN)/MB-II/2024-25 18-11-2024 10-12-2024 Chinyalisaur EE-Generation Others Re-filling and hydraulic testing of different type and capacity of Fire extinguisher cylinders at MB-II, Dharasu Power House
91. 16/EE/PCM-DKP/TN/2024-25 18-11-2024 10-12-2024 Dakpathar Executive Engineer Project Civil Maintenance - Dakpathar Others Renovation of Lord Shilgur Maharaj Public School at Koti, Dehradun
92. E-CH(Maint.)-26/2024-25 08-11-2024 10-12-2024 Dakpathar E.E.-Maintenance Chibhro Others SITC of Governor oil online filtration system for all four Units of Chibro Power Station Corrigendum 1
93. 24/EE(M&G)/MPH/2024-25 22-11-2024 07-12-2024 Hardwar Executive Engineer (M&G)Mohammadpur, Gurukul Narsan Electrical and Mechanical Annual Maintenance of CCTV Surveillance System at Mohammadpur Power House
94. 29/EE(Civil)/MB-II/Chinyalisaur/2024-25 15-11-2024 07-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Development of Volleyball ground and other associated works at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi
95. 28/EE(Civil)/MB-II/Chinyalisaur/2024-25 15-11-2024 07-12-2024 Chinyalisaur E.E (Civil) Chinyalisaur Others Annual supply of Stationary items at the office of EE (Civil), MB-II, Chinyalisaur, Utttarkashi
96. 07/EE(Test)/DKP/2024-25 15-11-2024 07-12-2024 Dakpathar Executive Engineer, Test , UJVN Ltd, Vidyut Bhawan, Dakpathar, Dehradun-248125 Others Arrangement of 220V DC redundant supply for all generation units and 220 kV inter-statefeeders in 220 kV Switchyard of Khodri Power Station
97. 20/EEM&G)DKN/2024-25 14-11-2024 06-12-2024 Dhakrani E.E.-Maintenance& Generation Others Repair & overhauling of bowl assemblies of dewatering pumps
98. 19/EEM&G)DKN/2024-25 14-11-2024 06-12-2024 Dhakrani E.E.-Maintenance& Generation Others Repair & overhauling of Trash rack Cleaning Machine (TRCM) of Dhakrani Power Station
99. e-02/UJVNL/EE(IT)/2024-25 14-11-2024 05-12-2024 Dehradun EE (IT), UJVNL Others Development of e-FMS Solution
100. 27/EE(Civil)/MB-II/Chinyalisaur/2024-25 08-11-2024 05-12-2024 Chinyalisaur Executive Engineer, (Civil), MB-II UJVNL Chinyalisaur, Uttarkashi (Uttarakhand) Civil Covering/safety by structural steel fencing of water storage tank in CP type block / quaters at shaktipuram colony, MB-II, chinyalisaur, uttarkashi
101. 26/EE(Civil)/MB-II/Chinyalisaur/2024-25 08-11-2024 05-12-2024 Chinyalisaur Executive Engineer, (Civil), MB-II UJVNL Chinyalisaur, Uttarkashi (Uttarakhand) Civil Repair and maintenance of Foot path toward the way of Sharashwati Shishumandir school at shaktipuram colony, MB-II, Chinyalisaur
102. 08/EE(CM)/DDN/2024-25 14-11-2024 04-12-2024 Dehradun Executive Engineer(Civil Maint.) Others M&R work of Type - I residences of UJVN Limited at yamuna colony, Dehradun for Year 2024-25
103. 07/EE(CM)/DDN/2024-25 14-11-2024 04-12-2024 Dehradun Executive Engineer(Civil Maint.) Others M&R of Type II (CT, E&F) Residences of UJVN Ltd. at Yamuna colony, Dehradun for Year 2024-25
104. 09/EE(E&M-I)/LP/2024-25 31-10-2024 03-12-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Supply of Fire Extinguishers and Fire Alarm for New Lakhwar Bhawan, Field Hostel, Guest House, Kandriyan Field Hostel, Lakhwar Substation and Hathiyari Substation, Dakpathar, Dehradun Corrigendum 1
105. 09/2024-25/EE/PCM(GV)/Mayapur 11-11-2024 02-12-2024 Hardwar Executive Engineer Project Civil Maintenance(GV), Mayapur Others Providing Manpower Services for a period of one year on outsource basis
106. 23/EE(M&G)/MPH/2024-25 12-11-2024 02-12-2024 Hardwar Executive Engineer (M&G)Mohammadpur, Gurukul Narsan Electrical and Mechanical Procurement & refilling of various Fire extinguishers installed at Mohammadpur Power House Corrigendum 1
107. 21/EEM&G)DKN/2024-25 14-11-2024 30-11-2024 Dhakrani E.E.-Maintenance& Generation Others Refurbishment of cable trench of 132 /33 KV switchyard of Dhakrani Power House
108. 15/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur Others M&R works of Kulhal Power House at Kulhal, Dehradun
109. 14/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur Others General cleaning and upkeeping park of Power House Colony at Kulhal (Dehradun)
110. 13/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur Others M&R of Power Channel including other work from Asan Barrage to Kulhal Power House, Dhalipur, Dehradun
111. 12/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur Others Repair and Maintenance of Parapet and other miscellaneous work along power channel Dhalipur, Dehradun
112. 11/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur Works Contract General Cleaning, upkeeping park work of Dhalipur Power House Colony at Dhalipur Dehradun for the year 2024-25
113. 10/EE/PCM/Dhalipur/2024-25 08-11-2024 29-11-2024 Dehradun Executive Engineer, PCM-Dhalipur General cleaning & upkeeping work of Asan Barrage, Park and Associated Structures at Dhalipur, Dehradun
114. 01 /EE (Test)/MB-II/2024-25 21-10-2024 29-11-2024 Uttarkashi The office of Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer AMC of Computer & IT equipment’s and Procurement of spares for the offices of Dharasu Power House, M.B.-II, Chinyalisaur including Joshiyara Barrage, Uttarkashi Corrigendum 1
115. 02/DGM(IT)/EE(E&M-I)/2024-25 14-11-2024 28-11-2024 Dehradun EXECUTIVE ENGINEER (E&M-I) Others Supply of Video Conferencing Monitor at “UJJWAL”,UJVN Limited, Dehradun
116. 12/EE(E&M)/Vyasi Dam/2024-25 08-11-2024 28-11-2024 Dakpathar Executive Engineer (E&M-I), Vyasi Project, Dakpathar Others Supply & Installation of Cylinderless fire suppression tube atVyasi Dam Site Juddo, Dehradun
117. 02/EE(Civil)/SHP/Maneri/2024-25 07-11-2024 28-11-2024 Uttarkashi Executive Engineer(Civil)/SHP/Maneri Others Special Repair & Maintenance work of Forebay, Power Channel, Power House Building and other associated works at Pilangad SHP (2x1125 KW) in Distt- Uttarkashi
118. 25/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-11-2024 28-11-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Miscellaneous civil work at valve chamber & surgh shaft of Dharasu Power House, MB-II Project, Dharasu, Uttarkashi.
119. 24/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-11-2024 28-11-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Fixing of iron gate and other miscellaneous work at intermediate adit of MB-II. HEP, Uttarkashi.
120. 08/2024-25/EE(C)/Pashulok Barrage 07-11-2024 27-11-2024 Rishikesh Executive Engineer (Civil) Pashulok Barrage Others Works Related to Barrels and Cross Drainages of Chilla HEP Power Channel at Rishikesh
121. 09/2024-25/EE(Civil)/UJVNL/Pashulok Barrage 07-11-2024 27-11-2024 Rishikesh Executive Engineer (Civil) Pashulok Barrage Others Annual Maintenance & Repair of Power Channel of Chilla Hydro Electric Project
122. 06/EE(E&M-II)/LP/2024-25 06-11-2024 27-11-2024 Dakpathar Office of the Executive Engineer (EM-II),Lakhwar MPP, Dakpathar Executive Engineer Supply and applyion of epoxy-based electrical insulation at control room of 33/11 kV Lakhwar Substation
123. 04/EE(E&M)/AT&TP/2024-25 05-11-2024 26-11-2024 Dakpathar Office of the Executive Engineer (E&M), Arakot-Tuini & Tiuni-Plasu Projects, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (M&M Bolero/TUV 300 or equivalent) along with the driver for pool vehicle Executive Engineer (E&M) office of Arakot Tiuni & Tiuni Plasu Projects
124. 06/EE(CM)/DDN/2024-25 05-11-2024 26-11-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Housekeeping Service for New Corporate Office Building for the year 2024-25 ,Ujjawal,Maharani Bagh, Dehradun
125. 05/EE(CM)/DDN/2024-25 04-11-2024 25-11-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Cleaning and Upkeep (General Cleaning & Sweeping etc.) of Residences of UJVN Limited at Yamuna Colony, Dehradun for the year 2024-25.
126. 04/EE(CM)/DDN/2024-25 04-11-2024 25-11-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Cleaning and Upkeep of Ganga Bhawan, Yamuna Bhawan (General Cleaning & Sweeping etc.) of UJVN Limited at Yamuna Colony, Dehradun for the year 2024-25
127. 16/EE(Maint.)/Khodri/2024-25 25-10-2024 25-11-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer AMC of Automation system of various pumps of Khodri Power Station. Corrigendum 1
128. 11/SPH/2024-25 18-10-2024 25-11-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Engagement of 04 nos Skilled and 03 nos unskilled Manpower for Mechanical, Electrical, Generation, Test and Office for day-to-day basis work for a period of 11 months” at Sharda Power House, Lohiahead, Khatima Distt. Udham Singh Nagar (Uttarakhand). Corrigendum 1
129. 15/EE(M)/RPSK/2024-25 20-10-2024 24-11-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Operation & Maintenance of drinking water supply system for a period of twelve months alongwith other associated works at Hydel Colony Kalagarh Distt. Pauri Garhwal. Corrigendum 1
130. 04/EE (G)/TPH/2024-25 10-10-2024 23-11-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Miscellaneous Painting works at Tiloth Power House, Uttarkashi Corrigendum 1
131. 32/EE(Pathri)/2024-25 08-11-2024 22-11-2024 Hardwar EE-M&G UGC-Projects Pathari Electrical and Mechanical Annual Contract for Cleaning & Up- Keeping of Offices & recreation areas at Pathri Power House
132. 31/EE(Pathri)/2024-25 08-11-2024 22-11-2024 Hardwar EE-M&G UGC-Projects Pathari Electrical and Mechanical Annual Contract for Operation & Maintenance works of Water Pumping Station of Pathri Power House
133. 01/UJVNL/EE(I&P-II)/2024-25 14-10-2024 21-11-2024 Dehradun Office of the Executive Engineer (I&P-II), Ujjwal, Maharani Bagh, GMS Road, Dehradun Executive Engineer Providing Consultancy Services & Preparation of Comprehensive and Bankable Detailed Project Report for Ichari Pumped Storage Project, 600 MW located in District Dehradun of Uttarakhand. Corrigendum 1
134. T-21/EEM/2024-25 30-10-2024 20-11-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Re-batting and machining of one set of TGB & LGB/UGB Pad of Chilla Power House
135. T-20/EEM/2024-25 30-10-2024 20-11-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Providing services of divers to carry out the various underwater works at chilla power house
136. 09/EE/PCM/Dhalipur/2024-25 05-11-2024 19-11-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Demolishing dilapidated 140 residential & Non-residential building of Asan Colony at Dhalipur, Dehradun
137. 11/EE/M&G/DLR/2024-25 29-10-2024 19-11-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Polysulfide based epoxy resin protective coating of Unit -A & C
138. 10/EE/M&G/DLR/2024-25 29-10-2024 19-11-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Repairing & overhauling of vertical turbine type dewatering pump and drainage pump
139. 12/EE(M)/VP/2024-25 28-10-2024 19-11-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Annual maintenance contract of Drainage, Dewatering & -24 Flood Pump System of Vyasi HEP at Hathiyari
140. 11/EE(M)/VP/2024-25 28-10-2024 19-11-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Silt Cleaning from HRT Adit -24 gate site, drainage pit, dewatering pit & drainage gallery and EL 506.00 M floor of Vyasi HEP at Hathiyari
141. 17/EEM&G)DKN/2024-25 26-10-2024 19-11-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of Dredger Machine with operator for removal of rubbish & sludge from intake
142. 16/EEM&G)DKN/2024-25 26-10-2024 19-11-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Operation Contract of 33 kV substation at Dhakrani Power Station
143. 11/EE(E&M)/Vyasi Dam/2024-25 29-10-2024 18-11-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Electrification & repairing of wiring etc at guest house Vyasi Dam, Juddo Dist- Dehradun
144. 10/EE(M)/Vyasi/24-25 28-10-2024 18-11-2024 Dakpathar The office of Executive Engineer (Maint.), Vyasi Power Station, Dakpathar Executive Engineer SITC of Single Grider EOT Carne of capacity 10Ton at Central Store of Vyasi Power House, Hathiyari.
145. 14/UJVNL/EE (M&G)/KPS/2024-25 29-10-2024 18-11-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Making and Installation of M.S. stairs for EOT crane and M.S. platform of Unit B & C at Kulhal Power House.
146. 13/UJVNL/EE (M&G)/KPS/2024-25 29-10-2024 18-11-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Polysulfide based epoxy resin (polypoxy) protective coating on penstock, stainers along with cooling water line outer surface area at Kulhal Power House
147. 05/EE (E&M)/(SHP)/Rishikesh/2024-25 08-10-2024 18-11-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Repair and Maintenance works of Unit-1 Machine at (2x1500kW) Urgam SHP in District Chamoli Corrigendum 1
148. 04/EE (E&M)/(SHP)/Rishikesh/2024-25 08-10-2024 18-11-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Repair and maintenance of Unit-2 Machine at Pilangad SHP (2 X 1125 kW) in District Uttarkashi Corrigendum 1
149. 11/EE(E&M)/MB-II/Barrage/2024-25 24-10-2024 16-11-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Fabrication of ladder , emergency exit cover, stop log gates cover, Radial Gate Rope Drum shed and walkway towards Radial Gate top Pulley as per site at Joshiyara barrage, Uttarkashi
150. 10/EE(E&M)/MB-II/Barrage/2024-25 24-10-2024 16-11-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Supply and Repairing of Bi-Directional Sirens at Joshiyara barrage, Uttarkashi
151. 08/EE(Generation)/Vyasi/2024-25 24-10-2024 16-11-2024 Dakpathar Office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Supply, Installation, Testing, Commissioning of Submersible Pump at TRC of Vyasi Power House
152. 08/EE(E&M)/MB-II/Barrage/2024-25 03-10-2024 16-11-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Supply of human safety items at Joshiyara Barrage, Uttarkashi
153. 17/EE(Maint.)/Khodri/2024-25 25-10-2024 14-11-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Complete overhauling & rebuild of old Duplex strainers of unit no 3 & 4 of Khodri Power Station
154. 15/EE(Maint.)/Khodri/2024-25 25-10-2024 14-11-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Procurement of Breaking Link of Cast Iron for Guide Vane at Khodri Power House
155. 10 /EE(E&M)/Vyasi Dam/2024-25 24-10-2024 14-11-2024 Juddo Dakpathar Annual Sweeping, cleaning, up keeping & Sanitization work of Vyasi Dam, Juddo Dist- Dehradun. Executive Engineer Annual Sweeping, cleaning, up keeping & Sanitization work of Vyasi Dam, Juddo Dist- Dehradun.
156. 08 /EE(G)/Chilla/2024-25 22-10-2024 13-11-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Procurement of Stationery Items for General Manager (Ganga Valley), Mayapur, Haridwar office and various other offices under HGC, Chilla Powerhouse.
157. T-19/EEM/2024-25 30-10-2024 12-11-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Maintenance) Chilla.
158. 08/2024-25/EE/PCM(GV)/Mayapur 22-10-2024 12-11-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Special M&R Work of Offices & Store Rooms in the premises of Chilla Power House.
159. 07/2024-25/EE/PCM(GV)/Mayapur 22-10-2024 12-11-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R Work of Mayapur Colony for the year 2024-25.
160. 03/EE(Civil-I)/Tiuni-Plasu/2024-25 16-10-2024 11-11-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Bolero/TUV or equivalent make) along with the driver for pool vehicle related to Arakot-Tiuni & Tiuni-Plasu HEP works for period of one year
161. 02/EE(Civil-I)/Tiuni Plasu/2024-25 10-10-2024 11-11-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu Project, Dakpathar Executive Engineer Hiring of one number light diesel/Petrol vehicle (Mahindra Bolero/TUV or equivalent make) along with the driver for the office of DGM(Civil) Arakot Tiuni & Tiuni Plasu, HEP for Period of one year
162. 06/EE(E&M)(SHP)/Rishikesh/2024-25 08-10-2024 11-11-2024 Rishikesh Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh Executive Engineer Repair and Maintenance of Nozzle shaft, Guide Bearing, Thrust Pads and Runner reassembly works of Unit-2 at 2x1500kW Urgam SHP in District Chamoli.
163. 18/EEM/2024-25 19-10-2024 09-11-2024 Chilla Office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Hiring of 3 Nos 50/52 Seater School Bus for Chilla Project Colony, Chilla..
164. 17/EEM/2024-25 19-10-2024 09-11-2024 Chilla Office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Supply and Application of Coating Material on different Underwater parts in Unit No-1 &2 of Power House.
165. 06/EE (G)/TPH/2024-25 19-10-2024 08-11-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual contract for General Cleaning and upkeeping of Tiloth Power House, Uttarkashi.
166. 05/EE (G)/TPH/2024-25 19-10-2024 08-11-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual contract for Gardening, Plantation &other associated miscellaneous works at Tiloth Power House, Uttarkashi .
167. 03/EE(Civil-II)/LMP/2024-25 18-10-2024 07-11-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun Executive Engineer Annual Cleaning, Upkeeping, Gardening of Field Hostel and officer’s Sport Complex of Lakhwar Project at Dakpathar, Dehradun (Year 2024-25).
168. 09/EE/M&G/DLR/2024-25 17-10-2024 07-11-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Replacement of transformer oil in 20 MVA Generator Transformer of Unit-A at Dhalipur Power House
169. 23/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 16-10-2024 07-11-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Graffiti wall painting at nigam boundary wall near Mary Mata School, shaktipuram colony, Chinyalisaur, MB-II, Uttarkashi.
170. 22/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 16-10-2024 07-11-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Development of garden and landscaping work in Dharasu power house complex at Dharasu, uttarkashi
171. PDD-10/2024-25 11-10-2024 07-11-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Supply of Electrical wiring materials
172. 14/EE(M)/2024-25 15-10-2024 06-11-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply of various consumable items for Tiloth Power House, Uttarkashi.
173. 07/EE(Generation)/Vyasi/2024-25 15-10-2024 06-11-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Supply, Installation, Testing, Commissioning of Mobile Signal Booster at Vyasi HEP
174. 06/EE(Generation)/Vyasi/2024-25 15-10-2024 06-11-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Supply of consumable items for Vyasi Power Staton (2x60 MW), Hathiyari
175. 22/EE (M)/MB-II/2024-25 05-10-2024 06-11-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Providing & Application of Protective Coating work on MIV external Surface at Dharasu Power House, M.B.-II Uttarkashi
176. 14/EE(Maint.)/Khodri/2024-25 16-10-2024 05-11-2024 Khodri Khodri Executive Engineer Hiring of vehicle (Mahindra Bolero/TUV 300/Eq.) with driver for office of the EE(Maint.), Khodri Power Station
177. 07 /EE(G)/Chilla/2024-25 10-10-2024 05-11-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Repairing of 04 nos Air Blowers at Chilla Power House
178. 04/EE (E&M)/Dharchula/2024-25 22-10-2024 04-11-2024 Pithoragarh Office of the Executive Engineer (E&M), UJVN Limited, Dharchula, Pithoragarh Executive Engineer Repairing of 4000 KVA, Generator Transformer for unit no. 2 of 2x2.5 MW Suringad SHP at tehsil Musyari in District – Pithoragarh (Uttarakhand).
179. 13/EE(G)/Klg/2024-25 21-10-2024 04-11-2024 Pauri-Garhwal Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Procurement and Application of Insulation Epoxy Coating & Anti-Acid coating at various floor areas & battery bank room
180. 13/EE(Gen)/Khodri/2024-25 15-10-2024 04-11-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun Executive Engineer Application of Zinc rich galvanized Coating in 220 KV Switchyard Steel Structure along with Fire protection Cable Coating Work at switchyard of Khodri Power Station.
181. 07/2024-25/EE(C)/Pashulok Barrage 11-10-2024 04-11-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Enhancement of Instrumentation of Virbhadra Barrage at Pashulok, Rishikesh.
182. 01/EE (G)/TPH/2024-25 12-09-2024 04-11-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Testing of Transformer Oil of various Transformers installed at Tiloth Power House, Uttarkashi .
183. 13/EE(M)/MB-II/24-25 31-08-2024 04-11-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Upper Fixed Labyrinths for 76 MW Turbines at Dharasu Power House, MB-II, Uttarkashi
184. 25/EE (M)/MB-II/2024-25 10-10-2024 01-11-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Re- babbiting of TGB pads and Supply of Blue Matching Device of 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
185. 24/EE (M)/MB-II/2024-25 10-10-2024 01-11-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Protective Coating of underwater parts of turbine of Dharasu Power House Uttarkashi
186. 08/EE/M&G/DLR/2024-25 10-10-2024 31-10-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Repair/coating of penstock outer periphery concrete joints (both side) for all the three units of Dhalipur Power House.
187. 06/EE(E&M-SHP)/Kaliganga-I/2024-25 05-10-2024 30-10-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Annual Operation and Maintenance of Kaliganga-I SHP (2x2 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag
188. 12/UJVNL/EE(M&G)/KPS/2024-25 09-10-2024 29-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Maintenance of Unit-B of Kulhal Power House (3 X 10 MW)
189. 11/UJVNL/EE(M&G)/KPS/2024-25 09-10-2024 29-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Maintenance of Unit-A of Kulhal Power House (3 X 10 MW)
190. PDD-09/2024-25 07-10-2024 29-10-2024 Dehradun Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply Installation Testing and Commissioning of spares on 33 kV Indoor type ABB _33kV_VHA36 (HPA SF6 CB) Panels at DPH Khodri under PDD.
191. 10/SPH/2024-25 04-10-2024 29-10-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer In situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories of UNIT 2 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead
192. 09/SPH/2024-25 04-10-2024 29-10-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply and fixing of wire rope sling of bypass gate no1, overhauling of winch machine and overhauling of over head gantry crane (Capacity 20 Ton) at Sharda Power House, Lohiahead
193. 08/SPH/2024-25 04-10-2024 29-10-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply and fixing of bottom rubber seal in downstream gates at Sharda Power House, Lohiahead on open tender basis
194. 11/EE(HQ)/2024-25 07-10-2024 28-10-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Annual Operation, maintenance, cleaning and up-keep of Transit Camp of UJVN Ltd. At B-39, Sector 14, Noida (UP)
195. 06/EE(E&M)/PB/2024-25 07-09-2024 28-10-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Sweeping and Cleaning work of Virbhadra Barrage, Pashulok, Rishikesh
196. 05/EE(E&M)/PB/2024-25 07-09-2024 28-10-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Trash Cleaning work at Virbhadra Barrage, Pashulok Rishikesh
197. 21/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-10-2024 28-10-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Renovation and modernization of meeting hall at Dharasu Power House, MB-II Project, Chinyalisaur, Uttarkashi.
198. 20/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-10-2024 28-10-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Installation of Automatic boom barrier and other associated civil works at Dharasu Power House, MB-II, Chinyalisaur, Uttarkashi.
199. 07/EE/M&G/DLR/2024-25 06-10-2024 28-10-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Fabrication and fixing of new SS Hand railing etc.
200. 06/EE/M&G/DLR/2024-25 06-10-2024 28-10-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Supply of spares and AMC services 10 KLD capacity fully automatic MBR technology sewage treatment plant
201. 05/EE/M&G/DLR/2024-25 06-10-2024 28-10-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Re-filling of various types of fireextinguishers
202. 22/EE(MPH)/2024-25 06-10-2024 28-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Supply of Stationary Items of Mohammadpur Power House..
203. 13/EE(Maint.)/Khodri/2024-25 07-10-2024 28-10-2024 Khodri Office of the EE (Gen.), Khodri EE (Gen.) Hiring of vehicle (Mahindra Bolero/TUV 300/Eq.) with driver for office of the EE (Gen.), Khodri Power Station
204. 14/EE(M)/RPSK/2024-25 21-09-2024 28-10-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven light motor vehicle (LMV) for a period of twelve months for EE(G).
205. 13/EE(M)/RPSK/2024-25 21-09-2024 28-10-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven light motor vehicle (LMV) for a period of twelve months for EE(M).
206. 15/EEM&G)DKN/2024-25 04-10-2024 26-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Repair & overhauling of Guide vane locks and air release valves of Unit C
207. 14/EEM&G)DKN/2024-25 04-10-2024 26-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Various Electrical Maintenance Work of Unit-C
208. 23/EE (M)/MB-II/2024-25 05-10-2024 26-10-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Making provision for drainage of oil from Governor and MIV oil sump at Dharasu power House M.B -II, Uttarkashi.
209. 03/EE (G)/TPH/2024-25 04-10-2024 26-10-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Providing & Fixing of Nomenclature sheets at Tiloth Power House, Uttarkashi.
210. 02/EE (G)/TPH/2024-25 04-10-2024 26-10-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Fire Protection coating on 11 kV & LT panel cables at Tiloth Power House, Uttarkashi.
211. 06/SPH/2024-25 03-09-2024 26-10-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual General cleaning of Power House & Office Buildings at Sharda Power House, Lohiahead for one year
212. 16/EE(Civil)/MB-I/TN/2024-25 10-10-2024 25-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Operation & maintenance of water Supply System at Maneri Dam Colony, Uttarkashi.
213. 10/UJVNL/EE(M&G)/KPS/2024-25 05-10-2024 25-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer “Hiring of one no. (10 seater) Force Trax Cruiser School Van / Mahindra Supro School Van / Tata Magic Express School Van / Equivalent model 2021 or later for School going Children of Employees Posted at Kulhal Power Station
214. 09/UJVNL/EE(M&G)/KPS/2024-25 05-10-2024 25-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Hiring of one no. non AC Jeep (Bolero plus /TUV 300) (7-seater, Model 2021 or later) along with driver for one year.
215. 13/EEM&G)DKN/2024-25 03-10-2024 25-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer In-situ repair of Shaft Journal, runner & misc. mechanical maintenance work of Unit C
216. 12/EEM&G)DKN/2024-25 03-10-2024 25-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Operation & maintenance of Officer transit camp & mango orchard
217. PDD-08/2024-25 04-10-2024 25-10-2024 Dehradun Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply and fixing of 33 kV LA, earthing, & miscellaneous work on feeders at Salab ka Khala under PDD
218. 12/2024-25/EE(C-M)Vyasi Project 09-10-2024 24-10-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Resettlement and Rehabilitation (R&R) works related to Vyasi HEP Dakpathar, Dehradun for period of one year
219. 11/2024-25/EE(C-M)Vyasi Project 09-10-2024 24-10-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Pool vehicle related to Civil-Maintenance works of Vyasi HEP Dakpathar, Dehradun for period of one year
220. 09/EE(E&M)/MB-II/Barrage/2024-25 03-10-2024 24-10-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Annual Routine Maintenance of Electro-Mechanical and Hydro Mechanical
221. 07/EE(E&M)/MB-II/Barrage/2024-25 03-10-2024 24-10-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Supply of Motors for various gates at Joshiyara Barrage, Uttarkashi
222. 06/EE(E&M)/MB-II/Barrage/2024-25 03-10-2024 24-10-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Procurement of Electrical items for Joshiyara barrage colony, Uttarkashi
223. 12/EE(Gen)/Khodri/2024-25 03-10-2024 23-10-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply, Installation, Testing & Commissioning of RTDs and 24 Channel Smart Temperature Controller for generator fo Unit No. 4 of Khodri Power Station
224. 11/EE(Gen)/Khodri/2024-25 03-10-2024 23-10-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Repairing & Servicing of Isolators & Other miscellaneous equipment during Annual Maintenance of Unit No. 1,2,3 & 4 at Khodri Power Station
225. 15/EE(C&M)/MB-II/Joshiyara/2024-25 08-10-2024 22-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual sweeping , cleaning & Maintenance of office building at Joshiyara Uttarkashi.
226. 14/EE(C&M)/MB-II/Joshiyara/2024-25 08-10-2024 22-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Repair of approach road from Forebay to Manera by Pass adjoining water treatment plant at Joshiyara Uttarkashi.
227. 13/EE(C&M)/MB-II/Joshiyara/2024-25 08-10-2024 22-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Development of road near rudraksh vatika at Joshiyara Barrage MB-II, Uttarkashi
228. 12/EE(C&M)/MB-II/Joshiyara/2024-25 08-10-2024 22-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual Operation and Maintenance of 50 KLD Capacity MBR Technology based STP at Joshiyara, Uttarkashi.
229. 07/EE(E&M)/PB/2024-25 07-10-2024 22-10-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Maintenance of hydro Mechanical and Electro Mechanical components of Virbhadra Barrage Pashulok, Rishikesh
230. 07/EE(C&M)/MB-II/Joshiyara/2024-25 28-09-2024 22-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi Executive Engineer Installation of required instruments for the safety of Joshiyara Barrage, MB-II, Uttarkashi Corrigendum 1
231. 09/EE(E&M)/Vyasi Dam/2024-25 01-10-2024 22-10-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Providing & fixing of various identification sign boards, instruction marking and equipment marking/ name plate/ identification at Vyasi Dam, Juddo Dist- Dehradun
232. 11/EE(M)/RPSK/2024-25 24-08-2024 22-10-2024 kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. PauriGarhwal Executive Engineer Hiring of one no. 32 seater non AC bus for transportation of employees of Ramganga Power Station, Kalagarh for a period of 12 calendar months
233. 11/EE(C&M)/MB-II/Joshiyara/2024-25 07-10-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-IIJoshiyara, Uttarkashi Executive Engineer Laying of Water Supply line in Rehabilitation area, near nigam colony Kansain and in U/S of Joshiyara Motor Bridge and other associated miscellaneous civil works, at MB-II, Joshiyara Uttarkashi.
234. 10/EE(C&M)/MB-II/Joshiyara/2024-25 07-10-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-IIJoshiyara, Uttarkashi Executive Engineer Up-keeping and maintenance work of parksof Joshiyara barrage, MB-II, Uttarkashi
235. 09/EE(C&M)/MB-II/Joshiyara/2024-25 07-10-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-IIJoshiyara, Uttarkashi Executive Engineer Maintenance & operation of vehicle parking at Joshiyara Barrage, MB-II, Uttarkashi
236. 06/2024-25/EE/PCM(GV)/Mayapur 30-09-2024 21-10-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Providing Parking Shade Near Executive Engineer Office at Mohammadpur Colony
237. 05/2024-25/EE/PCM(GV)/Mayapur 30-09-2024 21-10-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Annual M&R Work of Type-I Residences & Non Residencial Buildings at Chilla Colony for the Year 2024- 25
238. 13/EE(M)/2024-25 30-09-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply and application of wear and protective coating on underwater parts of Unit #2 & 3
239. 03/EE(Civil)/MB-I/TN/2024-25 28-09-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Housekeeping and operation of field Hostel and officer’s Transit camp at Maneri Dam Colony, Maneri, Uttarkashi
240. 08/UJVNL/EE (M&G)/KPS/2024-25 30-09-2024 21-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Major overhauling and repair of Unit-C of Kulhal Power Station (3x10 MW).
241. 07/UJVNL/EE (M&G)/KPS/2024-25 30-09-2024 21-10-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Renovation and refurbishment of Drainage-Dewatering pit at Kulhal Power House (3x10 MW)
242. 09/EE(M)/Vyasi/24-25 30-09-2024 21-10-2024 Dakpathar The office of Executive Engineer (Maint.), Vyasi Power Station, Dakpathar Executive Engineer SITC of 05 Ton capacity Monorail hoist with CT and LT system for cooling system at Vyasi Power House, Hathiyari.
243. 04/EE (GC)/2024-25 25-09-2024 21-10-2024 Dehradun Office of the Executive Engineer (Galogi Complex), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Procurement of Electrical spares at Galogi SHP
244. 05/EE(E&M-SHP)/Kaliganga-II/2024-25 26-09-2024 21-10-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Design, supply, installation, testing and commissioning of appropriate ventilation system for synchronous generators for Kaliganga-II SHP(2x2.25 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
245. 05/EE(C&M)/MB-II/Joshiyara/2024-25 21-09-2024 21-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi Executive Engineer Reaming/Re-drilling of Clogged drain holes of foundation gallery of Joshiyara, Barrage, MB-II, Uttarkashi.
246. 08/EE(E&M)/DKP BRG/2024-25 27-09-2024 19-10-2024 Dakpathar Barrage Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Annual Trash rack cleaning and conducting flushing during Monsoon period at Dakpathar Barrage
247. 20/EE(MPH)/2024-25 29-09-2024 18-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Inspection & testing of Pressure/Lifting equipments and devices of Mohammadpur Power House
248. 07/EE(E&M)/Vyasi Dam/2024-25 28-09-2024 18-10-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer SITC of pump along with pipeline to dump yard area at Vyasi Dam, Juddo, Dehradun
249. 16/EEM/2024-25 27-09-2024 18-10-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Shifting and assemble work of existing single phase street light in central store at Chilla Power House .
250. 12/EE(M)/2024-25 26-09-2024 18-10-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Rewiring of different residential quarters of colonies
251. 11/EE(M)/2024-25 26-09-2024 18-10-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Repairing and Rewinding of 630 KVA transformer.
252. 21/EE (M)/MB-II/2024-25 26-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Level monitoring work of Surge Tank at Dharasu Power House (MB-II)
253. 11/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Electrical Items for MB-II, Dharasu Power House
254. 10/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Miscellaneous Consumable items for Generator Transformer at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi
255. 09/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Miscellaneous Consumable items for Generator Maintenance at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi.
256. 14/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Painting of various Electrical Equipment, Panels and Staircase at MBII, Dharasu Power House, Chinyalisaur, Uttarkashi.
257. 13/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Safety audit of various equipments and T&P at MB-II, Dharasu Power House and Joshiyara Barrage
258. 12/EE (GEN)/MB-II/2024-25 24-09-2024 18-10-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Maintenance of garden and operation of canteen at Dharasu Power House for the year 2024-25
259. 06/ EE(E&M)/ AB/ (2024-25) 22-09-2024 18-10-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, ‘Jal Shakti Bhawan’, Dhakrani, Dehradun Executive Engineer Supply & Erection of Water Purifier & Other Works at Asan Barrage, Dhalipur.
260. 02 / EE(EM-ISO) / 2024-25 / ISMS 04-09-2024 17-10-2024 Dehradun Office of the Executive Engineer (EM-ISO), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Certification of ISMS (ISO 27001:2022) for Sites (Power House/Dam/Barrage) having IT/OT infrastructure under Phase-IV of UJVN Ltd
261. 11/EEM&G)DKN/2024-25 24-09-2024 16-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Re-rubberisation of water lubricated lower guide bearing and Supply and fixing of Labyrinths and Shaft Sleeve.
262. 10/EEM&G)DKN/2024-25 24-09-2024 16-10-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Extension of Security Fence of Dhakrani Power Station
263. 19/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 23-09-2024 16-10-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Special maintenance and repair of General Manager Office, at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi
264. 03/EE (E&M)/Dharchula/2024-25 30-09-2024 14-10-2024 Pithoragarh Office of the Executive Engineer (E&M), UJVN Limited, Dharchula, Pithoragarh Executive Engineer Repairing of 4000 KVA, Generator Transformer for unit no. 2 of 2x2.5 MW Suringad SHP at tehsil Musyari in District – Pithoragarh (Uttarakhand).
265. 15/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Repair & maintenance of Saraswati Vidhya Mandir School Jyotipuram at Tiloth House Campus, Uttarkashi.
266. 14/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Civil maintenance & Repair of Tail Race Channel of Tiloth Power House, Uttarkashi
267. 13/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Construction of C.C Road fo H.R.T & Repair of Adit wall at Lamb goan Road, Uttarkashi
268. 12/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Civil Maintenance & repair of Various type of Residences at Tiloth Colony,Uttarkashi
269. 11/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Civil Maintenance & Repair of Tiloth Power House Complex, Uttarkashi.
270. 10/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual operation & maintenance of Mulsifyre water line at Tiloth power house, Uttarkashi
271. 09/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual operation & maintenance of water Supply Distribution System of Kuteti Colony at Uttarkashi
272. 08/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual operation & maintenance of Water supply distribution system of Tiloth Power house Colony at Uttarkashi
273. 07/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and Drains in Kuteti Devi Colony, Uttarkashi.
274. 06/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and drains in Tiloth Power House Colony, Uttarkashi
275. 05/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual Operation and maintenance of 15 KLD STP based at Tiloth Power House, Tiloth, Uttarkashi
276. 04/EE(Civil)/MB-I/TN/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Repair and Maintenance of BP and CP-Type residential quarters in Maneri Dam Colony, Maneri, Uttarkashi,
277. 21/EE(MPH)/2024-25 29-09-2024 14-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Various Electrical testing and maintenance works at 66kV Switchyard at Mohammadpur Power House
278. 19/EE(MPH)/2024-25 29-09-2024 14-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repair of Cooling water pipeline at Mohammadpur Power House
279. 08/EE(C&M)/MB-II/Joshiyara/2024-25 28-09-2024 14-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi Executive Engineer Providing & fixing of concertina coil over fencing in Barrage appurtenants and around Joshiyara Barrage, reservoir MB-II, Uttarkashi.
280. 08/EE(E&M)/Vyasi Dam/2024-25 29-09-2024 14-10-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Shifting of High Mast Structure at Vyasi dam Juddo, Dehradun
281. 12/EE(G)/CPH/2024-25 22-09-2024 14-10-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply of spares & AMC of CCTV Surveillance System at Chibro Power House
282. 11/EE(G)/CPH/2024-25 22-09-2024 14-10-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Retubing & testing of 02 nos. spare Stator Air Coolers for 60MW Generator at Chibro Power House
283. 10/EE(Gen)/Khodri/2024-25 23-09-2024 14-10-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Repairing & rewinding of various induction motor installed at Khodri Power Station
284. 09/EE(Gen)/Khodri/2024-25 23-09-2024 14-10-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Detailed assessment by diagnostics & analysis for incipient fault prediction of 4 x 34 MVA Genrating transformers of 11/220kV BHEL make Transformer at Khodri Power Station
285. 12/EE(Maint.)/Khodri/2024-25 23-09-2024 14-10-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Hiring of Vehicle (Mahindra Bolero/TUV 300/Eq.) with driver for round O’ Clock Emergency duty at Khodri Power Station
286. 05/ EE(E&M)/ AB/ (2024-25) 22-09-2024 14-10-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, ‘Jal Shakti Bhawan’, Dhakrani, Dehradun Executive Engineer Supply & Erection of AC & Other Material at Asan Barrage, Dhalipur.
287. 09/EE(MPH)/2024-25 22-09-2024 14-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Supply, Servicing and Repairing of Exhaust Fans at Mohammadpur Power House.
288. 07/EE(MPH)/2024-25 22-09-2024 14-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Providing and fixing of Special bird Guard/Bird Scare at Mohammadpur Power House.
289. 07/EE(E&M)/DKP BRG/2024-25 13-09-2024 14-10-2024 Dakpathar Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Annual contract for caulking the leakage of under sluice and barrage bay gates at Dakpathar Barrage
290. 06/EE(E&M)/DKP BRG/2024-25 13-09-2024 14-10-2024 Dakpathar Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Fabrication of Tin Shed on the steel structure of HR gates & Replacement of shutter rolling mechanism of Main store at Dakpathar Barrage.
291. 06/EE(C&M)/MB-II/Joshiyara/2024-25 21-09-2024 12-10-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi Executive Engineer Installation of required instruments for the safety of Joshiyara Barrage, MB-II, Uttarkashi.
292. 02/अ०अ० (वि०/ या०) / मनेरीबांध / 2024-25 21-09-2024 12-10-2024 Uttarkashi Uttarkashi Executive Engineer अधि०अभि० (वि० / या०), मनेरी बांध, मनेरी, उत्तरकाशी के प्रयोगार्थ एक वर्श की अवधि हेतु एक डीजल चालित वाहन (वातानुकूलित रहित) चालक सहित किराये पर लेने हेतु।
293. e-01/UJVNL/IT/EE(EM-II)/2024-25 20-09-2024 11-10-2024 Dehradun Office of the Executive Engineer (IT), “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Development of e-FMS Solution
294. 06/EE(M)/VP/2024-25 20-09-2024 10-10-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari, Executive Engineer Annual Maintenance contract for EOT Crane Capacity -24 100/25 Ton, Vyasi HEP at Hathiyari
295. 08/EE(M)/VP/2024-25 20-09-2024 10-10-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Applying of polyurethane flooring and associated work at mechanical workshop of Vyasi Power House, Hathiyari
296. 18/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-09-2024 10-10-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Providing of Car TinShed in BP Type Qtr. at Shaktipuram Colony, MB-II, Chinyalisaur, Uttarkashi
297. 17/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-09-2024 10-10-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing work of Court Yard floor in CP Type Quarters at Shaktipuram Colony, MB-II, Chinyalisaur, Uttarkashi.
298. 30/EE(Pathri)/2024-25 26-09-2024 09-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Polypoxy protective coating works on Draft Tube Gates and Blinding Gates of Pathri Power House
299. 29/EE(Pathri)/2024-25 26-09-2024 09-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Miscellaneous maintenance works regarding safety at Pathri Power House
300. 28/EE(Pathri)/2024-25 26-09-2024 09-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repair & overhauling works in 15 Ton & 5 Ton capacity gantry cranes of Pathri Power House
301. 18/EE(MPH)/2024-25 24-09-2024 09-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repair, Overhauling & Maintenance of hoist assembly of 12 nos Intake Gates .
302. 17/EE(MPH)/2024-25 24-09-2024 09-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repair and overhauling of 5 Nos Bypass gates & one number side channel gate.
303. 01/2024-25/EE(Civil-II)/BP 27-08-2024 09-10-2024 Ghansali Tehri Garhwal Office of the Executive Engineer (Civil-II) Bhilangna Projects Ghansali Tehri Garhwal Executive Engineer Hiring of one no. vehicle (M&M Bolero, Non-AC, or equivalent) along with a driver for one year.
304. 27/EE(Pathri)/2024-25 25-09-2024 08-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Painting on structures of various auxiliaries of Pathri Power House.
305. 26/EE(Pathri)/2024-25 25-09-2024 08-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repairing & overhauling of Trash Rack Cleaning Machine & Debris Trolley of Pathri Power House.
306. 25/EE(Pathri)/2024-25 25-09-2024 08-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Servicing, alignment, maintenance & testing of 66KV Isolators & other miscellaneous works of Pathri Power House.
307. 24/EE(Pathri)/2024-25 24-09-2024 07-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Thermographic measurements of 66kV & 11 kV switchgear and repair of earthing at Pathri Power House.
308. 23/EE(Pathri)/2024-25 24-09-2024 07-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Supply, Installation, Testing and Commissioning of 10KVA online UPS at Pathri Power House.
309. 22/EE(Pathri)/2024-25 24-09-2024 07-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Various maintenance & testing works in 66 kV Switchyard at Pathri Power House.
310. 16/EE(MPH)/2024-25 22-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Removal of silt & debris from fore bay, in front of Intake gate & Down Stream side canal (front of draft tube)
311. 15/EE(MPH)/2024-25 22-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repair and painting work over Trash Rack Screens at Mohammadpur Power House.
312. 14/EE(MPH)/2024-25 22-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repairing, De-silting and Painting of overhead cooling water tanks including related supply at Mohammadpur Power House
313. 13/EE(MPH)/2024-25 22-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repairing of Tilting gates of Unit no. 1, 2 and 3 and supply items at Mohammadpur Power House
314. 06/EE/PCM/Dhalipur/ 2024-25 21-09-2024 07-10-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Cutting Down and disposal of 17 nos trees located Yamuna Colony and Asan Colony at Dhalipur
315. 12/EE(MPH)/2024-25 20-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Supply and application of coating material on concrete surface of the roof of Forebay of Unit No.3.
316. 11/EE(MPH)/2024-25 20-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Procurement of 11kV spares along with maintenance of Electrical panels & other Misc works at Power House
317. 10/EE(MPH)/2024-25 20-09-2024 07-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Supply, Installation, Testing & Commissioning of Digital Oil Temperature Indicator & Winding Temperature Indicator and other miscellaneous works at 11/66KV Switchyard of Power House
318. 08/EE (GEN)/MB-II/2024-25 04-09-2024 07-10-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Painting of 220 KV equipment support structures, marshalling box, DG set, wire fencing and main gate of the 220 kv switchyard at MB-II, Dharasu Power House
319. 07/EE (GEN)/MB-II/2024-25 04-09-2024 07-10-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Cleaning and repairing of stator core punching of 76 MW Capacity Hydro Generators of Dharasu Power House, MB-II, Chinyalisaur, Uttarkashi .
320. 06/EE(E&M)/Vyasi Dam/2024-25 30-08-2024 05-10-2024 Dakpathar Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar, UJVN Ltd Executive Engineer Establishment of Video Conferencing System at meeting room of Vyasi Dam, Juddo, Dehradun
321. 07/SPH/2024-25 11-09-2024 04-10-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and of Unit 3 with sealing and shifting of draft tube gates and sealing of intake gates and associated works of Sharda Power House, Lohiahead” through open tender basis
322. 08/EE(M&G)/MPH/2024-25 10-09-2024 04-10-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Haridwar Executive Engineer Annual Maintenance Works of Machine no 2&3 of Mohammadpur Power House
323. 06/EE(Test)/DKP/2024-25 11-09-2024 03-10-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Annual Maintenance and testing activities of all Units of 4x60MW Chibro Power House for F.Y. 2024-2025.
324. 09/EE(M)/2024-25 31-08-2024 03-10-2024 Uttarkashi The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi Executive Engineer Annual overhauling of unit 2 & 3 and repair of various underwater parts of Tiloth Power House, Uttarkashi.
325. 21/EE(Pathri)/2024-25 11-09-2024 01-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Servicing & testing of 11 KV Bus Bars & VCB’s of Pathri Power House.
326. 20/EE(Pathri)/2024-25 11-09-2024 01-10-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Calibration and other allied electrical works of Unit no.1 & 2 of Pathri Power House
327. 03/EE(E&M)/Solar/2024-25 30-08-2024 01-10-2024 Garhwal Office of the Executive Engineer (E&M), UJVN Ltd., Srikot, Srinagar (Garhwal) Executive Engineer 10 kW Roof Top Solar Power Plant at Intake of Madhyamaheshwar SHP, Mansoona, Ukhimath
328. 02/EE(E&M)/Solar/2024-25 30-08-2024 01-10-2024 Garhwal Office of the Executive Engineer (E&M), UJVN Ltd., Srikot, Srinagar (Garhwal) Executive Engineer 10 kW Roof Top Solar Power Plant at EE Office, Kund, Guptkashi
329. 01/EE(E&M)/Solar/2024-25 30-08-2024 01-10-2024 Garhwal Office of the Executive Engineer (E&M), UJVN Ltd., Srikot, Srinagar (Garhwal) Executive Engineer 10 kW Roof Top Solar Power Plant at DGM Office, Srikot, Srinagar (Garhwal)
330. 11/EE(Maint.)/Khodri/2024-25 09-09-2024 30-09-2024 Dehradun Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply of Consumables & various other items at Khodri Power Station
331. 04/EE(E&M-SHP)/KG-I/2024-25 23-08-2024 28-09-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Testing, Repair and maintenance of electrical auxiliaries, control, metering & protection, LT & HT panels and 33 kV switchyard equipment of Kaliganga-I SHP (2x2MW+15%COL) located in Tehsil Ukhimath, DistrictRudraprayag, Uttarakhand
332. e-09/EE(M&G)/DKN/2024-25 19-09-2024 27-09-2024 Dehradun Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Procurement of Cable Trays and Accessories.
333. 01/2024-25/EE(HM-II)/CD&H, Rishikesh 13-09-2024 27-09-2024 Dehradun f UJVN Limited, Executive Engineer (HM-II), CD&H, Pashulok, Rishikesh, Dehradun Executive Engineer Hiring of one no. light non-AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for DGM(CD-II) CD&H Office Dehradun
334. 10/EE(Maint.)/Khodri/2024-25 07-09-2024 27-09-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Annual maintenance work related to turbine & associated parts of Unit No. 01 of Khodri Power Station
335. 15/EEM/2024-25 06-09-2024 27-09-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Annual Maintenance work of Three Units at Chila Power House
336. 12/EE(G)/Klg/2024-25 06-09-2024 27-09-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Calibration of Instruments.
337. 11/EE(G)/Klg/2024-25 06-09-2024 27-09-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Internet leased line service at Ramganga Power Station, Kalagarh for a period of one year.
338. 05/SPH/2024-25 31-08-2024 27-09-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Repairing of tubewell no.2 by extension of bore upto 20 mtr depth along with addition of new filter at Sharda Power House, Lohiahead
339. 01/EE(Civil-II)/TP/2024-25 24-08-2024 27-09-2024 Dehradun Office of the Executive Engineer (Civil-II), Tiuni-Plasu, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Drilling & Associated testings for additional Geo -Technical Investigations at Tiuni-Plasu HEP in District -Dehradun, Uttrakhand
340. 08/EE(M)/2024-25 22-08-2024 27-09-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply of different filter spares for power house
341. 20/EE(M)/MB-II/24-25 05-09-2024 26-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Overhauling of Two Nos E.O.T Cranes of Capacity 125/25 Ton at Dharasu Power House, MB-II Uttarkashi .
342. 19/EE(M)/MB-II/24-25 05-09-2024 26-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of SS Forged Liner Plates for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
343. 18/EE (M)/MB-II/2024-25 05-09-2024 26-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and Overhauling of Centralized Greasing System and other works at Dharasu Power House, MB-II, Uttarkashi
344. 17/EE (M)/MB-II/2024-25 05-09-2024 26-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Servicing of EHG-100/G-40 Governor of Turbine at Dharasu Power House
345. 16/EE (M)/MB-II/2024-25 05-09-2024 26-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Epoxy Painting of Turbine, MIV and other equipment at Dharasu Power House M.B -II Uttarkashi
346. 10/EE(M)/2024-25 04-09-2024 26-09-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Re-babbiting of Thrust Bearing Pad of Tiloth Power House.
347. 03/EE(CM)/DDN/2024-25 05-09-2024 26-09-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of Type III Residences of UJVN Limited at Yamuna Colony. Dehradun.
348. 04 /EE(C&M)/MB-II/Joshiyara/2024-25 04-09-2024 25-09-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Reconstruction of Damaged Road from Gyansu Police Line to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi.
349. 02/EE(Civil-II)/LMP/2024-25 28-08-2024 25-09-2024 Dakpathar Office of the Executive Engineer (Civil-II), Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun Executive Enginee Construction of officers Guest house for Lakhwar Project (300 M W) in Tons Colony, Dakpathar, Dehradun.
350. 05/EE-II (E&M)/LP/2024-25 06-09-2024 24-09-2024 Dakpathar Office of the Executive Engineer-II (E&M),Lakhwar Project, Dakpathar Executive Engineer-II Purchasing of 100Mbps Internet Leased Line with static IP for Lakhwar Bhawan I & II for Dakpathar, Distt Dehradun
351. 04/EE-II (E&M-II)/LP/2024-25 06-09-2024 24-09-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II E&M Maintenance works of Lakhwar MPP Residence quarters and guest houses, officers club and transit camps at Dakpathar
352. 03/ EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2024-25 03-09-2024 24-09-2024 Arakot Tiuni Office of the Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Electrical works at the office building of projects Arakot-Tiuni & Tiuni-Plasu, Dakpathar
353. 10/EE(G)/Klg/2024-25 02-09-2024 24-09-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Annual General Cleaning of Ramganga Power Station, Kalagarh for 12 months.
354. 15/EE/PCM-DKP/TN/2024-25 02-09-2024 24-09-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Providing Manpower services on outsource basis for the office of DGM (Civil-Maintenance) Dakpathar and Executive Engineer, PCM-Dakpathar & Executive Engineer, PCM-Dhalipur
355. 04/EE(Civil-II)/Guptkashi/2024-25 30-08-2024 24-09-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Hiring of one number Light diesel Pool vehicle Mahindra & Mahindra Bolero (Non - AC) or equivalent with driver for one year on rent basis under O/o Executive Engineer (Civil-II) SHP, Guptkashi in District- Rudraprayag
356. 03/EE (Civil-I)/KG-II/2024-25 29-08-2024 24-09-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Annual Repair & Maintenance work of Civil structures at Kaliganga-II SHP (2x2.25 MW) in Distt- Rudraprayag.
357. 10/2024-25/EE(C-M)Vyasi Project 09-09-2024 23-09-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Operation, repair and maintenance of water supply distribution system including pumping plant at Hathiyari Power House of Vyasi HEP and cleaning of Public toilets/site office
358. 03/EE-II(E&M-II)/LP/2024-25 06-09-2024 23-09-2024 Dakpathar Office of the Executive Engineer (E&M-II), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer Annual Operation & Maintenance Contract for Lakhwar MPP office, guest house, Field hostel Buildings and residence quarters at Dakpathar.
359. 08/EEM&G)DKN/2024-25 31-08-2024 23-09-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of One No. AC diesel vehicle (Mahindra Scorpio or equivalent) alongwith driver for General Manager (Yamuna Valley-II) for one year
360. 07/EEM&G)DKN/2024-25 31-08-2024 23-09-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Testing of various equipment & T&P
361. 07/EE(E&M-I)/LP/2024-25 31-08-2024 23-09-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Annual maintenance Contract for 33 KV, 11 KV Feeders & LT lines of Lakhwar MPP, Dakpathar, Dehradun
362. PDD- 07/2024-25 27-08-2024 23-09-2024 Dehradun Office of the Executive Engineer (Project Distribution Division), Dakpathar, Dehradun Executive Engineer Annual contract for operation of 11/0.4 kV Substation No-03 under Project Distribution Division, Dakpathar
363. 19/EE(Pathri)/2024-25 07-09-2024 21-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual maintenance works of Unit 1 & 2 of Pathri Power House.
364. 15/EE(Pathri)/2024-25 02-09-2024 21-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Protection work of machines on turbine pit level high.
365. CH(Maint.)-25/2023-24 31-08-2024 21-09-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Procurement of Polymeric Material bushes for Capital works of Unit No. 02 at Chibro Power Station
366. 12/EE(Pathri)/2024-25 31-08-2024 21-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Providing and application of Cold Galvanizing/Zinc Rich Coating on Structures of 66 kV Switchyard
367. 11/EE(Pathri)/2024-25 31-08-2024 21-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repairing & Rewinding of different types of motors.
368. 10/EE(Pathri)/2024-25 31-08-2024 21-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Removal of Silt from Up-stream, Down-stream, By-pass gates galleries & Fore bays.
369. 14/EE(M)/MB-II/24-25 31-08-2024 21-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Maintenance for HydroMechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months
370. 12/EE(M)/MB-II/24-25 31-08-2024 21-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of special T & P items for Dharasu Power House, MB-II Uttarkashi
371. 11/EE(M)/MB-II/24-25 31-08-2024 21-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of spares for Turbines at Dharasu Power House, MB-II Uttarkashi.
372. 15 /EE (M)/MB-II/2024-25 31-08-2024 21-09-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Servicing and Overhauling of High Pressure, Low Pressure and General Purpose Air Compressor at Dharasu Power House, M.B.-II, Uttarkashi.
373. 02 EE(Test)/GV/2024-25 22-08-2024 21-09-2024 Haridwar Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar Executive Engineer SITC of 11Kv Metering and Protection CTs &PTs for Generators & SITC of Excitation Metering CT& Energy meter work at Chilla Power House , Pauri Garhwal
374. 18/EE(Pathri)/2024-25 06-09-2024 19-09-2024 Bahadrabad Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Supply & Application of coating material over the surface of stay vanes of Unit no.1 of Power House
375. 17/EE(Pathri)/2024-25 06-09-2024 19-09-2024 Bahadrabad Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repairing & Maintenance of Trash Rack Screens of Power House.
376. 16/EE(Pathri)/2024-25 06-09-2024 19-09-2024 Bahadrabad Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Inspection & Testing of various equipment & T&P of Pathri Power House
377. 02/EE(Test)/DKN/2024-25 29-08-2024 19-09-2024 Dhakrani Office of Executive Engineer (Test), Dhakrani Executive Engineer Providing the Internet at various locations
378. 08/EE(Maint.)/Khodri/2024-25 05-08-2024 19-09-2024 Dehradun Office of Executive Engineer (Maintenance), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Wear and Abrasion coating on Spiral casing inner surface at Unit No. 02 of Khodri Power Station
379. 09/EE(Maint.)/Khodri/2024-25 28-08-2024 18-09-2024 Dehradun Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Capital maintenance of 30 MW Hydro Generator Unit No.2 of Khodri Power Station
380. 04/SPH/2024-25 23-08-2024 18-09-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and of Unit 1 with sealing and shifting of draft tube gates and sealing of intake gates and associated works of Sharda Power House, Lohiahead
381. 16/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 23-08-2024 18-09-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Refurbishment of JE Club at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi.
382. 04/EE(E&M)/AB/ (2024-25) 28-08-2024 17-09-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer AMC of STP for a period of one year at Asan Barrage, Dhalipur.
383. 06/2024-25/EE(C)/Pashulok Barrage 18-08-2024 17-09-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Enhancement of Instrumentation of Virbhadra Barrage at Pashulok, Rishikesh
384. 14/EE(Pathri)/2024-25 02-09-2024 16-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repairing & overhauling of 12 nos. Intake Gates.
385. 13/EE(Pathri)/2024-25 02-09-2024 16-09-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Repairing of valves of different types of auxiliaries (including supply of various types of valves)
386. 12/EE(M)/RPSK/2024-25 30-08-2024 13-09-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Coating on under water parts of unit-03
387. 10/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-08-2024 13-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Repair and Reconstruction Work of drains in Type-IInd residential area at Hydel Colony Kalagarh
388. 05/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 13-09-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Annual Routine Maintenance of Electro-Mechanical and Hydro Mechanical Equipment of barrage including sweeping and cleaning for the year 2024-25
389. 06/EE(G)/Chilla/2024-25 23-08-2024 12-09-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Preventive Maintenance works of 36 MW Generator and associated equipment of Three Units of Chilla Power House.
390. 10/EE(H.Q.)/2024-25 22-08-2024 11-09-2024 Dehradun Office of the Executive Engineer (H.Q.), UJJWAL, Maharani Bagh, Dehradun Executive Engineer CANTEEN Work AT UJVNL “UJJWAL” MAHARANI BAGH, GMS ROAD, DEHRADUN
391. E-CH (Maint.) - 24/2024-25 21-08-2024 11-09-2024 Dehradun Office of Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing of damaged draft tube gate 1 set (Top & Bottom) at Chibro Power Station
392. E-CH (Maint.) - 23/2024-25 21-08-2024 11-09-2024 Dehradun Office of Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Capital Maintenance Work of 60 MW Hydro Turbine, Generator and Associated Equipment’s of Unit # 2 at Chibro Power Station
393. 05/EE(Test)/DKP/2024-25 22-08-2024 10-09-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Hiring of diesel vehicle (6+1-Seater) non-AC with driver for Test Unit, Dakpathar.
394. 09/EE(G)/CPH/2024-25 09-08-2024 10-09-2024 Chibro Chibro Executive Engineer Miscellaneous work of 4x60 MW Generator at Chibro Power House as & when required basis
395. 01/2024-25/EE(HM-I)/CD&H, Rishikesh 20-08-2024 10-09-2024 Dehradun For and on behalf of UJVN Limited, Executive Engineer (HM-I), CD&H, Pashulok, Rishikesh, Dehradun Executive Engineer Hiring of one no. light non-AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for DGM(CD-II) CD&H Office Dehradun
396. 07/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 10-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual Horticulture Maintenance, Development of Lawns and Clearing grass at Sharda Power House, Lohiahead for the year 2024-25
397. 06/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 10-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual General Cleaning work of Lohiahead colony for the year 2024-25
398. 04/EE(E&M)/PB/2024-25 17-08-2024 09-09-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Manufacturing & Providing of Spares of Barrage gates at Virbhadra Barrage, Rishikesh
399. 03/SPH/2024-25 16-08-2024 09-09-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual Maintenance (Generator & Electrical auxiliaries) of Unit # 1, 2 & 3 of Sharda Power House Lohiahead, Khatima
400. 01(GH)/EE (E&M-III)/Lakhwar/ 2024-25 17-08-2024 09-09-2024 Dehradun Office of the EE (E&M-III), Lakhwar, UJVN Ltd, Dakpathar (Dehradun) EE (E&M-III) Consultancy work to conduct feasibility study for Pilot Plant of Green Hydrogen Energy Generation
401. 01/EE(E&M - ISO)/2024-25/IMS 16-08-2024 09-09-2024 Dehradun Office of the Executive Engineer (E&M-ISO), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Consultancy services for ReCertification of Integrated Management System (ISO 9001:2015, 14001:2015, 45001:2018) in UJVN Ltd. for Phase-I, II, III, IV, V of UJVN Ltd.
402. 03/EE(E&M)/AB/ (2024-25) 18-08-2024 07-09-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Operation of TRCM for a period of one year at Asan Barrage, Dhalipur (Dehradun)
403. 02/EE(E&M)/AB/ (2024-25) 18-08-2024 07-09-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Caulking of Barrage Gates at Asan Barrage, Dhalipur, Dehradun .
404. 14/EEM/2023-24 17-08-2024 07-09-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of various fasteners for Units of Chilla Power House
405. 13/EEM/2023-24 17-08-2024 07-09-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of Miscellaneous Consumable Items for Units of Chilla Power House
406. 08/EE(Gen)/Khodri/2024-25 17-08-2024 06-09-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Annual Preventive Maintenance ofGenerator of Unit No. 1 at Khodri Power Station
407. 07/EE(M)/2024-25 14-08-2024 06-09-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Refilling of nitrogen cylinder
408. 06/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Installation, Testing, and Commissioning of 12 Nos. Potential Transformer including interfacing with existing control and protection scheme and dismantling of existing Capacitive Voltage Transformer installed at MB-II, Dharasu Power House
409. 05/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Strengthening of earthing and foundation of various 220 KV equipment installed at switchyard of MB-II Dharasu Power House.
410. 04/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Partial discharge Testing of Transformer at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi (Uttarakhand).
411. 03/EE (GEN)/MB-II/2024-25 14-08-2024 06-09-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Testing of Transformer Oil at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi (Uttarakhand).
412. CH(M)-21/2024-25 03-08-2024 06-09-2024 Chibro Chibro Executive Engineer छिबरो विद्युत गृह के सेंट्रल स्टोर परिवहन अनुभाग के लिए अग्रिमक यंत्रों की आपूर्ति
413. 01/EE(E&M)/Maneri Dam/2024-25 13-08-2024 05-09-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer SITC of SCADA based real time level monitoring sensor for dam gallery seepage water pit at Maneri Dam, Uttarkashi
414. 10/EE(G)/CPH/2024-25 14-08-2024 04-09-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Polishing, Mirror machining work of spare Thrust Collar & Mirror Disk assembly for Unit 1 & 3 at Chibro Power Station
415. 15/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 14-08-2024 04-09-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Renovation of AE club at Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi.
416. 14/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 14-08-2024 04-09-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Finishing work of newly constructed Saraswati Vidya Mandir inter college at Shaktipuram Colony, MB-II, Chinyalisaur.
417. 11/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Repair & Maintenance of D, F, FH and LCT-Type Residences at Dakpathar Colony, Dakpathar, Dehradun
418. 14/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Repair & Maintenance of CT-Type, P-Type, E and CPT-Type residences at Dakpathar Colony, Dakpathar, Dehradun
419. 13/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil maintenance & repair works of A-Type, LA-Type & PIV-Type residences at Dakpathar Colony, Dakpathar Dehradun
420. 12/EE/PCM-DKP/TN/2024-25 12-08-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of stores, workshops and other non-residential buildings at Dakpathar, Dehradun
421. 02/EE(CM)/DDN/2024-25 29-07-2024 04-09-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive annual maintenance of Firefighting, Fire alarm detection, public address system and related electrical works at the New corporate office building Ujjwal Maharani Bagh G.M.S. Road Dehradun.
422. 07/EE/PCM-DKP/TN/2024-25 06-07-2024 04-09-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Dakpathar Barrage, Dakpathar, Dehradun.
423. 03 /EE(E&M)/Ichari dam/ 2024-25 13-08-2024 03-09-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Annual contract for Operation & Maintenance of LT panels, DG set and lighting system of Ichari Dam in District Dehradun
424. 02 /EE(E&M)/Ichari dam/ 2024-25 13-08-2024 03-09-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Annual cleaning of trash rack including disposal of trash at Ichari Dam in District Dehradun.
425. 04/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 03-09-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Shifting of 11kV MVCC HRT Line near Vikas Bhawan, Ladari, Uttarkashi
426. 03/EE(E&M)/MB-II/Barrage/2024-25 13-08-2024 03-09-2024 Joshiyara The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Supply and Repairing of Bi-Directional Sirens at Joshiyara barrage, Uttarkashi
427. 05/EE (Civil)/ Lohiahead/ Khatima/ 2024-25 09-08-2024 02-09-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual M & R work of Sharda Power House, Lohiahead for the year 2024-25
428. 09/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 09-08-2024 02-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Interior Painting in Type-III residences and Aluminum Painting work over APP on the roofs of Type- I, II, III & IV residences at Hydel Colony Kalagarh
429. 08/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 09-08-2024 02-09-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Type – I & Type- A Residences at Hydel Colony Kalagarh
430. 10/EE (M)/MB-II/2024-25 08-08-2024 31-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual/Capital Maintenance of Machine No 1,2,3,4 of Dharasu Power House for the Year 2024-25
431. 08e/EE(G)/CPH/2024-25 09-08-2024 30-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual Contract for operation of 33/11kV Sub Station and maintenance of 11kV lines (44KM approx) at Chibro Power House
432. CH (Maint.) – 22/2024-25 08-08-2024 30-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply of Self Lubricating Guide Vane Bushes (Top, Middle) and Lip Seal of 60 MW Machines at Chibro Power Station.
433. 11/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Runner Servo Tube Assembly for Units of Chilla Power House.
434. 10/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer O&M & Repairing and Maintenance works of Three Phase Induction Motor at Power House
435. 09/EEM/2024-25 09-08-2024 30-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Removal of silt from drainage/dewatering gallery nearby area at Power House
436. 03/EE(E&M)/DKP BRG/2024-25 02-08-2024 30-08-2024 Dakpathar Dakpathar Executive Engineer Safety audit/Inspection of various equipment of Dakpathar barrage, Distt-Dehradun.
437. 03/EE(Civil-I)/LMP/2024-25 18-07-2024 30-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Providing services for Site Offices of Lakhwar MPP
438. 01/EE(Civil-I)/LMP/2024-25 18-07-2024 30-08-2024 Dakpathar (Dehradun), Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Cleaning, Up-keeping, Gardening and minor repair works of Lakhwar Bhawan-I at Dakpathar (Dehradun).
439. 09/2024-25/EE(C-M)Vyasi Project 07-08-2024 29-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of community shed at Gram Panchayat Bhaler (Nakor), Vikasnagar, Dehradun
440. 13/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-08-2024 29-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Restoration of Damage Pulley Foundation at draft tube floor of Dharasu Power House Complex at Dharasu, Uttarkashi.
441. 12/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 06-08-2024 29-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Miscellaneous civil works at various location of Shaktipuram colony, MB-II project, Chinyalisaur, Uttarkashi.
442. 09/EE (M)/MB-II/2024-25 07-08-2024 28-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House.
443. 08/2024-25/EE(C-M)Vyasi Project 05-08-2024 28-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Repair, Maintenance & Strengthening of existing approach road from Barwala Lakhwar road to surge shaft (chainage 0.00 – 930.00 m) and internal road from Guard room to BL road via Hathiari sub – station (chainage 0.00- 300 m) of Vyasi HEP (2X60 MW) at Hathiyari, Dehradun
444. 06/UJVNL/EE(M&G)/KPS/2024-25 03-08-2024 28-08-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Hiring of one no. non AC Jeep (Bolero plus /TUV 300) (7-seater, Model 2021 or later) along with driver for one year.
445. 07/EE(HQ)/2024-25 29-07-2024 28-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Providing Manpower services for a period of one year on outsource basis for UJVNLtd. Head Office at Dehradun
446. 04/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer (M&G) Procurement of ABB make LT spares for different equipment
447. 03/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer (M&G) Fabrication and fixing of M.S Jali (Foldable type) at Intake and Penstock Gallery side
448. 02/EE/M&G/DLR/2024-25 06-08-2024 27-08-2024 Dhalipur Office of the Executive Engineer (M&G) Executive Engineer(M&G) Hiring of one no. non-AC diesel light motor vehicle along with driver for one year
449. e-06/EE(M&G)/DKN/2024-25 03-08-2024 27-08-2024 Dhakrani Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Annual Maintenance Contract for various O&M activities at Dhakrani Power Station.
450. 09/EE(Pathri)/2024-25 05-08-2024 27-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Cleaning, Repairing & Overhauling of 02 nos. Generators & 12 nos. Generator Air Coolers of Pathri Power House.
451. 05/Executive Engineer (HQ)/2024-25 25-07-2024 27-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Miscellaneous Civil work at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun
452. 07/EE(Maint.)/Khodri/2024-25 25-07-2024 27-08-2024 Khodri Khodri Executive Engineer Safety audit of power house equipments of Khodri Power Station, khodri
453. 03/EE(E&M-SHP)/Kaliganga-II/2024-25 24-07-2024 27-08-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Design, drawing with detail engineering of MIV pit dewatering system and modification of existing open loop cooling water system to close loop cooling water system for Kaliganga-II SHP (2x2.25 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
454. 09/Executive Engineer (HQ)/2024-25 05-08-2024 26-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Annual maintenance, cleaning and upkeep of buildings at “UJJWAL” campus at Dehradun
455. 01/EE(M)/2024-25 05-08-2024 26-08-2024 Dehradun Office of the Executive Engineer (Monitoring) “Üjjwal”, GMS Road, Dehradun Executive Engineer Preparation of petitions for true up of FY 2023- 24, Annual Performance Review (APR) for FY 2024-25 and Multi Year tariff for the Control Period from FY 2025-26 to FY 2029-30 along with Business Plan for the control period of (05) Five financial years from April 1, 2025 to March 31, 2030 of UJVN Limited
456. 01/EE(M)/2024-25 04-08-2024 25-08-2024 Dehradun Office of the Executive Engineer (Monitoring) “Üjjwal”, GMS Road, Dehradun Executive Engineer Preparation of petitions for true up of FY 2023- 24, Annual Performance Review (APR) for FY 2024-25 and Multi Year tariff for the Control Period from FY 2025-26 to FY 2029-30 along with Business Plan for the control period of (05) Five financial years from April 1, 2025 to March 31, 2030 of UJVN Limited
457. 12/EEM/2024-25 09-08-2024 24-08-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for DGM (HGC), Chilla
458. 05/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Strengthening of Firefighting Hydrant system
459. 04/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of one No. Non-AC Diesel Vehicle for DGM HGC Dhakrani on annual contract basis.
460. 03/EEM&G)DKN/2024-25 02-08-2024 24-08-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Maintenance Contract for Grass Cutting & Gardening activities
461. 06/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Repairing, Servicing and Overhauling of 66KV Isolators & Earth Links at Mohammadpur Power House
462. 05/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Application of Cold galvanizing/zinc rich coating on structures of 66KV switchyard of Mohammadpur Power House
463. 04/EE(MPH)/2024-25 02-08-2024 24-08-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Servicing & repairing of 27.5 TR, Ductable AC, Hitachi make at Mohammadpur Power House
464. 08/Executive Engineer (HQ)/2024-25 03-08-2024 23-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Annual Operation, maintenance, cleaning and upkeep of UJVN Ltd transit accommodation at Mussoorie, Dist.-Dehradun
465. 05/EE(Generation)/Vyasi/2024-25 02-08-2024 23-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Installation, Testing and Commissioning of 250KVA (11KV/440V) Transformer and LT distribution board with 11 KV cabling in Surge Shaft Area of Vyasi HEP.
466. 02/EE(E&M)/Dharchula/2024-25 27-07-2024 23-08-2024 Dharchula Office of the Executive Engineer (E&M), UJVN Limited, Dharchula, District Pithoragarh Executive Engineer (E&M) Repairing and protection work of 33 KV power evacuation line and 3 phase 4 wire LT line of 2x2.5 MW Suringad Stage-II SHP
467. 01/UJVNL/EE(C-SBR)/2024-25 26-07-2024 23-08-2024 Pithoragarh Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh Executive Engineer Hiring of one number diesel driven small vehicle for 12 months alongwith driver for Executive Engineer (Civil), SBR Project, UJVN Ltd., Munsiyari in distt. Pithoragarh.
468. 06/EE(Maint.)/Khodri/2024-25 25-07-2024 23-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Modification, Rectification and overhauling Work of 115/25Ton EOT Crane (Make- jessop) at khodri Power Station.
469. 07/EE(G)/CPH/2024-25 31-07-2024 22-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual maintenance of 60 MW generator & associated equipment of unit 1 & 4 at Chibro Power House
470. 05/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Office of Executive Engineer (E&M), Dakpathar Barrage Executive Engineer Repairing of various types of LED luminaries installed at Dakpathar Barrage
471. 04/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Dakpathar Executive Engineer Annual maintenance contract for barrage control and monitoring systems of Dakpathar Barrage
472. 02/EE(E&M)/DKP BRG/2024-25 02-08-2024 22-08-2024 Dakpathar Dakpathar Executive Engineer Refilling of various types of Fire Extinguishers at Dakpathar barrage, Distt-Dehradun
473. 07/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Application of insulation epoxy coating on floor areas of Electric panels located at different place at Khodri Power Station.
474. 06/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Annual Preventive Maintenance of Generator of Unit No. 3 & 4 at Khodri Power Station.
475. 05/EE(Gen)/Khodri/2024-25 01-08-2024 22-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply and Replacement of different type of valves of cooling lines of Khodri Power Station.
476. 06/EE(M)/2024-25 31-07-2024 22-08-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Supply of different gate valves for power house
477. 02/EE(Civil-SHP)/Dharchula/2024-25. 14-06-2024 22-08-2024 Dharchula Office of the Executive Engineer (Civil-SHP), UJVN Ltd., Dharchula Executive Engineer “Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) for 12 months along with driver for Dy. General Manager (E&M-SHP), UJVNLtd., Pithoragarh.:”
478. 02/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) Supply, Installation, Testing, Commissioning & Net metering work of 12 kW Grid connected roof top Solar Power Plant on General Manager (Ganga) Office, UJVN Ltd, Mayapur, Haridwar.
479. 05/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 4 KW Roof Top Solar Power Plant at Office of DGM, Dhakrani
480. 04/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 8 KW Roof Top Solar Power Plant at Training Centre, Dhakrani
481. 03/EE(Solar)/2024-25 31-07-2024 21-08-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun EE (Solar) 8 KW Roof Top Solar Power Plant at Adhikari Avagaman Shivir, Dhakrani
482. 01/EE (Civil-I)/Urgam/2024-25 25-07-2024 21-08-2024 Srikot-Srinagar Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Annual Repair & Maintenance work of Civil structures at Urgam SHP (2X1.5) MW in Distt- Chamoli
483. CH(Maint.)-20/2024-25 30-07-2024 20-08-2024 Executive Engineer Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance Works of Unit no 01 at Chibro Power Station
484. CH(Maint.)-19/2024-25 30-07-2024 20-08-2024 Executive Engineer Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Miscellaneous repair & maintenance works of auxiliary systems of 60 MW Turbine of Chibro Chibro Power Station
485. 10/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Repairing & Overhauling of OPU System of unit-2 and unit-3
486. 09/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Fabrication, Supply and Installation of runner cones
487. 07/2024-25/EE(C-M)Vyasi Project 29-07-2024 20-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance) Executive Engineer (Civil-Maintenance) Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
488. 08/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station Executive Engineer (M) Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for Dy. General Manager (E&M) Kalagarh
489. 07/EE(M)/RPSK/2024-25 28-07-2024 20-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station Executive Engineer (M) Hiring of one no. diesel driven AC LMV alongwith driver for the office of the GM (R&S) for a period of one year
490. 10/EE/PCM-DKP/TN/2024-25 29-07-2024 20-08-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Treatment of Right Side Hill Slope and Strengthening of Fencing of Surge Tank at Khodri Power House, Khodr
491. 09/EE/PCM-DKP/TN/2024-25 29-07-2024 20-08-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of Escape Channel & Spilling Surge Shaft Structures of Khodri Power House, Khodri
492. 03/EE/PCM/Dhalipur/ 2024-25 22-07-2024 20-08-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damaged structures of Syphon located at km 3.25 and km 3.68 of power Channel between Asan Barrage to Kulhal Power House
493. 02/EE (Civil-I)/Urgam/2024-25 03-08-2024 17-08-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Restoration work at Forebay Escape pipe and allied work at Urgam SHP (2x1.5 MW) in Distt. Chamoli
494. 04/EE/PCM/Dhalipur/ 2024-25 03-08-2024 17-08-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Construction of Transformer Foundation & Rail Line Laying work at Dhalipur Power House Switch-Yard, Dhalipur, Dehradun
495. 09/EE(G)/Klg/2024-25 27-07-2024 17-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Cleaning, repair and testing of Hydro Generator coolers of unit No 1, 2 & 3
496. 08/EE(G)/Klg/2024-25 27-07-2024 17-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal)27 Executive Engineer Refilling of fire extinguishers including supply of accessories.
497. 05/EE(M)/2024-25 27-07-2024 17-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Repair & maintenance of 33 KV transmission line between Tiloth & Heena substation
498. 04/EE(Test)/DKP/2024-25 26-07-2024 16-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Arrangement of 220V DC redundant supply for feeder no.83 & 84 and bus coupler in Switchyard at Chibro Power House
499. 01/EE/M&G/DLR/ 2024-25 26-07-2024 16-08-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer Hiring of one no. (27-seater) School Bus and one no. School Van (10-Seater) for Academic year 2024-25 & 2025-26.
500. 04/EE(M)/2024-25 26-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Annual sweeping cleaning & bush cutting work of different substations
501. 03/EE(M)/2024-25 26-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Removal and disposal of wet silt form various places of power house
502. 01/EE(CM)/DDN/2024-25 26-07-2024 16-08-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer M&R work of multi-storey New corporate office building of UJVN Limited at UJJWAL campus, G.M.S. road, Maharani Bagh, Dehradun
503. 11/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 23-07-2024 16-08-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and maintenance of rooms and other miscellaneous works at Officer’s field hostel, Shaktipuram colony, MBII Chinyalisaur.
504. 08/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 16-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual upkeeping & cleaning of Badminton Court/ Multipurpose Hall at Shaktipuram colony Chinyalisaur Uttarkashi.
505. 03/EE(Test)/DKP/2024-25 25-07-2024 14-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Replacement of current transformer 2000/5A on 11 kV generator side busbar at Khodri Power Station.
506. 02/EE(Test)/DKP/2024-25 25-07-2024 14-08-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Supply and fixing of insulation mat around LV and HV panels in Khodri and Chibro Power Station.
507. 05/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Annual maintenance work related to turbine & associated parts of Unit No. 3&4 of Khodri Power Station
508. 04/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer SITC of 25 H.P. VT Pump with Motor at Khodri Power Station
509. 03/EE(Maint.)/Khodri/2024-25 25-07-2024 14-08-2024 Khodri Office of Executive Engineer (Maint.), Khodri Power House Executive Engineer Supply and Fixing of Rubber Seal in 02 Nos. Surge Tank Gates of Khodri Power Station
510. 04/EE(Generation)/Vyasi/2024-25 24-07-2024 14-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Work of Fiber Splicing & other Miscellaneous Work of Overhead OFC Line from Vyasi Power House Hathiyari to Juddo Dam Site
511. 01/EE(E&M)/Ichari dam/ 2024-25 19-07-2024 14-08-2024 Ichari dam Office of the Executive Engineer (E&M), Ichari dam Executive Engineer Safety audit of tools & equipments at Ichari Dam in district Dehradun
512. CH(Maint.) – 18/2024-25 23-07-2024 13-08-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance Works of Unit no 03 & 04 at Chibro Power Station
513. CH(Maint.)- 17/2024-25 23-07-2024 13-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Application of Coating Material on Draft Tube Chamber, Draft Tube Window & Stay vanes of Unit No. 01 at Chibro Power Station
514. 03/EE(E&M)/PB/2024-25 27-07-2024 12-08-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Electrical Maintenance of colonies and Virbhadra Barrage at Pashulok, Rishikesh
515. 06/EE(G)/CPH/2024-25 20-07-2024 12-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Detailed assessment by diagnostics & Engineering analysis for incipient fault prediction of MVA Generating Transformers at Chibro Power House
516. 05/EE(G)/CPH/2024-25 20-07-2024 12-08-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Rewiring and Installation, testing & commissioning of energy efficient LED light fixtures by replacing Induction light in machine hall at Chibro Power House
517. 05/UJVNL/EE (M&G)/KPS/2024-25 21-07-2024 12-08-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Annual Maintenance Contracts (AMC) for Colony Maintenance work (Elec/Mech) at Kulhal Power Station
518. 6/EE(M)/RPSK/2024-25 21-07-2024 12-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Hiring of one no. diesel driven non AC light motor vehicle for emergency duties for a period of twelve months at Ramganga Power Station, Kalagarh, Distt. Pauri Garhwal.
519. 5/EE(M)/RPSK/2024-25 21-07-2024 12-08-2024 Kalagarh Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual Maintenance of Unit-02 and 03 and Hiring of one no. non AC LMV for emergency duties at Ramganga Power Station, Kalagarh.
520. 08/EE(Pathri)/2024-25 20-07-2024 10-08-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Providing services of Divers to carry out the underwater works of Pathri Power House
521. 03/EE(Civil-II)/Guptkashi/2024-25 26-07-2024 09-08-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Operation and Monitoring of all Civil structures at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
522. 06/Executive Engineer (HQ)/2024-25 25-07-2024 09-08-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Electrical Re-wiring of Training Hall “UJJWAL” UJVN Ltd , Maharani Bagh, G.M.S. Road, Dehradun
523. 02/EE(E&M)/MB-II/Barrage/2024-25 19-07-2024 09-08-2024 Uttarkashi The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) Executive Engineer Cleaning of trash rack through Diving Team at Joshiyara Barrage Uttarkashi for the period of six months
524. 01/EE(E&M)/MB-II/Barrage/2024-25 19-07-2024 09-08-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Hiring of 02 Non-AC diesel vehicles at Joshiyara Barrage, Uttarkashi for the period of one year
525. 10/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 16-07-2024 09-08-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Miscellaneous Civil Work in BP Type Quarters at Shaktipuram colony, Chinyalisaur, Uttarkashi .
526. 04/2024-25/EE/PCM(GV)/Mayapur 18-07-2024 08-08-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Making Temp. Bund at Right Bank of Mundal Nala for the Protection from Flood at a Distance of 1.50 KM (Approx.) Upstream of Mundal Bridge.
527. 03/2024-25/EE/PCM(GV)/Mayapur 18-07-2024 08-08-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Providing Approach Road for Block-B of Type-IIIrd Residential Building at Mohammadpur
528. 04/EE(Civil-I)/LMP/2024-25 18-07-2024 08-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Maintenance of Project Roads of Lakhwar Multipurpose Project.
529. 02/EE(Civil-I)/LMP/2024-25 18-07-2024 08-08-2024 Dakpathar (Dehradun) Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer (Civil-I) Cleaning, Up-keeping and Maintaining of Kandriyan field Hostel of Lakhwar MPP
530. 08/EE (M)/MB-II/2024-25 18-07-2024 08-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of Two no. (8+1) seater, Two No. (6+1) seater and One No. Utility/Camper (Mahindra/Tata/equivalent) non- A.C. Diesel vehicles along with drivers
531. 01/EE (Civil-IV)/LMP/2024-25 23-07-2024 06-08-2024 Dehradun Office of The Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) Executive Engineer Dismantling, Shifting, Establishment and Operation of bank operated cable way based Gauge and Discharge measurement site on river Yamuna for Lakhwar Multipurpose Project
532. 07/EE(Pathri)/2024-25 16-07-2024 06-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Servicing of End Suction Type Horizontal Centrifugal Pumps of Cooling Water System & Procurement of its allied spares at Pathri Power House
533. 06/EE(Pathri)/2024-25 16-07-2024 06-08-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Supply, fabrication and fixing of G.I. drinking water pipeline at Pathri Power House
534. 07/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of spares for EHG100/G-40 Governor of Turbine at Dharasu Power House, MB-II, Uttarkashi.
535. 06/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Rewinding of Drainage Pumps of Dharasu Power House
536. 05/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Guide vane leaver assembly at Dharasu Power House
537. 04/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of Air Release Valve of 76 MW Turbine at Dharasu Power House
538. 03/EE (M)/MB-II/2024-25 15-07-2024 06-08-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of 110kw Vertical Type Dewatering Pump at Dharasu Power House, MB-II
539. e-01/UJVNL/IT/EE(EM-II)/2024-25 29-06-2024 06-08-2024 Dehradun Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Maintenance and Support of SAP ERP at UJVN Limited
540. 02/EE(Maint.)/Khodri/2024-25 15-07-2024 05-08-2024 Dehradun Office of Executive Engineer (Maintenance), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of 2 Nos. school bus for wards of UJVNL employees located at Dakpather
541. 05/EE(M)/VP/2024-25 16-07-2024 05-08-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Annual maintenance contract of hydro-mechanical gates of Vyasi Power House at Hathiyari
542. 03/2024-25/EE(C-M)Vyasi Project 09-07-2024 05-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Seepage treatment by Polyurethane grouting at different areas/locations inside Power House building of Vyasi HEP at Hathiyari, Dehradun
543. 06/2024-25/EE(C-M)Vyasi Project 19-07-2024 02-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Dy. General Manager (Civil-Maintenance), Vyasi HEP Dakpathar, Dehradun for period of one year
544. CH (Maint.) – 16/2024-25 12-07-2024 02-08-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Procurement of various Rubber consumables for 60 mw machines of Chibro Power Station
545. 07/EE(G)/Klg/2024-25 11-07-2024 02-08-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal), Executive Engineer Annual Maintenance Contract for Routine Maintenance Activities
546. 03/EE(Generation)/Vyasi/2024-25 12-07-2024 02-08-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Establishment of workshop and site store for Generator section at Vyasi Hydro Power Station (2x60MW), Hathiyari (Dehradun)
547. CH(Maint.)-12/2024-25 02-07-2024 02-08-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of School Bus with Driver and Attendant for St. Mary’s Convent School, Vikasnagar.
548. PDD-06/2024-25 13-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Supply and Repairing of 60 Watt LED Street Lights.
549. PDD-05/2024-25 13-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Annual Contract for operation of 11/0.4 KV Sub Station No-01 Tons Colony Dakpathar
550. 05/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of damaged pathway to cremation place & platform for cremation for Vyasi HEP affected village Dindal & Gaski on the right bank of river Yamuna at Juddo, Dehradun
551. 05/EE(E&M)/Vyasi Dam/2024-25 12-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Annual Running & Maintenance of 05 KLD sewage Treatment Plant (STP), MBBR Based Technology at Vyasi Dam, Juddo Dist- Dehradun.
552. 01/EE (GC)/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Hiring of one No. Covered body light diesel vehicle (M&M Make Bolero or equivalent) along with driver on rent basis for 12 months for Executive Engineer and Assistant Engineer as pool vehicle for Galogi SHP and office, Ganga Bhawan, Dehradun
553. 05/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of damaged pathway to cremation place & platform for cremation for Vyasi HEP affected village Dindal & Gaski on the right bank of river Yamuna at Juddo, Dehradun
554. 05/EE(E&M)/Vyasi Dam/2024-25 12-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Annual Running & Maintenance of 05 KLD sewage Treatment Plant (STP), MBBR Based Technology at Vyasi Dam, Juddo Dist- Dehradun
555. 04/2024-25/EE(C-M)Vyasi Project 10-07-2024 01-08-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of shed for Mata Vaishno Devi Temple at Vyasi project affected village Juddo
556. 04/EE(Gen)/Khodri/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Re-tubing of Generator Air coolers (05 Nos.) of Unit # 2 at Khodri Power Station
557. 03/EE(Gen)/Khodri/2024-25 11-07-2024 01-08-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Heavy Duty Hydrophobic Water & Moisture Displacer Protective Coating in 33 KV Panel along with other related work in 33KV breaker panel at Khodri Power Station
558. 03/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of services of Divers to carry out the underwater works of Power House
559. 02/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of one no. diesel vehicle (along with driver’s services) for official use of Executive Engineer and one no. driver for running of departmental ambulance for a period of one year.
560. 01/EE(MPH)/2024-25 16-07-2024 31-07-2024 Haridwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan, Haridwar Executive Engineer Hiring of One non AC Vehicle for School going Children and Power house/office works at Mohammadpur Power House for one year
561. PDD-04/2024-25 12-07-2024 31-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Hiring of one no. diesel driven vehicle (Mahindra Bolero Camper/Tata Xenon Crew with cabin or equivalent) along with driver (02 Nos.) for one year.
562. PDD-03/2024-25 12-07-2024 31-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer Hiring of one no. diesel driven vehicle (Mahindra Bolero Plus/TUV-300 or equivalent) along with driver for one year.
563. 09/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 31-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hiring of one number Bolero or equivalent Non AC Diesel Vehicle (Model 2021 and onwards) along with driver for site supervision under E.E.( Civil) Division of MB-II, Chinyalisaur for the period of 12 months
564. 07/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 09-07-2024 31-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Laying of Cement concrete approach pathway from central store to neri village at Dharasu Power House, MB-II, Dharasu, Uttarkashi.
565. 01/EE-II (E&M)/LP/2024-25 25-06-2024 31-07-2024 Dakpathar Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar Executive Engineer-II SITC of Internet Networking at New Office Building Lakhwar Bhawan-II Dakpathar, Dehradun
566. 05/2024-25/EE(C)/Pashulok Barrage 10-07-2024 30-07-2024 Rishikesh Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of Type-B, Type-C & Type-D Residences at Barrage Colony, Pashulok, Rishikesh.
567. 04/2024-25/EE(C)/Pashulok Barrage 10-07-2024 30-07-2024 Rishikesh Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of Type-A Residences at Barrage Colony, Pashulok, Rishikesh.
568. 08/EEM/2024-25 08-07-2024 29-07-2024 Chilla Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Enginee Repair of Drainage & Dewatering Pumps of Power House.
569. 04/Executive Engineer (HQ)/2024-25 06-07-2024 29-07-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Excavation, supply, installation of items for Rain Water Harvesting at UJJWAL campus, Maharani Bagh, G.M.S. Road, Dehradun
570. 08/EE/PCM-DKP/TN/2024-25 06-07-2024 29-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair of Khodri Power House and allied structure at Khodr
571. 02/EE(E&M-SHP)/Kaliganga-II/2024-25 04-07-2024 29-07-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi, Executive Engineer Annual Operation and Maintenance of Kaliganga-II SHP (2x2.25 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag.
572. 07/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual General Cleaning work of Hydel Colony Kalagarh
573. 06/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M&R work of Type-III & IV residences at Hydel Colony Kalagarh
574. 05/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 03-07-2024 29-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual Horticulture Maintenance and Development of Park at Ramganga Power House Kalagarh
575. 01/EE (M)/MB-II/2024-25 24-06-2024 29-07-2024 Uttarkashi office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing of TGB Housings of 76 MW Turbines at Dharasu Power House, Uttarkashi
576. 04/UJVNL/EE(M&G)/KPS/2024-25 20-07-2024 27-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Cleaning of drain water sump, sealing water tank, penstock gallery flushing of cooling water strainer and Bye pass gate charging pit for the period of one year of Kulhal Power House
577. CH(Maint.)-15/2024-25 05-07-2024 27-07-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Fixing of various valves of Machine # 2 at Chibro Power Station
578. 03/Executive Engineer (HQ)/2024-25 05-07-2024 27-07-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Construction of Boundary wall and Drain near new corporate Building at UJJWAL campus, Maharani Bagh, G.M.S. Road, Dehradun
579. 01/EE(E&M-SHP)/KG-II/2024-25 02-07-2024 27-07-2024 Guptkashi Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi Executive Engineer Supply, Installation, Testing and Commissioning of 250 KVA, (320-480/415±1% V) Copper Wound Constant Voltage Transformer (Servo) for Kaliganga-II SHP (2x.25 MW+15%COL) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
580. 03/EE (E&M)/(SHP)/Rishikesh/2024-25 29-06-2024 27-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Annual Operation and Maintenance for RPN SHP (2x750kW) Dunao, in District- Pauri Garhwal, Uttarakhand
581. 01/EE(Civil-SHP)/Dharchula/2024-25. 14-06-2024 27-07-2024 Dharchula Office of the Executive Engineer (Civil-SHP), UJVN Ltd., Dharchula Executive Engineer “Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) as pool vehicle for 12 months along with driver for the office of Executive Engineer (Civil-SHP), UJVNLtd., Dharchula .”
582. 01/EE(E&M)/AB/2024-25 12-07-2024 26-07-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Cleaning of Trash Rack at Asan Barrage, Dhalipur for a period of one year.
583. 02/EE(Gen)/Vyasi/24-24 11-07-2024 26-07-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Development & Maintenance of Garden and Operation of Canteen at Vyasi Power House.
584. 06/EE/PCMDKP/TN/2024-25 04-07-2024 26-07-2024 Dehradun Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Sweeping, cleaning & upkeep works of Vidyut Bhawan, Project Distribution Division Office & Project Civil Maintenance-Dakpathar Office at Dakpathar, Dehradun.
585. 05/EE/PCM-DKP/TN/2024-25 04-07-2024 26-07-2024 Dehradun Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Hiring of one number diesel vehicle such as Mahindra Bolero or equivalent (excluding fuel) as a pool vehicle without driver for Project Civil Maintenance Dakpathar.
586. 01/EE(Test)/DKP/2024-25 05-07-2024 26-07-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Hiring of diesel vehicle (6+ 1) seater (Non AC) with driver “for one year”
587. 06/EE(G)/Klg/2024-25 04-07-2024 26-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Complete overhauling of Generator Transformer cooling systemalongwith supply & fixing of water cooling pipeline of all threeunits
588. 05/EE(G)/Klg/2024-25 04-07-2024 26-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Mainexciter, PMG, stator core, air cooling ventilating duct, 11KV busduct & Generator transformer of Unit # 3
589. 01/EE(E&M)/(SHP)/RISHIKESH/2024-25 24-06-2024 26-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Supply of safety items for RPN SHP Dunao, District Pauri Garhwal, Pilangad SHP. District Uttarkashi, Urgam SHP, District Chamoli .
590. 01/EE(E&M)/DKP BRG/2024-25 05-07-2024 25-07-2024 Dakpathar Dakpathar Executive Engineer Hiring of one number non-AC Diesel vehicle (Mahindra Bolero Plus or equivalent) along with driver for Dakpathar Barrage, Dakpathar, Dehradun (excluding the cost of fuel) on contract basis for one year.
591. e-02/EE(M&G)/DKN/2024-25 03-07-2024 25-07-2024 Dehradun Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Hiring of vehicles for school going children of employees posted at Dhakrani Power Station
592. 04/EE/PCM-DKP/TN/2024-25 03-07-2024 25-07-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Hydel Colony, Old Yamuna Colony, New Yamuna Colony, main road from Dakpathar Tiraha to New Yamuna Colony and by pass road from Tikona Park to main gate of Play Ground near Barrage at Dakpathar, Dehradun
593. 03/EE/PCM-DKP/TN/2024-25 03-07-2024 25-07-2024 Dakpathar Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Tons Colony, Gole Market Colony, Colony Behind Post Office and main road from Dakpathar Bus Station to main gate of play ground near Barrage via Nehru Market and GMVN at Dakpathar, Dehradun
594. 02/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 25-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer Annual Operation, Cleaning & Up-keeping of Staying Facility and Office of Executive Engineer (Civil), UJVN Ltd. at Sharda Power House, Lohiahead Khatima for the year 2024-25
595. 01/EE(Civil)/Lohiahead/Khatima/2024-25. 11-06-2024 25-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Hiring of Non A.C. Diesel Vehicle (Bolero or Equivalent Model 2022 or above) with Driver for Executive Engineer (Civil), Lohiahead (Khatima), for one year
596. 01/EE(Generation)/Vyasi/2024-25 03-07-2024 24-07-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer “Annual Running & Maintenance of 10 KLD Sewage Treatment Plant (STP), MBR based technology at Vyasi Power House, Hathiyari (Dehradun)
597. 05/EE(Pathri)/2024-25 02-07-2024 24-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Repair & maintenance of overhead LT Line supplying LT Power to Bypass regulator gates
598. 03/EE(Pathri)/2024-25 02-07-2024 24-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Providing & fixing of energy efficient lighting system in Pathri Power House
599. 01/EE (GEN)/MB-II/2024-25 24-06-2024 24-07-2024 Chinyalisaur Chinyalisaur Executive Engineer PROCUREMENT OF GENERATION LOG BOOK AND STATIONARY ITEMS FOR DHARASU POWER HOUSE.
600. 02/2024-25/EE(C-M)Vyasi 08-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Executive Engineer (Civil-Maintenance), Vyasi HEP Dakpathar, Dehradun for period of one year
601. 02/EE(Civil)/MB-I/TN/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual O&M of 4 KLD STP at Maneri Dam of MB-I HEP at Maneri, Uttarkashi.
602. 01/EE(Civil)/MB-I/TN/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi Executive Engineer Annual maintenance and repair of Maneri Dam Complex at Maneri, Uttarkashi.
603. CH(Maint.)-14/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of Pool vehicle 7-seater (Mahindra Bolero/TUV 300/Eq.) with driver for sites under DGM(HGC) Dakpathar.
604. CH(Maint.)-13/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of Vehicle (Mahindra Bolero/TUV300/Eq.) with driver for office of the EE(Maint.), Chibro Power Station.
605. CH(Maint.)- 11/2024-25 02-07-2024 23-07-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Annual Maintenance contract for the works of transport & Central Store, Chibro Power Station
606. 02/EE(M)/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi Executive Engineer Annual Operation and maintenance of water supply from tube well plant to CWR Tiloth and CWR Tiloth to Kuteti Devi Colony
607. 01/EE(M)/2024-25 02-07-2024 23-07-2024 Uttarkashi Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi Executive Engineer Hiring of 1 no. non AC diesel vehicle and 1 no. utility diesel vehicle for power house
608. 02/EE/PCM/Dhalipur/ 2024-25 01-07-2024 22-07-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damage road on right side of power channel from Court bridge to Skew bridge Dhalipur, Dehradun
609. 01/EE(Civil)/Tiuni-Plasu/2024-25 28-06-2024 22-07-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd, Dakpathar (Dehradun) Executive Engineer Sweeping, cleaning, upkeep & Civil maintenance works of office of Arakot-Tiuni & Tiuni Plasu at Dakpathar, Dehradun.
610. 01/EE(P&C)/2024-25 28-06-2024 20-07-2024 Dehradun Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun Executive Engineer Procurement of different Tubeless tyre for various Power House/Sites of UJVN LTD.
611. 04/EE(Pathri)/2024-25 28-06-2024 19-07-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Procurement of Submersible Pumps at Pathri Power House.
612. 02/EE(E&M)/(SHP)/RISHIKESH/2024-25 24-06-2024 19-07-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Hiring of one no. of non AC light diesel vehicle (M&M Bolero camper/ Double cabin or equivalent) without driver for one year on rent basis for Urgam SHP (2x1500 kW) in District Chamoli
613. 07/EEM/2024-25 27-06-2024 18-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer SITC of 3 Ton (Remote Operated) Electric hoist Crane at Central Store at Chilla
614. 04/EE(G)/CPH/2024-25 27-06-2024 18-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Re-Tubing and testing of bearing coolers for unit 2 & 4 at Chibro Powerhouse
615. 03/EE(G)/CPH/2024-25 27-06-2024 18-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Printing of various log books and supply of cartridges & stationary at Chibro Power Station
616. 01/EE(Test)/DKN/2024-25 26-06-2024 18-07-2024 Dehradun Dehradun Executive Engineer Hiring of One No. Non - AC Diesel Vehicle (Mahindra Bolero/TUV300 or equivalent vehicle model-2022 or later) for Executive Engineer (Test), Dhakrani for a period of Twelve Calendar Months
617. 01/EE(E&M)/Dharchula/2024-25 25-06-2024 18-07-2024 Dharchula Office of the Executive Engineer (E&M), Dharchula Executive Engineer Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) for 12 months alongwith driver as pool vehicle for the 2x2.5MW Suringad SHP, Munsyari, Dist.- Pithoragarh (Uttarakhand)
618. 06/EE(E&M-I)/LP/2024-25 25-06-2024 18-07-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer SITC of Video Conferencing System at Conference Room of Kandriyan Field Hostel, Lakhwar MPP, Dakpathar
619. 02/EE(E&M-II)/LP/2024-25 25-06-2024 17-07-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II Various Electrical works under Lakhwar MPP
620. 04/EE(E&M)/Vyasi Dam/2024-25 26-06-2024 17-07-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Supply, Testing & refilling of various Fire Extinguishers at Vyasi Dam Site Juddo, Dehradun
621. 05/EE(G)/2024-25 27-06-2024 16-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Cleaning of Intake Trash Rack of Chilla Power House.
622. 03/UJVNL/EE (M&G)/KPS/2024-25 25-06-2024 16-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer AMC of Hydromechanical governors installed at Kulhal Power Station along with other associated works
623. 02/EE (GEN)/MB-II/2024-25 24-06-2024 16-07-2024 Uttarkashi The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repairing and re-insulation of 1 No. rotor pole coil of 76 MW Hydro Generator, MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi
624. 06/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Graffiti wall painting work at Ramleela ground, Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi
625. 05/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Re-construction of damaged nigam boundary wall near water storage tank at Shaktipuram colony, MB-II project,Chinyalisaur,Uttarkashi.
626. 04/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Maintenance of water Supply system for residential and non- residential buildings of Shaktipuram colony Chinyalisaur, Uttarkashi
627. 03/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 21-06-2024 16-07-2024 Chinyalisaur Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Upkeeping and maintenance work of Parks at various location of Shaktipuram colony, MB-II Project, Chinyalisaur, Uttarkashi.
628. 03/EE(E&M)/Vyasi Dam/2024-25 25-06-2024 16-07-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVNLtd Executive Engineer Supply & Laying of HDPE pipe for providing Dump yard water supply at Vyasi Dam, Juddo, Dakpatthar (Dehradun).
629. CH(Maint.)- 10/2024-25 24-06-2024 15-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Refurbishment of 02 Set TGB Pads and complete dismantling, Ultrasonic Testing, Blue-Matching, Installation & Commissioning of 01 Set TGB Pads of 60 MW Francis Turbine of Chibro Power Station
630. CH(Maint.)- 09/2024-25 24-06-2024 15-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing & maintenance of 15 Ton Hoist beam of Draft Tube crane at Chibro Power Station.
631. 02/EE(M)/MB-II/24-25 24-06-2024 15-07-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement Of Coating Material For Turbine At Dharasu Power House
632. 01/EE(Civil)/KB/2024-25 22-06-2024 15-07-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special Repair of approach road from Ambari More to Dakpathar Bus stand at Dakpathar, Dehradun
633. 04/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Ramganga Power House Kalagarh
634. 03/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual Horticulture Maintenance & Development of Parks and Play Ground at Hydel Colony Kalagarh
635. 02/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 21-06-2024 15-07-2024 Kalagarh Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Annual M & R Work of Type - II Residences at Hydel Colony Kalagarh
636. 03/2024-25/EE(C)/Pashulok Barrage 22-06-2024 12-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Strengthening of Surveillance & Monitoring System for Security Supervision at Virbhadra Barrage, Rishikesh.
637. 04/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Main exciter, PMG, stator core, air cooling ventilating duct, 11KV bus duct & Generator transformer of Unit # 2
638. 03/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Repairing, cleaning & painting of 66 M.W. Generator, Main exciter, PMG, 11KV bus duct & Generator transformer of Unit # 1
639. 02/EE(G)/Klg/2024-25 20-06-2024 12-07-2024 Pauri-Garhwa Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal Executive Engineer Supply and fixing of LT power cables from Excitation Panels to Generators of Unit no. 01 & 2
640. T-06/EEM/2023-24 21-06-2024 11-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repair of Mechanical Store in Central Store at Chilla Power House.
641. T-05/EEM/2023-24 21-06-2024 11-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Rotating Shaft Sleeve for Units of Chilla Power House
642. 02/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-06-2024 11-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual sweeping & cleaning work of Shaktipuram colony premises at MB-II, Chinyalisaur, Uttarkashi
643. 01/ EE(Civil) / MB-II / Chinyalisaur / 2024-25 18-06-2024 11-07-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Civil Maintenance of Dharashu Power House Complex at Dharashu, Uttarkashi
644. CH(Maint.)-08/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Caulking of Surge Tank gate of Chibro Power Station
645. CH(Maint.)-07/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Hiring of vehicle (Mahindra Bolero/TUV 300/Eq.) with driver for office of the DGM, HGC, Dakpathar.
646. CH(Maint.)-06/2024-25 19-06-2024 10-07-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Repairing of 01 No. Francis runner at Chibro Power Station.
647. 04/EE(M)/RPSK/2024-25 20-06-2024 10-07-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual operation & upkeeping of Inspection House and Canteen at Ramganga Power Station, Kalagarh.
648. CH (Maint.)-05/2024-25 19-06-2024 10-07-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Procurement of Spares for 60 MW Francis Turbine of Chibro Power Station
649. 02/2024-25/EE(C)/Pashulok Barrage 20-06-2024 10-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual Sweeping & Cleaning Work of Barrage and New Hydel Colony at Pashulok-Rishikesh.
650. 01/2024-25/EE(C)/Pashulok Barrage 20-06-2024 10-07-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Annual M&R Works of New Hydel Colony at Pashulok, Rishikesh
651. 04/EE(G)/2024-25 20-06-2024 10-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Printing and supply of log books and stationary items.
652. 03/EE(G)/2024-25 20-06-2024 10-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Annual Cleaning & Sweeping of Chilla Power House
653. 01/EE(Civil-II)/Guptkashi/2024-25 17-06-2024 09-07-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Work of Operation and Monitoring of all Civil structures at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
654. 02/EE(G)/Chilla/2024-25 19-06-2024 09-07-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Hiring of diesel vehicle with driver for a period of one year
655. 02/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2024-25 18-06-2024 09-07-2024 Dakpathar Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Hiring of one number diesel vehicle (Mahindra Bolero/TUV 300 or equivalent) with driver for office of Executive Engineer(E&M) office, Arakot-Tiuni and Tiuni-Plasu, Projects, Dakpathar, Dehradun for one yea
656. 01/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2024-25 18-06-2024 09-07-2024 Dakpathar Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Hiring of 1 no. Diesel Vehicle Bolero/TUV 300 or Equivalent Model with Driver for DGM (E/M), Arakot Tiuni & Tiuni Plasu Dakpathar for one year
657. 01/EE(Civil)/SHP/Maneri/2024-25 14-06-2024 09-07-2024 Uttarkashi Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi Executive Engineer Annual repair & maintenance work of Pilangad (2x1125 KW) SHP in Bhatwari, Distt-Uttarkashi
658. 03/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Exterior repainting & repair of old P-III & P-II colony buildings at joshiyara Uttarkashi
659. 02/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual sweeping, cleaning, repair & Maintenance of septic tank, soak pit, sewer lines and drains in joshiyara colony Uttarkashi.
660. 1/EE(C&M)/MB-II/TN/2024-25 15-06-2024 08-07-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Annual operation & maintenance of water supply distribution system at joshiyara colony uttarkashi.
661. 01/EE(Civil)/Kalagarh/Pauri Garhwal/2024-25 14-06-2024 08-07-2024 Pauri Garhwal Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Repair & laying anti skid chequered tiles on approach road in Type-IV residences at hydel colony Kalagarh.
662. 02/EE/PCM-DKP/TN/2024-25 14-06-2024 08-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Renovation of Road from VSKC Government Degree College toPower Channel suspension bridge near Lower Lakhwar Colony at Dakpathar
663. 04/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 08-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer M&R works of residential Buildings of Lohiahead Colony for the year 2024-25
664. 03/EE( Civil)/Lohiahead/Khatima/2024-25 11-06-2024 08-07-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima Executive Engineer M&R works of Non residential Buildings of Lohiahead Colony and other miscellaneous civil works at Sharda Power House Complex for the year 2024-25
665. PDD-02/2024-25 15-06-2024 06-07-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) Executive Engineer AMC of 33 kV & 11kV Lines & other miscellaneous works
666. 01/EE(Solar)/2024-25 30-05-2024 06-07-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVNLtd, Dehradun EE (Solar) Preparation of pre-feasibility cum Detail Project Report (DPR) of Standalone Battery Energy Storage System (BESS) at various UJVNL substations near Hydro Plant
667. 01/EE(Gen.)/Khodri/2024-25 15-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Dismantling, Fabrication, Insulation and fixing of Rotor Bus Bar(D.C.) of unti No.1,2,3 &4 of 31 MVA Generator at Khodri Power Station
668. 02/EE(Gen.)/Khodri/2024-25 15-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fabrication of Iron Ramps & Iron trench covers of various sizes at Khodri Power Station, Khodri.
669. 01/EE/PCM-DKP/TN/2024-25 13-06-2024 05-07-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special Repair works of St. Mary Convent School at Dakpathar, Dehradun.
670. 02/EE(Pathri)/2024-25 13-06-2024 05-07-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for General Operation of Pump House System & other miscellaneous electrical section works in Pathri Power House.
671. 01/EE(Pathri)/2024-25 13-06-2024 05-07-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for Sweeping, Cleaning & Up-keeping of Pathri Power House.
672. 02/EE(E&M)/PB/2024-25 11-06-2024 05-07-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Hiring of diesel vehicle non-AC(Mahindra & Mahindra Bolero or equivalent) without driver for emergency conditions at VirbhadraBarrage, Pashulok Rishikesh .
673. T-04/EEM/2024-25 15-06-2024 04-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer AMC of repairing works of 150 HP VT Pump at Power House
674. 03/EEM/2024-25 15-06-2024 04-07-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Annual General Cleaning of different places, Officers Club, Guest House, Substations, Central Store and Tube well premises etc. at Chilla Power House, Chilla
675. 02/2024-25/EE/PCM(GV)/Mayapur 12-06-2024 03-07-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for Executive Engineer, PCM(GV), Mayapur-Haridwar for the Year 2024-25.
676. 01/2024-25/EE/PCM(GV)/Mayapur 12-06-2024 03-07-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for DGM(CM-GV), Mayapur-Haridwar for the Year 2024-25.
677. 01/EEM&G)DKN/2024-25 11-06-2024 03-07-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual General cleaning of Power House area, HGC offices, other offices, switchyard area & other associated areas
678. 02/EE(Civil-II)/Guptkashi/2024-25 17-06-2024 02-07-2024 Guptkashi Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi Executive Engineer Repair & Maintenance of Type-I building at Weir site of Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag
679. 01/UJVNL/EE (M&G)/KPS/2024-25 11-06-2024 02-07-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Repairing and Overhauling of Stop Log Gatewith gantry crane at Kulhal Power House
680. 04/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one no.(35 Seater) School Bus Model 2021 or later for academic session 2024-25 for one year on contract basis for transportation of school going children of Vyasi Project effected, Vyasi Project, Hathiyari.
681. 03/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for Emergency work of vyasi HEP for One Year
682. 02/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for one year period for Executive Engineer (Generation)
683. 01/EE(M)/VP/2024-25 12-06-2024 02-07-2024 Vyasi Office of the Executive Engineer(Maint.), Vyasi Project, Hathiyari, UJVN Ltd. Executive Engineer Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for the office of Dy.GM (O&M), Vyasi Project, Dakpathar for one year period .
684. 01/EE(Test)/GV/2024-25 30-05-2024 02-07-2024 Haridwar Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar Executive Engineer Hiring of diesel vehicle with driver for 1 year
685. 28e/EE(G)/CPH/2023-24 15-03-2024 02-07-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply, Installation, Testing and Commissioning of Generator Transformer (75 MVA, 11/220 KV, 3-ø, 50Hz) with all accessories, including dismantling of the existing transformer at 4x60 MW Chibro Power House
686. 01/EE(IC&CM)/2024-25 15-06-2024 01-07-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer Supply of New Transformer Oil (Naphthenic & Paraffinic base) for different power houses/sites of UJVN Ltd.
687. 01/EE/PCM/Dhalipur/ 2024-25 10-06-2024 01-07-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of damage road on right side of power channel from Court Bridge to Skew bridge Dhalipur, Dehradun
688. 01/EE (R&R)/LMP/2024-25 10-06-2024 01-07-2024 Dakpathar Office of The Executive Engineer (R&R), Lakhwar Multipurpose Project, Dakpathar Executive Engineer Hiring of one number Ambulance (Maruti Eeco/M&M Bolero/Tata Winger /Force Trax/equivalent model or higher model) along with driver for Lakhwar Project for the period of one year
689. 01/EE(G)/Klg/2024-25 08-06-2024 01-07-2024 Kalagarh Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh(Pauri-Garhwal) Executive Engineer Repairing of Ventilation system, Inlet and outletfans.
690. 03/EE(M)/RPSK/2024-25 08-06-2024 29-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual maintenance contract for repairing & overhauling of LOPs and EOCs of unit no. 1, 2 & 3
691. 02/EE(E&M)/Vyasi Dam/2024-25 07-06-2024 28-06-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar Executive Engineer Shifting of TRCM trash from Damsite to the Dump yard site at Juddo, Dakpathar, District Dehradun
692. 01/EE(Maint.)/Khodri/2024-25 07-06-2024 28-06-2024 Dakpathar Dakpathar Executive Engineer Cleaning & up-keeping of duplex strainer buckets system and other miscellaneous works during monsoon season at Khodri Power Station
693. 02/EE(M)/RPSK/2024-25 07-06-2024 27-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual Maintenance of Unit-03.
694. 01/EE(M)/RPSK/2024-25 07-06-2024 27-06-2024 Pauri Garhwal Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Annual cleaning and gardening of various offices and central store premises
695. PDD-01/2024-25 06-06-2024 27-06-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Repairing of 630 KVA (11/0.4 KV) Distribution Transformer
696. 01/EE(G)/CPH/2024-25 05-06-2024 27-06-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Manufacturing & fixing of various Sign Boards and Safety Posters at Chibro Power House
697. 02e/EE(G)/CPH/2024-25 05-06-2024 27-06-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual Contract for miscellaneous work of lighting system, operation and maintenance at Chibro Power House
698. 01/EE(E&M-I)/LP/2024-25 06-06-2024 26-06-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Electrical wiring works in B-Type & C-Type Residential Buildings for Lakhwar Project
699. CH (Maint.)- 04/2024-25 03-06-2024 24-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Cleaning & Flushing of main cooling water Strainer during Monsoon period at Chibro Power Station
700. CH (Maint.)- 03/2024-25 03-06-2024 24-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Operation and routine servicing of 50t outlet structure crane during monsoon period at Chibro Power Station
701. 01/EE(E&M)/PB/2024-25 07-06-2024 22-06-2024 Rishikesh The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh Executive Engineer Annual Routine Electrical Maintenance of colonies and Virbhadra Barrage at Pashulok, Rishikesh
702. 01/2024-25/EE(C-M) 08-06-2024 21-06-2024 Vyasi Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer “Carrying out the Bathymetric Survey of Vyasi Reservoir before the onset of monsoon & after the monsoon
703. 02/SPH2024-25 30-05-2024 21-06-2024 Khatima Office of Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Annual maintenance of bore wells, pipe Lines, cooling water pumps & cleaning of underground cooling water tank along with cleaning of grass, bushes, rubbish etc near intake area at Sharda Power House Lohiahead
704. 02/UJVNL/EE(M&G)/KPS/2024-25 12-06-2024 19-06-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Operation and Maintenance of cross regulating gates at downstream of Kulhal PH
705. 02/EE(H.Q.)/2024-25 27-05-2024 18-06-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Extension and Renovation of work of Training Hall at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun
706. 01/EE(Civil)/HT/2023-24 15-03-2024 18-06-2024 Dehradun Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Hanol-Tiuni Hydro Electric Project on River Tons in District Uttarkashi/Dehradun of Uttarakhand
707. 20/2023-24/EE(C-M)Vyasi Project 09-02-2024 18-06-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Levelling of land & Demarcation of plots at Village Dhaira Khadar,Kalsi Distt. Dehradun for Rehabilitation of Vyasi HEP affected village Lohari
708. 01/EE(HQ)/2024-25 18-05-2024 16-06-2024 Dehradun Office of the Executive Engineer (HQ), UJJWAL, Maharani Bagh, Dehradun Executive Engineer Hiring of vehicles along with driver for corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun.
709. 01/SPH/2024-25 20-05-2024 13-06-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Refilling of old fire extinguishers and supply of other accessories at Sharda Power House, Lohiahead
710. 01/EE(E&M)/Vyasi Dam/2024-25 22-05-2024 11-06-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Hiring of 250 KVA DG Set at Vyasi Dam Site Juddo, Dehradun
711. 11/EE(Civil-II)/LMP/2023-24 12-03-2024 05-06-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. Executive Engineer Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2024-25)
712. 02/2024-25 14-05-2024 04-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Strengthening of Surge Tank Gate Guides at Chibro Power Station.
713. 01/2024-25 14-05-2024 04-06-2024 Dakpathar Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Make shift arrangement for lowering 2nd surge tank gate &associated work at Chibro Power Station.
714. 32/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Safe closure of adits,tunnels,surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi. Corrigendum 3
715. 31/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. Corrigendum 3
716. 30/EE(Civil)/MB-I/TN/2023-24 20-03-2024 01-06-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. Corrigendum 3
717. T-02/EEM/2024-25 21-05-2024 28-05-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply, Fabrication & Replacement of Gland Seal and other pipe line at Chilla Power House
718. 73/EE(M)/MB-II/23-24 13-03-2024 22-05-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Turbine Shaft Rubber Seal for 76MW Turbine at Dharasu Power House MB-II, Chinyalisaur
719. 72/EE(M)/MB-II/23-24 13-03-2024 22-05-2024 Uttarkashi The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of consumable items at Dharasu Power House, MB-II Chinyalisaur
720. 01/EE(G)/Chilla/2024-25 14-05-2024 21-05-2024 Chilla Office of the Executive Engineer (G), Chilla Executive Engineer Annual Maintenance of electrical works of Unit 04 at Chilla Power House.
721. 01/EEM/2024-25 14-05-2024 21-05-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Enginee Supply and Application of Coating Material on different Underwater parts in Unit No-4 of Power House
722. e-T.No.10/EE(Test)/DKN/2023-24 05-03-2024 20-05-2024 Dhakrani Office of the Executive Engineer (Test), Dhakrani Executive Engineer Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels at Kulhal Powerhouse
723. 07/EE(Civil)/KB/2023-24 05-03-2024 15-05-2024 Dakpathar Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Providing Consultancy Services for preparation of EPC tender documents and tender stage drawing for Katapathar Barrage on river Yamuna at Katapathar, Dist. Dehradun in Uttarakhand.
724. 16/EE(E&M-I)/LP/2023-24 26-03-2024 11-05-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Supply of Stationery items for the offices of E&M wing Lakhwar Multi Purpose Project, Dakpathar, Dehradun
725. 21/EE(C-M)/DDN/2023-24 21-02-2024 09-05-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive annual maintenance contract (CAMC) of 03 Nos. Kone Make lifts installed at the New Corporate Office Building G.M.S. Road, Ujjwal Dehradun
726. 32/EE/PCM-DKP/TN/2023-24 27-02-2024 03-05-2024 Dakpathar Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of spillway & roller bucket of bay no 3, 4 & 5, CC Blocks beyond the roller buckets of all spillway and pitching/retaining wall of approach road of Ichari dam
727. 21/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 11.00 to 15.20) at left bank of river Yamuna of Lakhwar MPP
728. 20/EE(Civil-III)/LMP/2023-24 20-03-2024 25-04-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 6.2 to Km 9.00 upto Doligad) at left bank of river Yamuna of Lakhwar MPP
729. 01/EE(Quality)/LMP/2023-24 18-03-2024 23-04-2024 Dehradun Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun Executive Engineer Construction of 04 nos. B-Type residences for Lakhwar Project at Dakpathar, Dehradun
730. e-04/UJVNL/IT/EE(EM-II)/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun Executive Engineer Supply, installation, testing & commissioning of Advance Training System in Training Hall, UJVN Limited, “Ujjwal”, GMS Road, Dehradun
731. 18/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Transit camp at Lakhwar SubStation Kandriyan
732. 17/EE(Civil-I)/LMP/2023-24 16-03-2024 22-04-2024 Dehradun Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair and maintenance of Sub-Station Building and protection of switchyard at Kandriyan.
733. 27/EE-II (E&M)/LP/2023-24 22-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd Executive Engineer-II Detailed Engineering & Designing, Procurement, Manufacturing, inspection, Transportation, site erection, installation, testing & commissioning of Early Warning System and Surveillance System of Lakhwar MPP
734. 26/2023-24/EE(C-M)Vyasi 14-03-2024 22-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun
735. 38/EE/PCM/Dhalipur/ 2023-24 26-02-2024 22-04-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Protection work of Tail Race Channel (Asan River side) of Dhalipur Power House at Dhalipur, Dehradun
736. 48/EE(Pathri)/2023-24 20-03-2024 20-04-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Design, Manufacturing, Supply, Erection, Testing & Commissioning of one no. Hydraulically Operated Trash Rack Cleaning Machine at Pathri Power House
737. 14/EE (Civil)/Lohiahead/Khatima/2023-24 02-03-2024 20-04-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Construction of Type- IV residences in residential complex at Sharda Power House, Lohiahead Khatima Udham Singh Nagar
738. 37/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Zinc coating of Draft tube gates, TRC gates, TRC outfall gates, Surge shaft gates and coating of outer periphery of MIV Inlet Outlet pipe surface at Vyasi HEP, Hathiyari.
739. 36/EE(M)/VP/2023-24 22-03-2024 19-04-2024 Executive Engineer Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Supply and application of coating material on Spiral casing inner surface, Stay Vane & Stay ring surface and inlet pipe inner surface of one unit of Vyasi power house, Hathiyari
740. 36/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Power house site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
741. 35/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Surge shaft site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
742. 34/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Dabrani and Gunga Adit site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi..
743. 33/EE(Civil)/MB-I/TN/2023-24 21-03-2024 19-04-2024 Uttarkashi Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi Executive Engineer Protection works at Barrage site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.
744. 03/EE(Civil-IV)/LMP/2023-24 25-03-2024 18-04-2024 Dakpathar Office of the Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Repair/Reconstruction of motor road from Dam top to Mussorrie bend (Km 9.0 to Km 11.0) at left bank of river Yamuna of Lakhwar MPP
745. T-08/EE(Solar)//2023-24 18-03-2024 17-04-2024 Dehradun Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun Executive Engineer Supply, Installation, Testing & Commissioning work of 100 KW(AC) Grid connected Roof Top Solar Power Plant on new office and two Solar Tree at “Ujjwal”, Maharani Bagh GMS Road, Dehradun
746. PDD-19/2023-24 16-03-2024 15-04-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply and fixing of 33 KV LA, earthing of CT/PT and concreting of four pole structure of 33 KV Dhakrani-Chibro feeder at Mazri.
747. 02/EE(Quality)/LMP/2023-24 19-03-2024 13-04-2024 Dehradun Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun Executive Engineer Construction of 04 nos. C-Type residences for Lakhwar Project at Dakpathar, Dehradun
748. 26/EE-II (E&M)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun.
749. 28/EE-II (E&M-LWR)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Repairing, Maintenance & fencing work of 33/11 kV Substation Hathiyari, under Lakhwar MPP.
750. 26/EE-II (E&M)/LP/2023-24 13-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar Executive Engineer-II Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun.
751. 16/EE(Civil-I)/LMP/2023-24 11-03-2024 12-04-2024 Dakpathar Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), Executive Engineer Supply and Installation of Portable Office cabin/container of size 20’ x 10’ x 8.5’ (Lift & Shift type) at Lakhwar Multi-Purpose project in District Dehradun/Tehri Garhwal.
752. CH(Maint.)- 40/2023-24 20-03-2024 10-04-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Overhauling of TGB assembly (Including one set supply of T.G.B pads) of 60 MW Chibro Turbine
753. 25 /EE(C&M)/MB-II/Joshiyara/2023-24 13-03-2024 10-04-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Reconstruction of Damaged Road from Police Line Gyansu to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi.
754. 29/EE(G)/CPH/2023-24 16-03-2024 08-04-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Annual contract for cleaning, & up keeping of switchyard and Chibro Power House complex
755. 11/EE(E&M)/AB/2023-24 14-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer AMC of barrage control & monitoring systems
756. NCB/10/EE (E&M)/Asan Barrage/ 2023-24 07-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Repair & Overhauling of hoisting arrangement of Barrage gates (1 to 14) of Asan Barrage
757. NCB/09/EE (E&M)/Asan Barrage/ 2023-24 07-03-2024 08-04-2024 Dehradun Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun Executive Engineer Repairing and Major Overhauling of Head Regulator (HR) gates (1 to 5) at Asan Barrage
758. 26/EE(Gen)/Khodri/2023-24 15-03-2024 06-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun), Executive Engineer Supply, Erection, Testing and Commissioning of Collector Assy. 1219 mm diameter (48” slip Ring Assembly) of 31 MVA of Generator of unit no. 3 at Khodri Power Station
759. 25/EE(Gen)/Khodri/2023-24 15-03-2024 06-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Procurement of Electrical Consumable items at Khodri Power Station
760. 28/2023-24/EE(C-M)Vyasi Project 15-03-2024 06-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
761. 27/2023-24/EE(C-M)Vyasi Project 15-03-2024 06-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Landscaping & protection work on the right bank of river Yamuna at Vyasi HEP dam site at Juddo, Distt. Dehradun
762. 25/2023-24/EE(C-M)Vyasi 14-03-2024 05-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Repair and maintenance of Vyasi Dam & Allied structures of Vyasi Project at Juddo (Dehradun)
763. 24/2023-24/EE(C-M)Vyasi 14-03-2024 05-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Maintenance and Repair of Power House and allied structures of Vyasi HEP (2X60MW) at Hathiyari, Dehradun
764. 31/2023-24/EE(C)/Pashulok Barrage 15-03-2024 04-04-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Construction of Approach Road at Divine College of Nursing & Paramedical Sciences, Shyampur Kangri, Haridwar under CSR
765. 16/EE(Test)/DKP/2023-24 15-03-2024 04-04-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Miscellaneous works and supply of items.
766. 17/EE(E&M)/Vyasi Dam/2023-24 27-02-2024 04-04-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd Executive Engineer Supply of T&P Items at Vyasi Dam, Juddo, Dehradun
767. 28/UJVNL/EE(M&G)/KPS/2023-24 13-03-2024 03-04-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulha Executive Engineer Installation of one No. new Bore well with all necessary supply at Intake of Kulhal Power station
768. 35/EE(M&G)/MPH/2023-24 14-03-2024 03-04-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Hiring of One non AC Vehicle for School going Children and Power house work at Mohammadpur Power House for one year.
769. 24/EE(Gen)/Khodri/2023-24 12-03-2024 03-04-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fabrication of Iron Ramps & Iron trench covers of various sizes at Khodri Power Station, Khodri..
770. 19/EE(G)/2023-24 13-03-2024 02-04-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Flushing of Strainers and Flushing of Filtration Plant of Chilla Power House
771. 18/EE(G)/2023-24 13-03-2024 02-04-2024 Chilla Office of the Executive Engineer (G), Chilla Power House Executive Engineer Supply and Fixing of Gear based easy movable mechanism system of store gate of electrical section store at Chilla Power House
772. 15/EE(Civil-I)/LMP/2023-24 11-03-2024 02-04-2024 Dakpathar Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), Executive Engineer Repair and maintenance of Sub-Station Building and premises at Hathiyari.
773. 40/EE/PCM/Dhalipur/ 2023-24 12-03-2024 02-04-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Refurbishment of old M&U office Building Dhalipurat Dhalipur Dehradun
774. 50/EEM&G)DKN/2023-24 07-03-2024 02-04-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of Metering & protection of 132 Bus
775. 23/2023-24/EE(C-M)Vyasi Project, 11-03-2024 02-04-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Construction of Office Building for Executive Engineer (E&M), Vyasi Dam at Juddo, Dehradun
776. 35/EE(M)/VP/2023-24 05-03-2024 01-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Fabrication and fixing of shed over HVAC pump motor set and over HVAC duct cut out on the roof of Vyasi HEP at Hathiyari
777. 34/EE(M)/VP/2023-24 05-03-2024 01-04-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Annual maintenance of Fire Hydrant System of Vyasi HEP at Hathiyari
778. 16/EE(E&M)/Vyasi Dam/2023-24 19-02-2024 01-04-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd. Executive Engineer SITC of High Mast lighting and Street Lighting system at Vyasi Dam, Juddo Dehradun
779. 41/EE (GEN)/MB-II/2023-24 08-03-2024 30-03-2024 Uttarkashi The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer SITC of 15 Nos. Capacitive Voltage Transformer including interfacing with existing control, protection and metering scheme and dismantling of existing Capacitive Voltage Transformer installed at 220 kV switchyard of Dharasu Power House
780. 07/EE(Gen)/Klg/2023-24 08-03-2024 28-03-2024 Pauri Garhwal Office of Executive Engineer (Generation) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal Executive Engineer Procurement of Consumables.
781. 19/EE(E&M)/Vyasi Dam/2023-24 06-03-2024 28-03-2024 Dakpathar Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd Executive Engineer Work of electrification at new office building of EE(E&M) Near View Point at Vyasi Dam, Juddo Dehradun
782. 18/EE(E&M)/Vyasi Dam/2023-24 06-03-2024 28-03-2024 Dakpathar Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar Executive Engineer SITC of CCTV Camera system at Vyasi Dam, Juddo, Dakpathar, Dehradun
783. T-47/EEM/2023-24 15-03-2024 27-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repair and Painting work of Trash Rack at Chilla Power House
784. 15/EE(Test)/DKP/2023-24 04-03-2024 27-03-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Calibration and certification of Various Testing Instruments & Equipment’s of Chibro and Khodri Power House and Ichari Dam.
785. PDD-18/2023-24 05-03-2024 26-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Dismantling of damaged local communication telephone line at Dakpathar colony.
786. 17/EE(Generation)/Vyasi/2023-24 04-03-2024 26-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Supply and fixing of Sign boards, display board and other works at Vyasi HEP
787. CH(Maint.)- 39/2023-24 05-03-2024 26-03-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer Supply, Installation, Testing and Commissioning of 10Ton Electric Wire Rope Hoist (Crane) remote operated with Cross Travel at Central Store, Chibro Power Station, Dakpathar.
788. 04/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 04-03-2024 26-03-2024 Tiuni Plasu Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Supply, Installation, Testing & Commissioning of 125 KVA, 415V (CPCB-IV Plus approved) Silent Diesel Generator (DG) set at the Project Office of ArakotTiuni & Tiuni-Plasu Projects, Dakpathar
789. T-46/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Rewinding and overhauling of 01 No.55HP Motor of pump house at chilla project colony .
790. T-45/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Rotating Shaft Sleeve for Units of Chilla Power House
791. T-44/EEM/2023-24 11-03-2024 23-03-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Supply of Miscellaneous Consumable Items for Units of Chilla Power House
792. 02/EE(E&M - ISO)/2023-24/ISMS 28-02-2024 21-03-2024 Dehradun Office of the Executive Engineer (E&M-ISO), Ganga Bhawan, Yamuna Colony, Dehradun Executive Engineer CONSULTANCY SERVICES FOR IMPLEMENTATION OF ISO 27001:2022 (ISMS) AT SITES HAVING IT/OT UNDER PHASE-II, III, V OF UJVN LTD
793. 13/EE(IC&CM)/2023-24 28-02-2024 20-03-2024 Dehradun Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun EE(IC&CM) Valuation of scrap material lying at Chilla, Dhakrani, Vyasi, Yamuna Colony/Ujjwal Bhawan sites & stores, and Nissen hut at Harrawala of UJVN Ltd
794. 23/EE(CM)/DDN/2023-24 28-02-2024 20-03-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Plantation of Plants,Seasonal Flowers and Routine Maintenance of Garden in New Corporate Office Building UJVN Ltd.,UJJWAL, Maharani Bagh GMS Road,Dehradun .
795. 14/EE (Civil-I)/LMP/2023-24 24-02-2024 20-03-2024 Dakpathar Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) Executive Engineer Repair and maintenance of residences of Lakhwar Project at Dakpather (Dehradun)
796. 19/EE(Civil-III)/LMP/2023-24 28-02-2024 19-03-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Construction of Pre-fabricated site office/ Meeting hall at Power house site of LMPP Distt. Dehradun .
797. 34/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Providing & Fixing the Bird guard at Various locations at power House.
798. 33/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Fabrication & eraction of sliding SS mesh wire gate with one no. openable mesh door & sliding SS mesh wire gate at Power House.
799. 32/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Hiring of Services of Divers at Power House.
800. 31/EE(M&G)/MPH/2023-24 03-03-2024 18-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Fabrication & Fixing of MS Rack for Central Store at Power House
801. 30/2023-24/EE(C)/Pashulok Barrage 02-03-2024 16-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Work related to Fire Protection System with Fire Safety Equipments at Office of EE(Civil), Pashulok Barrage, Rishikesh.
802. 29/2023-24/EE(C)/Pashulok Barrage 02-03-2024 16-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Strengthening of Surveillance & Monitoring System for Security Supervision at Virbhadra Barrage, Rishikesh.
803. CH(Maint.)-38/2023-24 22-02-2024 16-03-2024 Dehradun Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) Executive Engineer AMC of various O&M works at different sites of Chibro Power Station and Ichari Dam under DGM (HGC) Dakpathar
804. 12/EE(Test)/DKP/2023-24 22-02-2024 16-03-2024 Dakpathar Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar Executive Engineer Procurement of Stationaries and office Items
805. 49/EEM&G)DKN/2023-24 22-02-2024 15-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Procurement & installation of Surge Arrester
806. 48/EEM&G)DKN/2023-24 22-02-2024 15-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of indoor sports facility complex
807. 27/EE(G)/CPH/2023-24 07-02-2024 15-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Comprehensive Annual Maintenance Contract of Ventilation system at Chibro Power House
808. 03/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 29-02-2024 14-03-2024 Arakot Tiuni & Tiuni Plasu Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Executive Engineer Annual Operations & Maintenance Contract for Electrical Installations and other miscellaneous works at the project office of Arakot-Tiuni & Tiuni-Plasu, Dakpathar, Dehradun
809. 22/2023-24/EE/PCM(GV)/Mayapur 22-02-2024 14-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer M&R work of Cement Concrete Road of Filtration Plant at Chilla Power House.
810. 45/EE(Pathri)/2023-24 22-02-2024 14-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Procurement of different types of safety items for Pathri Power House
811. 33/EE(M)/VP/2023-24 21-02-2024 14-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Annual maintenance contract of Cooling Water System of Vyasi HEP atHathiyari,Dehradun
812. 32/EE(M)/VP/2023-24 21-02-2024 14-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Annual Maintenance contract for EOT Crane Capacity 100/25 Ton, Vyasi HEP at Hathiyar
813. 20/EE/M&G/DLR/2023-24 28-02-2024 13-03-2024 Dhalipur Office of the Executive Engineer (M&G) Dhalipur Power House Executive Engineer SITC of HOV to MOV Actuator at Penstock filling valve of Unit A, B & C at Dhalipur Power Station .
814. PDD-17/2023-24 22-02-2024 13-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Distt-Dehradun) Executive Engineer Supply & Fixing of 70 sq.mm. LT A2XY single core Aluminium cable .
815. 37/EE/PCM/Dhalipur/ 2023-24 21-02-2024 13-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Repair and Painting works P-I Type Quarters of Kulhal Power House Colony, Kulhal Dehradun
816. 36/EE/PCM/Dhalipur/ 2023-24 21-02-2024 13-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Annual M&R works of Office Building at Dhalipur for the year 2024-25, Dehradun
817. 28/2023-24/EE(C)/Pashulok Barrage 27-02-2024 12-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Repair & Strengthening of Damaged Protection Wrok in D/S of Veerbhadra Barrage Rishikesh
818. 27/2023-24/EE(C)/Pashulok Barrage 27-02-2024 12-03-2024 Rishikesh For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh Executive Engineer Repair & Realignment of Inlet & Outlet of Cross Drainages at Chilla Power Channel.
819. 22/EE(CM)/DDN/2023-24 26-02-2024 12-03-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Comprehensive Annual Maintenance of VRF-Type HVAC air conditioner system installed at the New Corporate Building UJVN Ltd., Ujjwal Maharani Bagh, GMS road Dehradun
820. 22/2023-24/EE(C-M)Vyasi Project 27-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual cleaning, sweeping and other associated works in outer area of Power House building, HRT and Surge Shaft of Vyasi HEP at Hathiyari, Dehradun
821. 21/2023-24/EE(C-M)Vyasi Project 27-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Annual Upkeeping and other works related to offices of Civil-Maintenance, Vyasi Project, Dakpathar, Dehradun
822. 24/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Restoration work of Upstream Damaged Panels of Afflux Bundh at Virbhadra Barrage
823. 23/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Repair and Strengthening of Boulder Excluder Tunnel of Under Sluice Gate No. 01 at Virbhadra Barrage, Pashulok, Rishikesh.
824. 22/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 21-02-2024 12-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Refurbishment of Damaged Chilla Power Channel at Different Places from Barrage Head Regulator Gate to Intake of Chilla Power House.
825. CH (MAINT.) – 37/2023-24 20-02-2024 12-03-2024 Chibro Chibro Executive Engineer Hiring of Non AC vehicle (Mahindra Bolero/TUV 300/Eq.) round the clock with driver for maintenance duty at Chibro Power Station
826. 31/EE(M)/VP/2023-24 21-02-2024 12-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd Executive Engineer Fabrication of MS racks, repairing of shed, rewiring, Painting and cleaning work at central store of Vyasi Power House, Hathiyari.
827. 18/EE(Civil-I)/KG-II/2023-24 16-02-2024 12-03-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Development and allied work at Project Kaliganga-II SHP (2x2.25 MW) in Tehsil Ukhimath, Distt- Rudraprayag
828. 27/UJVNL/EE(M&G)/KPS/2023-24 01-03-2024 11-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Trash Rack, Intake Area Cleaning & other associated work at Kulhal Power House for one year
829. 26/UJVNL/EE(M&G)/KPS/2023-24 01-03-2024 11-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer General cleaning work at Kulhal Power House for one year
830. 26/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 25-02-2024 11-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Digital Topographical Survey work of Allotted Forest Land for Virbhadra Barrage and Associated Chilla HEP Power Channel and Other Relevant Structures at Pashulok, Rishikesh
831. 24/2023-24/EE/PCM(GV)/Mayapur 24-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for Executive Engineer, PCM(GV), Mayapur-Haridwar for the Year 2024-25.
832. 23/2023-24/EE/PCM(GV)/Mayapur 24-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Hiring of Diesel Vehicle with Driver for DGM(CM-GV), Mayapur-Haridwar for the Year 2024-25
833. 09/EE(Civil-II)/LMP/2023-24 26-02-2024 11-03-2024 Dehradun Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, LakhwarBhawan, Dakpathar, Dehradun Executive Engineer Supply, Installation and Monitoring of Instruments in underground Power house Cavern of Lakhwar Multipurpose Project (300 MW) in Dist. Dehradun, Uttarakhand
834. 17/EE(E&M)/(SHP)/RISHIKESH/2023-24 23-02-2024 11-03-2024 Rishikesh The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh Executive Engineer Hiring of one no. of non AC light diesel vehicle (M&M Bolero or equivalent) with driver for one year on rent basis for Executive Engineer (E&M)(SHP) UJVN Limited, Rishikesh
835. 06//EE(Civil)/Tiuni Plasu/2023-24 20-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd, Dakpathar (Dehradun) Executive Engineer Hiring of one number light diesel driven vehicle (Mahindra Make Bolero or Equivalent) along with driver for EE (Civil) Tiuni-Plasu, Dakpathar, Dehradun for period of one year
836. 35/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Cleaning works of Syphons across Power Channel Stage IV during Monsoon from Asan Barrage to Kulhal, Dehradun
837. 34/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer M&R of Power Channel from Silt Ejector Dakpathar to Dhakrani Village Bridge, Dehradun.
838. 33/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Annual M&R works of Power House Colony at Dhalipur, Dehradun
839. 32/EE/PCM/Dhalipur/ 2023-24 19-02-2024 11-03-2024 Dehradun Office of the Executive Engineer PCM Dhalipur, Dehradun Executive Engineer Special Repair works of Diesel Power House at Kulhal Dehradun
840. 47/EEM&G)DKN/2023-24 16-02-2024 11-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of potable water system
841. 46/EEM&G)DKN/2023-24 16-02-2024 11-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Hiring of One No. Non-AC Diesel Vehicle alongwith driver for Executive Engineer (M&G), Dhakrani Power House on annual contract basis
842. 46/EE(Pathri)/2023-24 19-02-2024 11-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Major Overhauling of Unit-3 with spares along with Replacement of Runner blades in Pathri Power House
843. 16/EE(Generation)/Vyasi/2023-24 15-02-2024 11-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Establishment of Test Lab at Vyasi HEP
844. 15/EE(Gen)/Vyasi/23-24 15-02-2024 11-03-2024 Dakpathar The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar Executive Engineer Annual General Cleaning of 2 x 60 MW Vyasi HEP at Hathiyari, Dehradun
845. 30/EE(M)/VP/2023-24 17-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Providing and fixing of SS Rack, Bench, trolley and Aluminium partition at Mechanical workshop at Vyasi HEP, Hathiyar
846. 29/EE(M)/VP/2023-24 17-02-2024 11-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Portable Protection Railing for Drainage pit, Dewatering pit, runner removal gallery, MIV & spiral casing cut outs and Stair railing of access stairs of power house to river at downstram side of control room at Vyasi HEP, Hathiyari
847. 07/EE(E&M)/Maneri Dam/2023-24 10-02-2024 11-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer SITC of Slip ring induction motors for 32 ton Gantry Crane at Maneri Dam.Maneri,Uttarkashi
848. 47/EE(Pathri)/2023-24 24-02-2024 10-03-2024 Haridwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar Executive Engineer Hiring of two no. 7 (6+1) seater diesel vehicle (along with driver’s services) for official use of Executive Engineer, Pathri & DGM, HGC, Pathri and one no. driver for running of departmental ambulance for a period of one year
849. 39/EE(M&G)/DKN/2023-24 03-02-2024 09-03-2024 Dehradun Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun Executive Engineer Supply and Fixing of Air conditioning system
850. 16/EE(Civil-I)/Galogi/2023-24 09-02-2024 08-03-2024 Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal Executive Engineer Repair and Maintenance work at Power house and Residential Building at Galogi SHP (3.5 MW) in district-Dehradun .
851. 25/2023-24/EE (Civil)/UJVNL/Pashulok Barrage 22-02-2024 07-03-2024 Rishikesh Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh Executive Engineer Annual Civil Maintenance & Repair Works of Virbhadra Barrage at Pashulok Rishikesh.
852. T-43/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Rewinding and overhauling of 01 No.HP Motor of pump house at chilla project colony .
853. T-42/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing and up-gradation of computers and other IT equipment of mechanical maintenance section of chilla power house
854. T-41/EEM/2023-24 23-02-2024 07-03-2024 Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Line shifting work of 11 KV Tubewell Feeder at Mundal River site and Preventive Maintenance work of feeder at chilla Project Colony
855. 30/EE(M&G)/MPH/2023-24 18-02-2024 07-03-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar Executive Engineer Removal of debris from Trashpit,forebay and Trashrack of Mohammadpur Power House fro one year
856. 44/EE(Pathri)/2022-23 15-02-2024 07-03-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer AMC of CCTV Camera System installed at various places such as in & around side of Andritz Store, Pathri Power House & 500KWp Solar PV Plant, Pathri and Supply, Installation, Testing & Commissioning of 01 no. CCTV Camera system in Pathri Power House Colony.
857. 42/EEM&G)DKN/2023-24 09-02-2024 07-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Strengthening of Protection system of 33 KV system
858. 24/EE(C&M)/MB-II/Joshiyara/2023-24 29-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards for for Office of Executive Engineer(C&M) MB-II, Joshiyara for the period of one year
859. 23/EE(C&M)/MB-II/Joshiyara/2023-24 29-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards for Executive Engineer(C&M) MB-II, Joshiyara for the period of one year
860. 13/EE (Civil)/Lohiahead/Khatima/2023-24 21-02-2024 06-03-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Construction of CC road on right bank of Main Sharda Canal from intake to byepass at Lohiahead Khatima.
861. 12/EE (Civil)/Lohiahead/Khatima/2023-24 21-02-2024 06-03-2024 Khatima Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima Executive Engineer Repair, modification and extension of office of DGM (HGC), Lohiahead, Khatima.
862. 33/EE(Civil)/MB-II/Chinyalisaur/2023-24 20-02-2024 06-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply of cartridge for printers/photocopier machine for the office of EE(Civil), MB-II, Chinyalisaur, Uttarkashi.
863. 15/EE(E&M)/Vyasi Dam/2023-24 14-02-2024 06-03-2024 Dakpathar Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar Executive Engineer Annual operation of Dam related control system & associated equipment of Vyasi Dam at juddo
864. 07/EE (GC)/2023-24 07-02-2024 06-03-2024 Dehradun Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun Executive Engineer Capital Maintenance of Generator, Turbine, and OPU of Unit No. # 02 of Galogi SHP
865. PDD-16/2023-24 09-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply of spares & overhauling of 33 kV CB Panels at 33/11 kV S/S Khodri .
866. PDD-15/2023-24 09-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) Executive Engineer Supply & Fixing of 28W,1200mm,5-star rated BLDC ceiling fans .
867. 28/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Pool Vehicle, Vyasi Power House, Hathiyari.
868. 27/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Executive Engineer (Maint.), Hathiyari
869. 26/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring one No. light diesel vehicle (M&M Bolero or Equivalent) along with driver for the Executive Engineer, Vyasi Dam, Juddo.
870. 25/EE(M)/VP/2023-24 12-02-2024 04-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring One No. 11 seater van for one year on contract basis for transportation of staff of Vyasi Dam Juddo
871. 30/EE(Civil)/MB-II/Chinyalisaur/2023-24 09-02-2024 04-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual Operation and Maintenance of Water Supply System of Power House Complex at Dharasu, Uttarkashi.
872. 14/EE(E&M-I)/LP/2023-24 27-01-2024 04-03-2024 Dakpathar Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar Executive Engineer Re-conductoring & strengthening of 33 KV Dhakrani Lakhwar Construction Power line no- 02.
873. 17/EE(Civil-I)/KG-I/2023-24 09-02-2024 03-03-2024 Srinagar Garhwal Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwal Executive Engineer Supply and Installation of IOT based real time data system for monitoring of various water parameters at Project Kaliganga- I SHP (2x2) MW SHP in District Rudraprayag.
874. e- 25/UJVNL/EE (M&G)/KPS/2023-24 21-02-2024 02-03-2024 Kulhal Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal Executive Engineer Laying and Stringing Of 33 kV Medium Voltage Covered Conductors (Mvcc) At Dhalipur
875. 18/EE(Civil-III)/LMP/2023-24 18-02-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) Executive Engineer Cleaning, Upkeeping, Gardening and Minor repair works of Lakhwar Bhawan-II at Dakpathar (Dehradun)
876. 32/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 15-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Annual operation and Maintenance of 15 KLD STP at Dharashu Power House Complex at Dharashu, Uttarkashi.
877. 71/EE (M)/MB-II/2023-24 10-02-2024 02-03-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Upper bush housings for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
878. 06/EE(E&M)/Maneri Dam/2023-24 10-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer work of removal of deposited sediments from one no. hopper at Maneri Dam, Maneri, Uttarkashi.
879. 08/EE(E&M)/Maneri Dam/2023-24 10-02-2024 02-03-2024 Uttarkashi Office of the Executive Engineer (E&M), Maneri Dam, Maneri, Uttarkashi Executive Engineer Enamel Painting on steel structure of Maneri Dam, Maneri, Uttarkashi.
880. 45/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of potable water system
881. 44/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Refurbishment of power supply system of 33 KV switchyard/ Substation & Central store
882. 43/EEM&G)DKN/2023-24 09-02-2024 02-03-2024 Dhakrani Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Annual Maintenance Contract (AMC) for Electrical Maintenance works of Dhakrani colony
883. 02/EE (Civil)/AT/2023-24 10-02-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Civil), Arakot Tiuni Project, Dakpathar Executive Engineer Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Pool vehicle related to Arakot Tiuni & Hanol-Tiuni Projects works for period of one year
884. 24e/EE(G)/CPH/2023-24 03-02-2024 02-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Manufacturing & fixing of Guide bearing support ring including annual maintenance of 60 MW generator & associated equipment of unit 3 at Chibro Power House.
885. 14/EE(Test)/DKP/2023-24 31-01-2024 02-03-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Procurement of spare and consumable items for Test Unit in Khodri Power House.
886. 22/EE(G)/CPH/2023-24 26-01-2024 02-03-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer “Supply of spare parts for generator maintenance at Chibro Power House
887. 18/GM(CDH&NP)/UJVNL/2023-24 23-01-2024 02-03-2024 Uttarkashi Uttarkashi ROLE OF THE DEVELOPER INVITATION OF BIDS FOR THE DEVELOPMENT OF SMALL HYDRO PROJECTS IN UTTARAKHAND
888. 31/EE/PCM-DKP/TN/2023-24 16-02-2024 01-03-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Civil Maintenance & Repair works of Ichari Dam & its associated structures.
889. 12/EE (G)/TPH/2023-24 15-02-2024 01-03-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Annual Contract for Cutting, digging and uprooting the big bushes & grass of 220 kV/33 kV switchyard and GTF deck area of Tiloth Power House, Uttarkashi.
890. 21/2023-24/EE/PCM(GV)/Mayapur 09-02-2024 01-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer White Washing & Painting of D-Type Residences at Pathri Colony .
891. 20/2023-24/EE/PCM(GV)/Mayapur 09-02-2024 01-03-2024 Haridwar Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer White Washing & Painting of C & G-Type Residences at Pathri Colony
892. 05/EE(Civil)/Tiuni Plasu/2023-24 09-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer (Civil-I), Tiuni-Plasu, UJVNLtd., Dakpathar (Dehradun) Executive Engineer Construction/Repair of reference pillars along with land alignment /boundaries & making footpath on Tiuni –Plasu HEP at Tiuni, District -Dehradun
893. 22/EE(E&M)/MB-II/Barrage/2023-24 09-02-2024 01-03-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Hiring of pumps with complete Operation and Maintenance to maintain water level at Joshiyara barrage tunnel
894. 43/EE(Pathri)/2023-24 09-02-2024 01-03-2024 Hardwar Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar Executive Engineer Annual Contract for operation & maintenance of 500 KWp Solar PV Plant Pathri.
895. 24/EE(M)/VP/2023-24 10-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Supply of different types of nut & bolts and filter elements of GOV and MIV OPU System of Vyasi power house
896. 23/EE(M)/VP/2023-24 10-02-2024 01-03-2024 Dakpathar Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar Executive Engineer Hiring of one no. 27 Seater Bus for one year on contract basisfor transportation of staff of Vyasi Project, Hathiyari, Dehradun
897. 30/EE/PCM-DKP/TN/2023-24 15-02-2024 29-02-2024 Dehradun Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) Executive Engineer Special repair of C-Type Residences of Tons Colony at Dakpathar, Dehradun
898. 31/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 15-02-2024 29-02-2024 Uttarkashi Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) Executive Engineer Hill slope protection work behind Dharasu Power House of Maneri Bhali Project Stage-II at Dharasu,(Uttarkashi).
899. 20/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 07-02-2024 29-02-2024 Pauri Garhwal Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal Executive Engineer Painting work of Non Residential Buildings and Boundary wall at Kalagarh.
900. 29/EE(M&G)/MPH/2023-24 07-02-2024 29-02-2024 Hardwar Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar Executive Engineer Annual Routine Maintenance Contract of Power House
901. 13/EE(Test)/DKP/2023-24 31-01-2024 29-02-2024 Dakpathar Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar Executive Engineer Supply and fixing of electrical insulation mat around LV and HV panels in Khodri and Chibro Power Station
902. 27/SPH/2023-24 11-01-2024 29-02-2024 Khatima Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima Executive Engineer Supply, Installation, Testing & Commissioning of 62.5 KVA D.G. set with AMF panel in learning centre of Sharda Power House Lohiahead
903. 26e/EE(G)/CPH/2023-24 07-02-2024 28-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Supply of spare parts for electrical maintenance (S/Y & light) at Chibro Power House
904. 25/EE(G)/CPH/2023-24 07-02-2024 28-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Hiring of Non AC vehicle with round O clock driver for emergency duty of Chibro Power House
905. 11/EE (G)/TPH/2023-24 08-02-2024 28-02-2024 Uttarkashi Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi Executive Engineer Application of Insulation Epoxy coating on floor area of different LT Boards (415V AC) and HT Boards (11kV) installed at Tiloth Power House, Uttarkashi
906. 23/EE(Maint.)/Khodri/2023-24 07-02-2024 28-02-2024 Dakpathar Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Modification & Overhauling work of 50 HP Emergency pump Pipe Line, PSE Protection coating and Repairing of Valve at 30 MW Khodri Power Station
907. 22/EE(Maint.)/Khodri/2023-24 07-02-2024 28-02-2024 Dakpathar Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Supply and installation of the thermal insulation (Elastomeric Foam based on rubber with Aluminum Cladding) on cooling water Pipe Line in MIV gallery and miscellaneous works of Khodri Power Station .
908. 19/2023-24/EE/PCM(GV)/Mayapur 07-02-2024 28-02-2024 Executive Engineer Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar Executive Engineer Restoration of Damaged Structures due to Disaster at Pathri Power House & Colony
909. 20/EE/(C-M)/ DDN/2023-24 07-02-2024 28-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Purchasing of T&P for day-to-day routine maintenance work at the new corporate building Ujjwal Dehradun
910. 19/EE(C-M)/DDN/2023-24 07-02-2024 28-02-2024 Dehradun Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun Executive Engineer Supply of electrical spare parts (Stocks) for day-to-day routine maintenance work at the new corporate building Ujjwal Dehradun
911. 22/EE(C&M)/MB-II/ Joshiyara/2023-24 06-02-2024 27-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Restoration of Damaged Protection wall of Barrage Reservoir at left bank of Bhagirathi River, near Nigam Parking, Joshiyara Uttarkashi.
912. 22/EE(M)/VP/2023-24 07-02-2024 27-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer Hiring of 1 No. 05 Seater light utility vehicle along with driver for one year period for Vyasi Dam Juddo
913. 21/EE(M)/VP/2023-24 07-02-2024 27-02-2024 Hathiyari Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyari Executive Engineer SITC of LED lights on Draft tube gate hoist, TRC gate hoist and surge shaft gate hoist and HRT Adit Gate of Vyasi HEP at Hathiyar
914. 41/EEM&G)DKN/2023-24 05-02-2024 27-02-2024 Dhakrani Power House Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer Providing of shutter and racks etc. and repair/overhauling of shutters of various stores
915. 40/EEM&G)DKN/2023-24 05-02-2024 27-02-2024 Dhakrani Power House Office of the Executive Engineer (M&G) Dhakrani Power House Executive Engineer “Landscaping and misc. maintenance works in Officer Transit Camp & associated areas
916. NIT- 68/EE(M)/MB-II/23-24 06-02-2024 27-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Repair and Overhauling of Draft Tube Gantry Crane of Capacity 20 Ton at Dharasu Power House, MB-II Uttarkashi.
917. NIT-70/EE (M)/MB-II/2023-24 06-02-2024 27-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of SS Forged Liner Plates for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
918. CH(Maint.)- 36/2023-24 06-02-2024 27-02-2024 Chibro Office of the Executive Engineer (Maint.), Chibro Power Station Executive Engineer Supply & Application of Coating Material on Draft Tube Chamber, Draft Tube Window & Stay vanes of Unit No. 03 at Chibro Power Station
919. 21/EE(E&M)/MB-II/Barrage/2023-24 05-02-2024 27-02-2024 Joshiyara Barrage Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage Executive Engineer Supply of various submersible dewatering and slurry pumps and their starters at Joshiyara Barrage
920. 15/EE(C&M)/MB-II/Joshiyara/2023-24 27-01-2024 27-02-2024 Uttarkashi Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi Executive Engineer Reconstruction of Damaged Road from Police Line Gyansu to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi.
921. 40/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of DOL Starter Panel for 3.0 H.P and 10.0 H.P Submersible Pumps for Units of Power House
922. 39/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of Cleaning and Gasket Sealant Products for Preventive and Breakdown maintenance of units of Chilla Power House
923. 38/EEM/2023-24 14-02-2024 26-02-2024 Chilla The office of the Executive Engineer (M), UJVN Ltd. Chilla Executive Engineer Procurement of different types of Electrical consumables for Residences of Project Colony
924. 36/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of various size Gate Valves of Units of Chilla Power House
925. 35/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of safety relief valve, NRV ,Vacuum breaking valve, Servo tube assembly ,Support plates and adjusting bolts /studs ,OCU ,OLU and GOP pumps of Chilla Power House
926. 34/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Repairing of 33 kV Chilla- Bhupatwala Feeder at Neeldhara in River Ganga
927. 33/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Fabrication and Supply of Runner Servo Tube Assembly for Units of Chilla Power House
928. 32/EEM/2023-24 13-02-2024 26-02-2024 Pauri- Garhwal Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) Executive Engineer Removal of silt from drainage/dewatering gallery nearby area at Power House
929. 21/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer Works related to Barrels and Cross Drainages of Chilla HEP Power Channel at Rishikesh.
930. 20/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer Internal Painting work of Type-B, Type-C & Type-D Residences of Maneri Bhali-II Colony Rishikesh.
931. 19/2023-24/EE(C)/Pashulok Barrage 06-02-2024 26-02-2024 Rishikesh UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh, Executive Engineer External Painting work of Type-A, Type-B, Type-C & Type-D Residences of Maneri Bhali-II Colony Rishikesh
932. 23/EE(Gen)/Khodri/2023-24 04-02-2024 26-02-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Fire Protection coating on power cables and control cables of cable gallery
933. 22/EE(Gen)/Khodri/2023-24 04-02-2024 26-02-2024 Dehradun Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) Executive Engineer Replacement & Modification of Hydrant line along with providing of hose fireboxes
934. 69/EE(M)/MB-II/23-24 05-02-2024 26-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Procurement of Lower bush housings and Gun Metal Bushes for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi
935. 67/EE(M)/MB-II/23-24 05-02-2024 26-02-2024 Uttarkashi The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) Executive Engineer Supply of miscellaneous electrical items for colony maintenance in Shaktipuram Colony, Chinyalisaur
936. 23/EE(G)/CPH/2023-24 26-01-2024 26-02-2024 Chibro Office of the Executive Engineer (Generation) Chibro Power House, Chibro Executive Engineer Testing of oil for 4*69 MVA Transformers at Chibro Power House
937. 19/2023-24/EE(C-M)Vyasi Project 20-01-2024 26-02-2024 Dakpathar Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar Executive Engineer Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun
938. 18/2023-24/EE(C-M)Vyasi Project 20-01-2024 26-02-2024