1. | 17/EE-II (E&M-LWR)/LP/2023-24 | 21-11-2023 | 07-12-2023 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer | SITC of LED Board, Main Gate & Store repair work at 33/11 kV Substation Lakhwar Kaldriyan, Nain Bagh, Tehri Garhwal |
|
2. | 05/EE(E&M)/ICHARI/TN/2023-24 | 03-11-2023 | 07-12-2023 | Dakpathar | Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) | Executive Engineer | Painting works on various steel structures of Ichari Dam in District Dehradun |
|
3. | 04/EE(E&M)/ICHARI/TN/2023-24 | 03-11-2023 | 07-12-2023 | Dakpathar | Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) | Executive Engineer | Supply and fixing of miscellaneous electrical items including supply of spares for Ichari Dam in District Dehradun |
|
4. | 07/EE(IC&CM)/2022-23 | 25-10-2023 | 07-12-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Supply of Lighting Arrestor for various Power Houses/Sites of UJVN Ltd |
|
5. | 29/EEM&G)DKN/2023-24 | 21-11-2023 | 06-12-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Arresting of oil leakage from 2 Nos. 132/33 KV 40 MVA Transformers at 132/33 kV Switchyard. |
|
6. | CH(Maint.)-32/2023-24 | 15-11-2023 | 06-12-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Supply & Fixing of various valves of Machine # 4 at Chibro Power Station. |
|
7. | 20/SPH/2023-24 | 10-11-2023 | 05-12-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, of Unit 3 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead as per technical specifications |
|
8. | 19/SPH/2023-24 | 10-11-2023 | 05-12-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Supply, Installation, Testing & Commissioning of 62.5 KVA D.G. set with AMF panel in learning centre of Sharda Power House Lohiahead |
|
9. | 11/EE(Civil-I)/Srikot/2023-24 | 09-11-2023 | 05-12-2023 | Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer | Maintenance and Repair work of UJVNL Office Building at kund, Guptkashi in district-Rudraprayag |
|
10. | 14/EE(G)/CPH/2023-24 | 04-11-2023 | 05-12-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Supply & installation of 02 nos water coolers and Comprehensive Annual Maintenance Contract of drinking water coolers including RO at Chibro Power House |
|
11. | 07/EE(Test)/DKP/2023-24 | 23-10-2023 | 05-12-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpatha | Executive Engineer | Retrofitting of Turbine Gauge Panel with Static Relay and SCADA compatibility for Units-3 and spares of TG panels at Chibro Power House. |
|
12. | 06/EE(G)/2023-24 | 10-11-2023 | 02-12-2023 | Uttarkashi | Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi | Executive Engineer | supply of silver coated flexible braided copper connector and bimetallic strip (CU+AL) for Tiloth Power House Uttarkashi |
|
13. | 19/EE(M)/RPSK/2023-24 | 11-11-2023 | 01-12-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Annual Maintenance Contract for electrical works at residential and nonresidential buildings of UJVN limited, Kalagarh in Distt. Pauri Garhwal. |
|
14. | 18/EE(M)/RPSK/2023-24 | 09-11-2023 | 01-12-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Procurement of filter elements for Microprocessor Based Governing System. |
|
15. | 01/EE-I(E&M Design-II)/2023-24 | 09-11-2023 | 01-12-2023 | Dehradun | Office of the Executive Engineer-I(E&M Design-II), Ganga Bhawan, Dehradun | Executive Engineer-I | Painting/repairing of various Almirah at Central library and E&M design office at Ganga Bhawan, Dehradun |
|
16. | 10/EE (Civil-III)/LMP/2023-24 | 11-11-2023 | 30-11-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Construction of Public Toilet for project affected villagers of vill-Kwaansha at Kalsi block, Dehradun Of LMPP |
|
17. | 01/UJVNL/ DGM(Civil)/PITH/SBR /2023-24 | 12-09-2023 | 30-11-2023 | Pithoragarh | Office of the Dy General Manager (Civil), UJVN Limited, Munsiyari, Pithoragarh | Dy General Manager | Consultancy Services for Detailed Civil Design and Engineering including Project Monitoring & Quality Control of Sirkari Bhyol Rupsiabagar Hydro Electric Project (3x40MW =120MW) on River Goriganga in District Pithoragarh, Uttarakhand |
|
18. | 09/EE (Civil-III)/LMP/2023-24 | 09-11-2023 | 29-11-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Construction of level pillars for demarcation of reservoir at Lakhwar MPP Distt. Dehradun/ Tehri Garhwal Uttarakhand |
|
19. | 04/EE (G)/TPH/2023-24 | 08-11-2023 | 29-11-2023 | Uttarkashi | Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi | Executive Engineer | Annual Contract for Gardening, Plantation & other associated miscellaneous works at Tiloth Power House, Uttarkashi |
|
20. | 03/EE (G)/TPH/2023-24 | 08-11-2023 | 29-11-2023 | Uttarkashi | Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi | Executive Engineer | Annual contract for General Cleaning and up keeping of Tiloth Power House, Uttarkashi. |
|
21. | 11/EE(Test)/DKP/2023-24 | 23-10-2023 | 29-11-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Arrangement for Breaker failure Protection for all 220KV bays of Generating units at Khodri Power Station. |
|
22. | 20/EEM/2023-24 | 20-11-2023 | 28-11-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | SITC of 200 Ton Crane Capacity Hook at Chilla Power House. |
|
23. | 15/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 07-11-2023 | 28-11-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Renovation of 10 Nos. garages and approach roads in Type - III residences at Hydel colony Kalagarh |
|
24. | 14/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 07-11-2023 | 28-11-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Annual M & R Work of Non Residential Buildings at Kalagarh. |
|
25. | CH (Maint.)- 31/2023-24 | 06-11-2023 | 28-11-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Cleaning of D&D pits, clean water tank, and miscellaneous work at Chibro Power Station |
|
26. | CH (Maint.)- 30/2023-24 | 06-11-2023 | 28-11-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Servicing & Maintenance of 15 Ton Draft Tube Gantry Crane at Chibro Power Station. |
|
27. | 12/EE(E&M)/MB-II/Barrage/2023-24 | 25-09-2023 | 28-11-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Sealing of gates of Joshiyara Barrage with caulking material by under water diving team |
|
28. | 41/EE(M)/MB-II/23-24 | 06-11-2023 | 27-11-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Rewiring in residential/ non-residential buildings at Shaktipuram Colony, Chinyalisaur |
|
29. | 10/EE(M)/2023-24 | 25-10-2023 | 27-11-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Testing of various equipments and pressure vessels of Tiloth Power House |
|
30. | 08/EE(E&M-SHP)/Madhyamaheshwar/2023-24 | 31-10-2023 | 26-11-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi, | Executive Engineer | Reconductoring of Dog conductor to AL-59 Panther conductor of 33kV transmission line from Madhyamaheshwar SHP to 33kV Ukhimath S/s in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand |
|
31. | 21/SPH/2023-24 | 18-11-2023 | 25-11-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Repair and maintenance of 09 nos intake gates and 08 nos bypass gates along with supply and installation of the brake coil assembly, overhauling of cooling water system and other miscellaneous work” at Sharda Power House, Lohiahead |
|
32. | 33/EE(Pathri)/2023-24 | 02-11-2023 | 25-11-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Refilling & Repairing of various types of Fire Extinguishers and Procurement of different types of new Fire Extinguishers for Pathri Power House |
|
33. | 17/SPH/2023-24 | 21-10-2023 | 25-11-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, replacement of 07 nos. shutter vane servomotor seal kit, dismantling of turbine guide bearing of Unit 2 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead |
|
34. | 11/2023-24/EE(C)/Pashulok Barrage | 22-10-2023 | 25-11-2023 | Rishikesh | UJVN Ltd , Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Operation and Maintenance of UJVNL Officer Transit Camp and Office of General Manager (SHP) at Maneri Bhali-II Colony, Rishikesh. |
|
35. | 16/EE(M)/RPSK/2023-24 | 11-10-2023 | 25-11-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for EE(G). |
|
36. | 15/EE(M)/RPSK/2023-24 | 07-10-2023 | 25-11-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months. |
|
37. | 05/EE(E&M)/DKP BRG/2023-24 | 04-11-2023 | 24-11-2023 | Dakpathar | Office of Executive Engineer (E&M), Dakpathar Barrage | Executive Engineer | Up keeping & Maintaining of Inspection House for a period of twelve months at Dakpathar District- Dehradun. |
|
38. | 15/EE(E&M-II)/LP/2023-24 | 02-11-2023 | 24-11-2023 | Dakpathar | Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun | Executive Engineer | Annual operation and Maintenance contract of various 33/11 kV substation and 11 kV lines of Lakhwar MPP for the period of 12 months. |
|
39. | 11/2023-24/EE(C-M)Vyasi Project | 03-11-2023 | 23-11-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Protection work at D/S of plunge pool at left bank of Vyasi Dam (Ch 230.00M to 290.00M D/S) Near Motor Bridge at Juddo,Distt Dehradun |
|
40. | 12/EE(CM)/DDN/2023-24 | 02-11-2023 | 23-11-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Housekeeping Service for New Corporate Office Building for the year 2023-24 ,Ujjawal,Maharani Bagh, Dehradun |
|
41. | 07/EE(E&M-SHP)/Madhyamaheshwar/2023-24 | 28-10-2023 | 23-11-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi, | Executive Engineer | Construction of LT line and lighting at wear and Forebay site of Madhyamaheshwar SHP (3x5 MW+15% COL) in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand. |
|
42. | 07/EE(E&M)(SHP)/Rishikesh/2023-24 | 08-11-2023 | 22-11-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh | Executive Engineer | Supply, Installation, Commissioning, Integration & Testing of 33 kV VCB at 2x1125 kW Pilangad SHP in District- Uttarkashi. |
|
43. | 09/2023-24/EE(C)/Pashulok Barrage | 19-10-2023 | 22-11-2023 | Pashulok Barrage Rishikesh | Pashulok Barrage Rishikesh | Executive Engineer | Annual Maintenance & Repair Works of Maner Bhali-II Colony at Rishikesh. |
|
44. | 06EE(Test)/GV/2023-24 | 11-10-2023 | 21-11-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer | Calibration of Testing Instruments and Panel Meters of Power Houses under Ganga Valley Haridwar |
|
45. | 35/EE(Pathri)/2023-24 | 05-11-2023 | 20-11-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual contract for operation & maintenance works of water pumping station. |
|
46. | 34/EE(Pathri)/2023-24 | 05-11-2023 | 20-11-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual contract for cleaning of offices / club & other places. |
|
47. | 09/EE(Test)/DKP/2023-24 | 23-10-2023 | 20-11-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Procurement of consumable and stock items for Test Unit Chibro Power House. |
|
48. | 10/EE (Civil-I)/Srikot/2023-24 | 04-10-2023 | 20-11-2023 | Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer | Annual maintenance and upkeep of UJVNL office/filed hostel at Srikot Srinagar in District Pauri Garhwal. |
|
49. | 09/EE(IC&CM)/2023-24 | 27-10-2023 | 18-11-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Valuation of scrap material lying at Chibro Power House & stores, Khodri Power House & stores and Ichari dam site & stores of UJVN Ltd. |
|
50. | 18/EEM/2023-24 | 28-10-2023 | 18-11-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Hiring of 3 Nos 50/52 Seater School Bus for Chilla Project Colony, Chilla. |
|
51. | 08/EE(IC&CM)/2023-24 | 26-10-2023 | 17-11-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Supply of 33 kV CTs for Khatima power house of UJVN Ltd. |
|
52. | 01/EE(C-BNP)/Chamoli/2022-23 | 26-10-2023 | 17-11-2023 | Chamoli | Office of the Executive Engineer (C-BNP), Kshetrapal, Chamoli | Executive Engineer | Housekeeping and Caretaking of Transit Camp Building of UJVNL at Dhunarghat (Gairsain), Chamoli (UK) for 12 months. |
|
53. | 12/EE(M)/2023-24 | 27-10-2023 | 17-11-2023 | Uttarkashi | The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi | Executive Engineer | Hiring of 02 nos. non AC diesel vehicles |
|
54. | 11/EE(M)/2023-24 | 27-10-2023 | 17-11-2023 | Uttarkashi | The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi | Executive Engineer | Fabrication and supply of head cover balancing pipe of Tiloth Power House |
|
55. | 23/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 26-10-2023 | 17-11-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Operation & Maintenance of water treatment plant, pump house including pump and electrical fittings, Nagungad water supply line/head works of Shaktipruam colony MB- II at Chinyalisaur, Uttarkashi |
|
56. | 13/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 20-10-2023 | 17-11-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Leakage Treatment of Sun sheds and Newly Alloted Type-I & Type-II Residences at Hydel Colony Kalagarh. |
|
57. | 10/2023-24/EE(C)/Pashulok Barrage | 19-10-2023 | 17-11-2023 | Pashulok Barrage Rishikesh | Pashulok Barrage Rishikesh | Executive Engineer | Repair Work of Police Chowki & Barrak at Veerbhadra Barrage Rishikesh. |
|
58. | 03/EE (GC)/2023-24 | 18-10-2023 | 17-11-2023 | Dehradun | Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun | Executive Engineer | Annual General cleaning and up keeping of all building at campus & other Miscellaneous work Galogi SHP |
|
59. | CH(Maint.)-24/2023-24 | 07-10-2023 | 17-11-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Replacement of 01 No 9000 LPM VT Dewatering Pump with motor at Chibro Power Station |
|
60. | 06/EE(Civil-II)/LMP/2023-24 | 03-11-2023 | 16-11-2023 | Dakpathar | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, LakhwarBhawan, Dakpathar, Dehradun | Executive Engineer | Special Repair of Field Hostel (Near inspection house), old Field Hostel (3 Story), and Sports Club at Dakpathar |
|
61. | 11/2023-24/EE/PCM(GV)/Mayapur | 26-10-2023 | 16-11-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | M&R Work of Mohammadpur Power House at Mohammadpur for the Year 2023-24. |
|
62. | 10/2023-24/EE/PCM(GV)/Mayapur | 26-10-2023 | 16-11-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | M&R Work of Pathri Colony for the Year 2023-24 |
|
63. | 09/EE(M)/2023-24 | 25-10-2023 | 16-11-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Repairing and overhauling of switchyard of DPH Tiloth and Heena |
|
64. | 12/2023-24/EE (Civil)/UJVNL/Pashulok Barrage | 22-10-2023 | 16-11-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer | Roof Treatment of Type-A, Type-B, Type-C & TypeD Residences of Barrage Colony at Pashulok, Rishikesh |
|
65. | 14/EE(E&M)/MB-II/Barrage/2023-24 | 26-10-2023 | 15-11-2023 | Joshiyara | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Electrical safety works at Joshiyara Barrage, Uttarkashi |
|
66. | 13/EE(E&M)/MB-II/Barrage/2023-24 | 26-10-2023 | 15-11-2023 | Joshiyara | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Procurement of Nut bolts and other items at Joshiyara barrage Uttarkashi |
|
67. | 05/ EE(Civil)/SHP/Maneri /2023-24 | 21-10-2023 | 15-11-2023 | Uttarkashi | Office of the Executive Engineer (Civil)/SHP/Maneri Uttarkashi | Executive Engineer | Special Repair & Maintenance of Trench weir, Intake Gates and other associated works at Pilangad (2x1125 kw) SHP, Distt. Uttarkashi. |
|
68. | 19/EEM/2023-24 | 04-11-2023 | 14-11-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | SITC of 200 Ton Crane Capacity Hook at Chilla Power House |
|
69. | 10/2023-24/EE(C-M)Vyasi Project | 01-11-2023 | 14-11-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Strengthening & Protection work of Judo Playground at Vyasi HEP Juddo, Dehradun |
|
70. | CH(Maint.)- 29/2023-24 | 22-10-2023 | 14-11-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual running & upkeeping work of clean water supply to shaft gland of 60 MW turbine at Chibro Power Station |
|
71. | CH(Maint.)-28/2023-24 | 22-10-2023 | 14-11-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Up-keeping and maintenance of Chibro field hostel |
|
72. | 22/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 20-10-2023 | 14-11-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual upkeeping& cleaning of Badminton Court/ Multipurpose hall atShaktipuram colony ChinyalisaurUttarkashi. |
|
73. | 06/EE(IC&CM)/2023-24 | 21-10-2023 | 13-11-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Supply of CTs and PTs for different power houses/sites of UJVN Ltd. |
|
74. | 12/UJVNL/EE(M&G)/KPS/2023-24 | 21-10-2023 | 13-11-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Supply & Fixing of gate Valves of Unit B at Kulhal Power Station |
|
75. | 13/Manager(A&S)/2023-24 | 13-10-2023 | 13-11-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager | Hiring of vehicle without driver for corporate office, UJJWAL Maharani Bagh, G.M.S. Road, Dehradun |
|
76. | 29/EE (GEN)/MB-II/2023-24 | 12-10-2023 | 13-11-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Resin Cast Neutral Grounding Transformer (NGT) for 4X76 MW Generator at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
77. | 11/UJVNL/EE (M&G)/KPS/2023-24 | 21-10-2023 | 11-11-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Annual maintenance of Unit-B of Kulhal Power House (3x10 MW), Kulhal |
|
78. | 05/EE(IC&CM)/2023-24 | 20-10-2023 | 11-11-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Procurement of testing equipments for different Power Houses of UJVN Ltd. |
|
79. | 05/EE(G)/Klg/2023-24 | 28-10-2023 | 10-11-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (PauriGarhwal) | Executive Engineer | Repairing, cleaning & painting of 66 M.W. Generator, Main exciter, PMG, stator core, air cooling ventilating duct and 11KV bus duct of 66 MW Unit # 1. |
|
80. | 19/EE(Gen)/Khodri/2023-24 | 21-10-2023 | 10-11-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Contract for Cleaning and up keeping of Khodri Power Station. |
|
81. | 17/EE(M)/RPSK/2023-24 | 21-10-2023 | 10-11-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Operation & Maintenance of drinking water supply system for a period of twelve months at hydel colony Kalagarh alongwith other associated works. |
|
82. | 09/2023-24/EE/PCM(GV)/Mayapur | 20-10-2023 | 10-11-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Annual M&R Work of Type-II Residences at Chilla Colony for the year 2023-24. |
|
83. | 17/EE(Gen)/Khodri/2023-24 | 19-10-2023 | 10-11-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Refurbishment works related to Control Room, Committee Room & Reception Roomat Khodri Power Station |
|
84. | 08/EE(Test)/DKP/2023-24 | 19-10-2023 | 10-11-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Replacement of Thermal protection of all four 69 MVA Generator Transformer and one complete control panel at (4x60MW) Chibro Power Station |
|
85. | 03/EE(E&M)/AB/2023-24 | 19-10-2023 | 09-11-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Work for supply and re-filling of fire-extinguishers |
|
86. | 02/EE(E&M)/AB/2023-24 | 19-10-2023 | 09-11-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Work for supply and fixing of rubber seal in HR gate no. 1 to 5 |
|
87. | 28/EEM&G)DKN/2023-24 | 19-10-2023 | 09-11-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Repair & overhauling of workshop equipment & other misc. procurement |
|
88. | 07/2023-24/EE/PCM(GV)/Mayapur | 18-10-2023 | 08-11-2023 | Mayapur | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Annual Horticulture Upkeeping & Sweeping Cleaning Work of Chilla Power House Premises at Chilla |
|
89. | 06/2023-24/EE/PCM(GV)/Mayapur | 18-10-2023 | 08-11-2023 | Mayapur | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Annual Sweeping & Cleaning Work of Chilla Colony for the year 2023-24. |
|
90. | CH (Maint.)- 27/2023-24 | 18-10-2023 | 08-11-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Servicing & Maintenance of 100/20 Ton EOT Crane of Chibro Power Station. |
|
91. | CH (Maint.)- 26/2023-24 | 18-10-2023 | 08-11-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Safety audit of tools & equipment at different sites of Chibro Power Station |
|
92. | 21/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 17-10-2023 | 08-11-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Development of pathway at Dharasu power house near neri village MB-II, Uttarkashi. |
|
93. | 20/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 17-10-2023 | 08-11-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Drilling of bore hole for supply of drinking water at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi. |
|
94. | 06/EE(E&M-SHP)/KG-I/2023-24 | 13-10-2023 | 08-11-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer | Leakage arresting work of MIV of UNIT-II & Supply of misc. items at Kaliganga-I SHP (2x2 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag |
|
95. | 10/EE(Civil)/Lohiahead/Khatima/2023-24 | 21-10-2023 | 06-11-2023 | Lohiahead Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | Repair of damaged and eroded concrete surface of Spiral Casing of UNIT 1 of Sharda Power House at Lohiahead, Khatima |
|
96. | 22/EE/PCM/Dhalipur/ 2023-24 | 16-10-2023 | 06-11-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R of Asan Barrage and other appurtenant structures at Dhalipur, Dehradun |
|
97. | 12/EE(G)/Chilla/2023-24 | 14-10-2023 | 06-11-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Supply of different types of Electrical, consumable and cleaning materials at Chilla Power House |
|
98. | 14/EE(C&M)/MB-II/ Joshiyara/2023-24 | 14-10-2023 | 06-11-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual Civil Repair & Maintenance of Joshiyara Barrage, Uttarkashi. |
|
99. | 16/SPH/2023-24 | 10-10-2023 | 06-11-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Engagement of 05 nos Skilled and 03 nos unskilled Manpower for Mechanical, Electrical, Generation, Test, Colony and Office for day-to-day basis work for a period of 11 months” at Sharda Power House, Lohiahead, Khatima Distt. Udham Singh Nagar (Uttarakhand) |
|
100. | T-01/EE(Solar)/2023-24 | 07-10-2023 | 06-11-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | EE (Solar) | Setting up of 9.5 MW Canal Bank Grid Connected Solar PV Plants On Yamuna Power Channel Near Dhakrani HEP, Dehradun, Uttarakhand. |
|
101. | 30/EE (GEN)/MB-II/2023-24 | 12-10-2023 | 04-11-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of various consumable items for 220 kV Switchyard of MB-II, Dharasu Power House |
|
102. | 28/EE (GEN)/MB-II/2023-24 | 12-10-2023 | 04-11-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Silver coating of copper braided flexible connections of Generator at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
103. | 14/EE(E&M-II)/LP/2023-24 | 01-10-2023 | 04-11-2023 | Dakpathar | Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun | Executive Engineer | Works of SITC of Various Capacity CPCB-IV Norms DG Set with Accessories at Dakpathar Dehradun. |
|
104. | 15/SPH/2023-24 | 23-09-2023 | 03-11-2023 | Lohiahead | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Maintenance contract and supply of spares/consumables for Sewage Treatment Plant” at Sharda Power House, Lohiahead, Khatima |
|
105. | 18/EE(Gen)/Khodri/2023-24 | 20-10-2023 | 02-11-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Urgent Repair work of damage rotor poles of Generator Unit no. 2 of Khodri Power Station. |
|
106. | 08/2023-24/EE/PCM(GV)/Mayapur | 18-10-2023 | 02-11-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Providing Manpower Services for a period of one year on outsource basis |
|
107. | 11/EE(G)/Chilla/2023-24 | 13-10-2023 | 02-11-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Annual Maintenance of electrical works of Chilla Power House |
|
108. | 11/EE(CM)/DDN/2023-24 | 13-10-2023 | 02-11-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | M&R work of Type- I residences of UJVN Limited at yamuna colony, Dehradun |
|
109. | 10/EE(CM)/DDN/2023-24 | 13-10-2023 | 02-11-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | M&R work in Type-V & OBC residences of UJVN Limited at yamuna colony, Dehradun. |
|
110. | 38/EE(M)/MB-II/23-24 | 12-10-2023 | 02-11-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of special T & P items for Dharasu Power House, MB-II Uttarkashi |
|
111. | 37/EE(M)/MB-II/23-24 | 12-10-2023 | 02-11-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of electrical Spares for Auxiliary system at Dharasu Power House |
|
112. | 40/EE(M)/MBII/23-24 | 12-10-2023 | 02-11-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing of Air Release Valves of 76 MW Turbine at Dharasu Power House |
|
113. | 39/EE (M)/MB-II/2023-24 | 12-10-2023 | 02-11-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Servicing of EHG-100/G-40 Governor of Turbine at Dharasu Power House |
|
114. | 07EE(Test)/GV/2023-24 | 11-10-2023 | 02-11-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer | Routine maintenance & testing related activities for Chilla, Pathri & Mohammadpur power houses under Ganga Valley Haridwar |
|
115. | 21/EE/PCM/Dhalipur/ 2023-24 | 09-10-2023 | 02-11-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Repair of Drains, Chambers & appurtenant structure of Dhakrani Power house (Dehradun) |
|
116. | 07/2023-24/EE(C-M)Vyasi Project | 27-09-2023 | 02-11-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Supply & Injection of polyurethane based two component inject resin grout, using Epoxy Injection gun, in Dam Galleries, Staircase & Lift well, at Dam of Vyasi HEP, Juddo, Dehradun |
|
117. | 12/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 10-10-2023 | 01-11-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Reconstruction of Mirapur side boundary wall at hydel colony Kalagarh. |
|
118. | 07/EE(E&M)/Vyasi Dam/2023-24 | 11-10-2023 | 01-11-2023 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd | Executive Engineer | Annual Sweeping, cleaning, up keeping & Sanitization work of Vyasi Dam, Juddo Dist- Dehradun |
|
119. | 05/EE(E&M-SHP)/Kaliganga-I/2023-24 | 06-10-2023 | 01-11-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer | Annual Operation and Maintenance of Kaliganga-I SHP (2x2 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag |
|
120. | 19/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 03-10-2023 | 01-11-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Development of Ramleela ground near CP type building at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi |
|
121. | 18/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 03-10-2023 | 01-11-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Development land and miscellaneous civil works in UJVNL office at Shaktipuram colony, MB-II, Chinyalisaur, Uttarkashi. |
|
122. | 13/EE-II (E&M)/LP/2023-24 | 27-09-2023 | 01-11-2023 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar | Executive Engineer | Supply of Lighting and wiring materials for Lakhwar Bhawan I, II, field hostel ,officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun |
|
123. | 06/EE(Civil-II)/LMP/2023-24 | 10-10-2023 | 31-10-2023 | Dakpathar | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun | Executive Engineer | “Special Repair of Field Hostel (Near inspection house), old Field Hostel (3 Story), and Sports Club at Dakpathar |
|
124. | 21/EE(Civil)/MB-I/TN/2023-24 | 09-10-2023 | 31-10-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Hiring of One number Non AC diesel Vehicle such as Mahindra Bolero or Equivalent with driver for one year for EE (Civil), MB-I, at Maneri, Uttarkashi. |
|
125. | 13/EE(C&M)/MB-II/ Joshiyara/2023-24 | 09-10-2023 | 31-10-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual civil maintenance & repair of T-III,T-II, P-I colony & non residential buildings of maneri bhali stage-II joshiyara colony uttarkashi. |
|
126. | 12/EE(C&M)/MB-II/ Joshiyara/2023-24 | 09-10-2023 | 31-10-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual civil maintenance & repair of P-III,P-II,P-IV colony & non residential buildings of maneri bhali stage-II joshiyara colony uttarkashi. |
|
127. | 09/2023-24/EE(C-M)Vyasi Project, Dakpathar | 17-10-2023 | 30-10-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Pool vehicle related to Civil-Maintenance works of Vyasi HEP Dakpathar, Dehradun for period of one yea |
|
128. | 10/EE(E&M)/PB/2023-24 | 07-10-2023 | 30-10-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Supply, Installation & testing of fire protection system along with fire safety products at Virbhadra barrage, Pashulok, Rishikesh. |
|
129. | 09/EE(E&M)/PB/2023-24 | 07-10-2023 | 30-10-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Overhauling of Transformers and Installation of earthings at Virbhadra Barrage, Pashulok, Rishikesh |
|
130. | 08/2023-24/EE (Civil)/UJVNL/Pashulok Barrage | 08-10-2023 | 30-10-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer | Special Repair of Glacis, Floor & End Sill of Virbhadra Barrage, Rishikesh |
|
131. | CH (MAINT.) - 22/2023-24 | 06-10-2023 | 30-10-2023 | Dakpathar | Dakpathar | Executive Engineer | Repairing & Maintenance work at Transport section & Central store of Chibro, Dakpathar |
|
132. | 20/EE/PCM/Dhalipur/ 2023-24 | 06-10-2023 | 30-10-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R works of Dhakrani Power House Colony at Dhakrani, (Dehradun) |
|
133. | 19/EE/PCM/Dhalipur/ 2023-24 | 06-10-2023 | 30-10-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R, cleaning and upkeeping work of Power Channel from Dhakrani village Bridge to Dhalipur Intake Dehradun |
|
134. | 09/EE(Civil-I)/KG-II/2023-24 | 23-09-2023 | 30-10-2023 | Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer | Special Repair and maintenance work at Diversion weir site of Kaliganga-II (2x2.25 MW) SHP in District – Rudraprayag |
|
135. | CH(Maint.)-25/2023-24 | 07-10-2023 | 28-10-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Supply of Self Lubricating Guide Vane Bushes (Top, Middle & Pivot Ring) of 60 MW Machine at Chibro |
|
136. | CH(Maint.)-23/2023-24 | 07-10-2023 | 28-10-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Procurement of various Fasteners for 60 MW machines of Chibro Power Station |
|
137. | 13/EE(G)/CPH/2023-24 | 06-10-2023 | 27-10-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Miscellaneous Safety & security items at Chibro Power House |
|
138. | 12/EE(G)/CPH/2023-24 | 06-10-2023 | 27-10-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | “Fabrication & supply of Special Tools & Tackles items for 4x60 MW Generator at Chibro Power House |
|
139. | 17/EEM/2023-24 | 06-10-2023 | 27-10-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Supply and Application of Coating Material on different Underwater parts in Unit No-1 &2 of Power House |
|
140. | 08/EE(Generation)/Vyasi/2023-24 | 29-09-2023 | 27-10-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | SITC of Fire Protection system for metering and protection panel at Vyasi HEP |
|
141. | 07/EE(Generation)/Vyasi/2023-24 | 29-09-2023 | 27-10-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Fabrication of Shed around DG Set at Vyasi HEP |
|
142. | 11/EE(E&M)/MB-II/Barrage/2023-24 | 25-09-2023 | 27-10-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Repairing and Rewinding of various pumps and motors at Joshiyara Barrage, MB-II, Uttarkashi |
|
143. | 10/EE(E&M)/MB-II/Barrage/2023-24 | 25-09-2023 | 27-10-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Strengthening of 11 kV MVCC network by connecting line from HRT feeder from Barrage to Colony Sub-Station Of Joshiyara Barrage |
|
144. | 23/EE (GEN)/MB-II/2023-24 | 14-09-2023 | 27-10-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of various spares for CCTV surveillance system at MB-II, Dharasu Power house, Chinyalisaur, Uttarkashi. |
|
145. | 24/EE(M&G)/MPH/2023-24 | 13-10-2023 | 26-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Providing & application of Glass Flake epoxy protective coating work over the surface of 8 Nos Intake Gates |
|
146. | 07/2023-24/EE (Civil)/UJVNL/Pashulok Barrage, Rishikesh | 05-10-2023 | 26-10-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer | Annual Maintenance & Repair of Power Channel of Chilla Hydro Electric Project. |
|
147. | 27/EEM&G)DKN/2023-24 | 05-10-2023 | 26-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Cold Galvanizing/ zinc rich coating on structures of 132/33 kV switchyard |
|
148. | 26/EEM&G)DKN/2023-24 | 05-10-2023 | 26-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Annual Operation Contract of 33 kV substation at Dhakrani Power Station |
|
149. | 21/EE(Pathri)/2023-24 | 26-09-2023 | 26-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Repairing & Overhauling of TRCM & Winch Machine and Repairing of damaged parts of Rail Tracks Line of TRCM & Debris Trolley. |
|
150. | 10/Manage(A&S)/2023-24 | 04-10-2023 | 25-10-2023 | Dehradun | Office of the Manager (A & S), UJJWAL. Maharani Bagh, Dehradun | Manager | Annual Operation, maintenance, cleaning and uEkeep of Transit Camp of UJVN Ltd At B-39 Sector 14, Noida (UP) |
|
151. | 18/EE(Maint.)/Khodri/2023-24 | 04-10-2023 | 25-10-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Hiring of one number non ac covered body light diesel vehicle for one year for Executive Engineer(Maint.) at khodri power station. |
|
152. | PDD-11/2023-24 | 04-10-2023 | 25-10-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Supply of Electrical wiring materials |
|
153. | PDD-12/2023-24 | 04-10-2023 | 25-10-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Repairing of 500 kVA and 160 kVA ( 11/0.4 kV ) Distribution Transformers |
|
154. | 23/EE(M&G)/MPH/2023-24 | 08-10-2023 | 23-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Repair and modification works in cooling water system including associated supply items at Power House. |
|
155. | 22/EE(M&G)/MPH/2023-24 | 08-10-2023 | 23-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Maintenance of electrical panels including some supply at Power House. |
|
156. | 21/EE(M&G)/MPH/2023-24 | 04-10-2023 | 23-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Inspection & testing of pressure/Lifting equipments and devices of Power House |
|
157. | 20/EE(M&G)/MPH/2023-24 | 04-10-2023 | 23-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Supply of MOLG, Bucholz including calibration and testing of MOLG, Bucholz relay etc. at Power House. |
|
158. | 19/EE(M&G)/MPH/2023-24 | 04-10-2023 | 23-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Repairing & Overhauling of LT air circuit breakers & other miscellaneous works at Power House |
|
159. | 03/EE(Civil-II)/Guptkashi/2023-24 | 28-09-2023 | 23-10-2023 | Guptkashi | Office of the Executive Engineer (Civil-II), UJVN Limited, Guptkashi | Executive Engineer | Supply and Fixing of Hoisting arrangement for Forebay gate and other Miscellaneous Hydro-mechanical works at Madhyamaheshwar SHP (3x5 MW) in Distt- Rudraprayag |
|
160. | 16/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 27-09-2023 | 23-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Supply of wooden furniture in Birja Inter college, Shaktipuram, Chinyalisaur, Uttarkashi. |
|
161. | 15/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 27-09-2023 | 23-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair of damaged protection work near TRC at Dharasu Power house complex MB-II Dharasu, Uttarkashi. |
|
162. | 19/EE(Civil)/MB-I/TN/2023-24 | 12-09-2023 | 23-10-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Hiring of One number Non AC diesel Vehicle such as Mahindra Bolero or Equivalent without driver for one year for all AEs (Civil), MB-I, at Maneri, Uttarkashi |
|
163. | 17/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 27-09-2023 | 21-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Supply of furniture and other miscellaneous items at Dhanvantri Public School, Naugaon, Uttarkashi. |
|
164. | 08/2023-24/EE(C-M)Vyasi Project | 06-10-2023 | 20-10-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun |
|
165. | 32/EE(Pathri)/2023-24 | 01-10-2023 | 20-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Cleaning, Repairing & Overhauling of Generator & Generator Air Coolers |
|
166. | 14/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 27-09-2023 | 20-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Balance Construction work of 04 No class rooms for Saraswati Vidya Mandir Inter college at Shaktipuram Colony , MB-II Chinyalisaur. |
|
167. | 14/EE(M)/VP/23-24 | 29-09-2023 | 19-10-2023 | Hathiyari | The office of Executive Engineer (Maint.), Vyasi Project Hathiyar | Executive Engineer | SITC of Protection structure in Spiral casing man hole , Drainage line outlet at TRC & cover over trench and associated work at Vyasi Power House, Hathiyari. |
|
168. | 23/EEM&G)DKN/2023-24 | 20-09-2023 | 19-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Wiring of Committee room, stores, parking & associated areas etc |
|
169. | 03/UJVNL/IT/EE(EM-II)/2023-24 | 03-10-2023 | 18-10-2023 | Dehradun | Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun | Executive Engineer | Supply, installation, testing & commissioning of Next Generation Firewalls (NGFW) and End Point protection platform at different sites of UJVN Limited. |
|
170. | 10/UJVNL/EE (M&G)/KPS/2023-24 | 27-09-2023 | 18-10-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Major repairing and overhauling of 28 rotor poles and Annual maintenance of Unit-C of Kulhal Power House (3 X 10 MW |
|
171. | 04/ EE(Civil)/SHP/Maneri /2023-24 | 27-09-2023 | 18-10-2023 | Uttarkashi | Office of the Executive Engineer (Civil)/SHP/Maneri Uttarkashi | Executive Engineer | Construction, Design, Supply, Installation and Testing of Silt Flushing System all complete for proper functioning and other miscellaneous works of (2x1125 kw) Pilangad SHP, at Bhatwari, Distt- Uttarkashi. |
|
172. | 24/EE(Pathri)/2023-24 | 26-09-2023 | 18-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Repairing & Rewinding of different types of motors |
|
173. | 23/EE(Pathri)/2023-24 | 26-09-2023 | 18-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Safety Audit of various equipment & T&P of Pathri Power House. |
|
174. | 22/EE(Pathri)/2023-24 | 26-09-2023 | 18-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Supply, Installation, Testing & Commissioning of Electric Crane Hoist, Store Racks Fabrication and other associated works of Central Store. |
|
175. | 28/EE(Pathri)/2023-24 | 03-10-2023 | 17-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Procurement of Miscellaneous consumable items for Pathri Power House |
|
176. | 16/EE(Gen)/Khodri/2023-24 | 25-09-2023 | 17-10-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance of Generators of 30 MW Hydro Machine No. 2 & 4 at Khodri Power Station. |
|
177. | 08/EE(E&M)/PB/2023-24 | 26-09-2023 | 17-10-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Annual Routine Sweeping and Cleaning work of Virbhdra Barrage, Pahulok, Rishikesh. |
|
178. | 07/EE(E&M)/PB/2023-24 | 26-09-2023 | 17-10-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Annual Routine Trash Cleaning work at Virbhadra Barrage, Pashulok Rishikesh |
|
179. | 08/EE(M)/2023-24 | 26-09-2023 | 17-10-2023 | Uttarkashi | The office of Executive Engineer (Maintenance),Tiloth Power House, Uttarkashi | Executive Engineer | Annual overhauling of unit 1, repair of various underwater parts & MIV of Tiloth Power House, Uttarkashi |
|
180. | 15/EE(Gen)/Khodri/2023-24 | 26-09-2023 | 17-10-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual contract for hiring of Non AC diesel vehicle for emergency duty along with round ‘O’ clock driver at Khodri Power Station |
|
181. | 14/EE(Gen)/Khodri/2023-24 | 26-09-2023 | 17-10-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual contract for hiring of 01 Nos. diesel vehicles along with drivers for EE (Generation) Khodri Power Station |
|
182. | 04/EE(E&M-SHP)/MM/2023-24 | 20-09-2023 | 17-10-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer | Hiring of One No Diesel Vehicle for 06 (Six) months with driver (non-AC) of make Mahindra Bolero or equivalent for E&M works of Kaliganga-I SHP, Kaliganga-II SHP, Madhyamaheshwer SHP and 33kV Transmission Line in Distt. Rudraprayag, Uttarakhand |
|
183. | 31/EE(Pathri)/2023-24 | 01-10-2023 | 16-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Calibration of all RTD’s and Cleaning of cable trenches & electrical panels |
|
184. | 30/EE(Pathri)/2023-24 | 01-10-2023 | 16-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Polypoxy protective coating works on Intake Gates of Machine no.1 & 2 and End Suction Type Centrifugal Pumps |
|
185. | 29/EE(Pathri)/2023-24 | 01-10-2023 | 16-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Service overhauling works of gear boxes of hoist drive lifting mechanism of intake gates. |
|
186. | 16/EEM/2023-24 | 26-09-2023 | 16-10-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Procurement of Miscellaneous stationary items at Chilla Circle Office |
|
187. | 15/EEM/2023-24 | 26-09-2023 | 16-10-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing of 33 kV Chilla- Bhupatwala Feeder at Neeldhara in River Ganga |
|
188. | 04/EE(E&M)/DKP BRG/2023-24 | 25-09-2023 | 16-10-2023 | Dakpathar | Office of Executive Engineer (E&M), Dakpathar Barrage | Executive Engineer | Annual Trash rack cleaning and conducting flushing during Monsoon period at Dakpathar Barrage. |
|
189. | 03/EE(E&M)/DKP BRG/2023-24 | 25-09-2023 | 16-10-2023 | Dakpathar | Office of Executive Engineer (E&M), Dakpathar Barrage | Executive Engineer | Rewiring works in Control room of Dakpathar barrage |
|
190. | 03/EE(P&C)/2023-24 | 22-09-2023 | 16-10-2023 | Dehradun | Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun | Executive Engineer | Procurement of different Tyres& Tube for various Power House/Sites of UJVN LTD. |
|
191. | 03/EE(P&C)/2023-24 | 22-09-2023 | 16-10-2023 | Dehradun | Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun | Executive Engineer | Procurement of different Tyres& Tube for various Power House/Sites of UJVN LTD. |
|
192. | 13 /EE(Civil)/MB-II/ Chinyalisaur/2023-24 | 23-09-2023 | 16-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur, Uttarkashi | Executive Engineer | Housekeeping, Up keeping and Operation of Field Hostel at Shaktipuram Colony, Chinyalisaur, Uttarkashi . |
|
193. | 20/EE(Pathri)/2023-24 | 22-09-2023 | 14-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Supply and application of coating material on concrete surface of Spiral Casing of Machine No.3 of Pathri Power House. |
|
194. | 28/EE(M)/MB-II/23-24 | 14-09-2023 | 14-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Maintenance for Hydro-Mechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months. |
|
195. | 27/EE(M)/MB-II/23-24 | 14-09-2023 | 14-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of MIV Mechanical Seal Stud Assembly Spares at Dharasu Power House, MB-II |
|
196. | 05/UJVNL/EE(C-SBR)/2023-24 | 28-09-2023 | 13-10-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | Drifting Work for Geological & Geotechnical Investigation for Sirkari Bhyol Rupsiabagar HEP on Goriganga River, Munsiyari, Pithoragarh. |
|
197. | 10/EE(G)/Chilla/2023-24 | 23-09-2023 | 13-10-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Repairing of 11/0.4 kV, 500 kVA unit auxiliary transformer no. 02 of Chilla Power House. |
|
198. | 14/SPH/2023-24 | 22-09-2023 | 13-10-2023 | Lohiahead | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, of Unit 3 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead as per technical specifications |
|
199. | NIT-36/EE (M)/MB-II/2023-24 | 22-09-2023 | 13-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Epoxy Painting of Turbine, MIV and other equipment at Dharasu Power House M.B -II Uttarkashi. |
|
200. | NIT-35/EE (M)/MB-II/2023-24 | 22-09-2023 | 13-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing of TGB and shaft seal cooling valve of turbine at Dharasu Power House, MB-II, Uttarkashi |
|
201. | 18/EE/PCM/Dhalipur/ 2023-24 | 21-09-2023 | 13-10-2023 | Dhalipur | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Annual M&R works of Dhalipur Power House at Dhalipur, Dehradun |
|
202. | 06/EE(E&M)/PB/2023-24 | 23-09-2023 | 12-10-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Annual Routine Maintenance of hydro Mechanical and Electro Mechanical components of Virbhadra Barrage Pashulok, Rishikesh. |
|
203. | 18/EE(M&G)/MPH/2023-24 | 22-09-2023 | 12-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Supply and application of putty on metallic & concrete surface of Unit No.1 |
|
204. | 17/EE(M&G)/MPH/2023-24 | 22-09-2023 | 12-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Refurbishment & Annual Maintenance of CCTV Surveillance System for the period of One Year |
|
205. | 16/EE(M&G)/MPH/2023-24 | 22-09-2023 | 12-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | – Procurement & refilling of various fire extinguishers installed at Power House. |
|
206. | 17/EE(Maint.)/Khodri/2023-24 | 21-09-2023 | 12-10-2023 | Dakpathar | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Supply and Installation of Letter Base Alex (Alutech) with Transparent Acrylic conformal Coating and Sandwich Frame with Electric wiring work at Khodri Power Station |
|
207. | 11/EE(G)/CPH/2023-24 | 21-09-2023 | 12-10-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Repairing, Re-Tubing and testing of spare bearing cooler set for unit- 1&3 of 60 MW Generator at Chibro Power House |
|
208. | 10/EE(G)/CPH/2023-24 | 21-09-2023 | 12-10-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Annual maintenance of the coolers, valves & pumps of 69 MVA Generator Transformers of Unit-1,2&4 and rewinding of 33/11kV, 1.5 MVA Transformer at Chibro Powerhouse |
|
209. | 27/EE (GEN)/MB-II/2023-24 | 21-09-2023 | 12-10-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing & Re-tubing of Thrust & UGB/LGB Water Cooler of 76 MW Hydro Generators at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
210. | 26/EE (GEN)/MB-II/2023-24 | 21-09-2023 | 12-10-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Maintenance of Garden and Operation of canteen at Dharasu Power House for the year 2023-24. |
|
211. | 25/EE (GEN)/MB-II/2023-24 | 21-09-2023 | 12-10-2023 | Chinyalisaur | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Safety audit of various equipment’s and T&P at MB-II, Dharasu Power House and Joshiyara Barrage. |
|
212. | 17/EE/PCM/Dhalipur/ 2023-24 | 20-09-2023 | 12-10-2023 | Dhalipur | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | General cleaning and up keeping park of Power House Colony at Kulhal (Dehradun) |
|
213. | 27/EE(Pathri)/2023-24 | 27-09-2023 | 11-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Supply, Installation & Commissioning of Radiator Cooling Fans in Schneider make 12 MVA Power Transformer at Pathri Power House |
|
214. | 26/EE(Pathri)/2023-24 | 27-09-2023 | 11-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Activation of 11 KV 2nd no. Bus Bar, shifting & replacing of O.C.B.s and other allied works of Pathri Power House |
|
215. | 25/EE(Pathri)/2023-24 | 27-09-2023 | 11-10-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Miscellaneous mechanical maintenance works of Machine no.1, 2 & 3 of Pathri Power House |
|
216. | 05/EE(Civil-II)/LMP/2023-24 | 26-09-2023 | 11-10-2023 | Dakpathar | Office of the Executive Engineer (Civil-II), Lakhwar Project, Lakhwar Bhawan, Dakpathar | Executive Engineer | Hiring of one number light diesel Vehicle (Mahindra make bolero or equivalent) along with driver for Executive Engineer (Civil-II), Lakhwar MPP, Dakpathar, Dehradun for project related works for a period of One year |
|
217. | NIT-34/EE (M)/MB-II/2023-24 | 20-09-2023 | 11-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair of Hydraulic Torque Wrenches and other T&P at Dharasu Power House, Uttarkashi. |
|
218. | NIT-33/EE (M)/MB-II/2023-24 | 20-09-2023 | 11-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing and Overhauling of Centralized Greasing System and other works at Dharasu Power House, MB-II, Uttarkashi. |
|
219. | NIT-32/EE (M)/MB-II/2023-24 | 20-09-2023 | 11-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Rewiring in residential/ non-residential buildings at Shaktipuram Colony, Chinyalisaur |
|
220. | NIT-31/EE (M)/MB-II/2023-24 | 20-09-2023 | 11-10-2023 | Chinyalisaur | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Supply and Installation of Penstock Drain Valve at Dharasu Power House, MB-II |
|
221. | 09/EE(CM)/DDN/2023-24 | 20-09-2023 | 11-10-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | General Cleaning and Sweeping of Ganga Bhawan, Yamuna Bhawan of UJVN Limited at Yamuna Colony, Dehradun |
|
222. | 08/EE(CM)/DDN/2023-24 | 20-09-2023 | 11-10-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | General Cleaning and Sweeping of Residential premises of UJVN Limited at Yamuna Colony, Dehradun |
|
223. | 25/EEM&G)DKN/2023-24 | 20-09-2023 | 11-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Hiring of One No. AC diesel vehicle for GM(YV-II) on Annual Contract basis |
|
224. | 24/EEM&G)DKN/2023-24 | 20-09-2023 | 11-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | “Repair & overhauling of workshop equipment & other misc. procurement |
|
225. | 16/EE(Maint.)/Khodri/203-24 | 18-09-2023 | 10-10-2023 | Dakpathar | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance Contrat for Mechanical Auxiliary and Central Store, Khodri. |
|
226. | 15/EE(Maint.)/Khodri/2023-24 | 18-09-2023 | 10-10-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement of Fasteners and Consumable items of Khodri Power station |
|
227. | 14/EE(Maint.)/Khodri/2023-24 | 18-09-2023 | 10-10-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement of 4 nos. Shaft Sleeves for 30 MW Machine of Khodri Power Station |
|
228. | 24/EE (GEN)/MB-II/2023-24 | 15-09-2023 | 10-10-2023 | Chinyalisaur | The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing & Replacement of damaged fire hydrant pipeline of transformer bay side at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
229. | 19/EE/PCM-DKP/TN/2023-24 | 24-09-2023 | 09-10-2023 | Dakpathar | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Hiring of one number diesel vehicle such as Mahindra bolero or equivalent (excluding fuel) with driver for office of Dy. General Manager, Civil Maintenance – Dakpathar |
|
230. | 11/EE(Gen)/Khodri/2023-24 | 18-09-2023 | 09-10-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Modification of Breaking & Jacking system of Machine No. 01,02,03 & 04 at Khodri Power Station |
|
231. | 10/EE(Gen)/Khodri/2023-24 | 18-09-2023 | 09-10-2023 | Dakpathar | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance Contract (AMC) of CCTV surveillance system of Khodri Power Station |
|
232. | 13/EE(Gen)/Khodri/2022-23 | 18-09-2023 | 09-10-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement of Electrical spares and Consumable for 220kV Switchyard of Khodri Power Station |
|
233. | 12/EE(Gen)/Khodri/2023-24 | 18-09-2023 | 09-10-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Contract for O&M works of Khodri Power Station. |
|
234. | 11/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 16-09-2023 | 09-10-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Repair & Reconstruction of Inspection Chambers, Septic tanks and Soak pits in Type – III residences at Hydel Colony Kalagarh |
|
235. | 10/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24. | 16-09-2023 | 09-10-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Repair & Reconstruction of Inspection Chambers, Septic tanks and Soak pits in Type – Ist residences at Hydel Colony Kalagarh |
|
236. | 29/EE (M)/MB-II/2023-24 | 18-09-2023 | 09-10-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Protective Coating of underwater parts of turbine of Dharasu Power House Uttarkashi |
|
237. | NIT- 30/EE(M)/MB-II/23-24 | 18-09-2023 | 09-10-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) |
|
238. | 06/EE(Test)/DKP/2023-24 | 16-09-2023 | 09-10-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Maintenance and testing activities of all four 4x60MW Chibro Power House units |
|
239. | 07/EE (Civil-I)/LMP/2023-24 | 15-09-2023 | 09-10-2023 | Dakpathar | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Miscellaneous repair/maintenance work at project site of Lakhwar MPP (Dehradun) |
|
240. | 06/EE (Civil-I)/LMP/2023-24 | 15-09-2023 | 09-10-2023 | Dakpathar | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Construction of Temporary Transit Camp for Lakhwar Multipurpose Project at Kandriyan, District-Tehri Garhwal . |
|
241. | CH (MAINT.) - 21/2023-24 | 18-09-2023 | 09-10-2023 | Dakpathar | Office of Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Capital Maintenance Work of 60 MW Hydro Turbine, Generator and Associated Equipment’s of Unit # 4 |
|
242. | 14/EE(M&G)/MPH/2023-24 | 07-09-2023 | 09-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Repairing, Desilting and painting of overhead Cooling water tanks including related supply |
|
243. | 02/EE(E&M)/DKP BRG/2023-24 | 07-09-2023 | 09-10-2023 | Dakpathar | Office of Executive Engineer (E&M), Dakpathar Barrage | Executive Engineer | Annual contract for caulking the leakage of under sluice and barrage way gates at Dakpathar Barrage. |
|
244. | 16/EE(Pathri)/2023-24 | 07-09-2023 | 09-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Removal of Silt from Up-stream, Down-stream, By-pass gates galleries & Fore bays. |
|
245. | 06/EE(Gen)/Vyasi/23-24 | 29-08-2023 | 09-10-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Annual Contract for Operation and Routine Electrical Maintenance works at Vyasi Power Station |
|
246. | 22/EEM&G)DKN/2023-24 | 16-09-2023 | 07-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Annual Operation & maintenance of Officer transit camp & mango orchard |
|
247. | 21/EEM&G)DKN/2023-24 | 16-09-2023 | 07-10-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | In situ repair of Shaft Journal, Runner Blades & miscellaneous mechanical maintenance work of Unit -C |
|
248. | 05 EE(Test)/GV/2023-24 | 16-09-2023 | 07-10-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer | SITC of CCTV Camera and Integration with Existing . LAN for Central Store and Chilla Power House |
|
249. | 08/EE (Civil-I)/Srikot/2023-24 | 12-09-2023 | 07-10-2023 | Srinagar | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer | Construction of Community store in Gram Panchayat Kotma, Tehsil Ukhimath, District – Rudraprayag. |
|
250. | 20/EE(Civil)/MB-I/TN/2023-24 | 12-09-2023 | 07-10-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Construction of Community Meeting centre and Renovation of Devi Mata Mandir near Panchayat chowk at Gram Panchayat Maneri, Uttarkashi |
|
251. | PDD-10/2023-24 | 15-09-2023 | 06-10-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Distt-Dehradun) | Executive Engineer | Supply & Fixing of 11 kV single phase covered conductor along with other accessories |
|
252. | 12/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 15-09-2023 | 06-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual supply of Stationary items at the office of EE (Civil), MB-II, Chinyalisaur, Utttarkashi. |
|
253. | 11/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 15-09-2023 | 06-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Safety audit of Misc. Building, Pumping station and STP at MB-II Project, Chinyalisaur, Uttarkashi. |
|
254. | 10/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 15-09-2023 | 06-10-2023 | Chinyalisaur | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Anti-termite treatment work at residential and nonresidential building at Shaktipuram Colony, MB-II, Chinyalisaur, Uttarkashi. |
|
255. | 12/EE-II (E&M)/LP/2023-24 | 15-09-2023 | 06-10-2023 | Dakpathar | Office of the Executive Engineer-II (E&M),Lakhwar Project, Dakpathar | Executive Engineer | Purchasing of 100Mbps Internet Leased Line with static IP for Lakhwar Bhawan I & II for Dakpathar, Distt Dehradun. |
|
256. | 02 / अ०अ० (वि0/या०)/मनेरीबांध / 2023-24 | 12-09-2023 | 05-10-2023 | मनेरी | अधिशासी अभियन्ता (वि0/या०). मनेरी बांध मनेरी उत्तरकाशी | Executive Engineer | अधि0अभि0 (वि0/या०), मनेरी बांध, मनेरी, उत्तरकाशी के प्रयोगार्थ एक वर्श की अवधि हेतु एक डीजल चालित वाहन (वातानुकूलित रहित) चालक सहित किराये पर लेने हेतु । |
|
257. | CH(Maint.)-20/2023-24 | 13-09-2023 | 05-10-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement & Replacement of 4” Oil Pipe line & its accessories of two units at Chibro Power Station. |
|
258. | CH(Maint.)-19/2023-24 | 13-09-2023 | 05-10-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Miscellaneous repair & maintenance works of auxiliary systems of 60 MW Turbine of Chibro Power Station |
|
259. | 10/EE(C&M)/MB-II/Joshiyara/2023-24 | 05-09-2023 | 05-10-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual Operation and Maintenance of 50 KLD Capacity MBR Technology based STP at Joshiyara, Uttarkashi. |
|
260. | 09/Manager(A&S)/2023-24 | 15-09-2023 | 04-10-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager | Hiring of vehicle along with driver for corporate office, UJJWAL Maharani Bagh, G.M.S. Road, Dehradun |
|
261. | 08/EE (Civil-III)/LMP/2023-24 | 14-09-2023 | 04-10-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Supply of Stationery Items for the offices of Lakhwar MPP Dakpathar, Dehradun |
|
262. | 06/EE(E&M)(SHP)/Rishikesh/2023-24 | 18-09-2023 | 03-10-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh | Executive Engineer | “Repair and Maintenance of BFV and Other associated miscellaneous work of Unit#2 at (2x1500kW) Urgam SHP in District Chamoli Uttarakhand |
|
263. | 15/EE(M&G)/MPH/2023-24 | 13-09-2023 | 03-10-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Annual maintenance work of Unit No. 1 & 3. |
|
264. | T-13/EEM/2023-24 | 11-09-2023 | 03-10-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Maintenance) Chilla. |
|
265. | 09/EE(G)/CPH/2023-24 | 09-09-2023 | 03-10-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Refilling of Fire Extinguishers at Chibro Power House |
|
266. | CH(Maint.)-18/2023-24 | 09-09-2023 | 03-10-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Repairing of 01 No. Francis runner at Chibro Power Station. |
|
267. | 09/EE (E&M-II, LWR) VP/2023-24 | 23-08-2023 | 03-10-2023 | Dakpathar | Office of the Executive Engineer-II (EM-LWR), Vyasi Project, Dakpathar, UJVN Ltd. | Executive Engineer | SITC of Street Light for 33/11 kV Lakhwar Substation in District- Dehradun |
|
268. | 14/EE(M)/RPSK/2023-24 | 11-08-2023 | 03-10-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for Dy. General Manager (E&M) Kalagarh. |
|
269. | 02/EE(P&C)/2023-24 | 25-08-2023 | 02-10-2023 | Dehradun | Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun | Executive Engineer | Procurement of Canon Make cartridges for various office of UJVN Ltd. located at Dehradun. |
|
270. | 09/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 07-09-2023 | 30-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Flood Protection work at Dhanari Gad adit near Dhanari, MB-II, Uttarkashi. |
|
271. | 16/EE/PCM/Dhalipur/ 2023-24 | 08-09-2023 | 30-09-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | General cleaning & upkeeping work of Asan Barrage, Park and Associated Structures at Dhalipur, Dehradun |
|
272. | 03/EE(E&M-SHP)/Dharchula/2023-24 | 14-08-2023 | 30-09-2023 | Dharchula | Office of the Executive Engineer (E&M-SHP), Dharchula | Executive Engineer | Hiring of one number diesel driven small vehicle (M&M Bolero or equivalent, non AC) for 12 months along with driver for the office of EE (E&M-SHP), Dharchula in District Pithoragarh. |
|
273. | 07/EE (Civil-III)/LMP/2023-24 | 09-09-2023 | 29-09-2023 | Dehradun | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Construction of Public Toilet for project effected villagers of vill-Kwaansha at Kalsi block, Dehradun Of LMPP |
|
274. | 20/EE(M&G)/DKN/2023-24 | 07-09-2023 | 29-09-2023 | Dhakrani | Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun | Executive Engineer | Procurement of safety and security equipment |
|
275. | 19/EEM&G)DKN/2023-24 | 07-09-2023 | 29-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Various Electrical Maintenance Work of Unit-C |
|
276. | 18/EEM&G)DKN/2023-24 | 07-09-2023 | 29-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Repair & overhauling of Guide vane locks and air release valves of Unit B & C |
|
277. | 19/EE(Pathri)/2023-24 | 07-09-2023 | 29-09-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Repairing & Maintenance of Trash Rack Screens. |
|
278. | 18/EE(Pathri)/2023-24 | 07-09-2023 | 29-09-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Repairing and overhauling of Bypass Water Conductor System 12” Gate Valves, Gate / Globe Valves of cooling water system and other miscellaneous works of Water Conducting System. |
|
279. | 17/EE(Pathri)/2023-24 | 07-09-2023 | 29-09-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Repairing & Painting of Draft Tube Gantry Crane, Stop Log Crane, Draft Tube Gates, Cooling Water Overhead Tank & water pipelines of Pump House. |
|
280. | 12/EEM/2023-24 | 08-09-2023 | 29-09-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Annual Maintenance work of Two Units and Major Maintenance work of One Unit at Chila Power House |
|
281. | 06/UJVNL/EE(M&G)/KPS/2023-24 | 11-08-2023 | 29-09-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Annual Maintenance Contract of 33kV and 11 kV lines from 33/11kV Substation Kulhal. |
|
282. | 03/EE(Civil-II)/LMP/2023-24 | 12-09-2023 | 27-09-2023 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun | Executive Engineer | Annual Cleaning, Upkeeping, Gardening of field hostel and officer’s sports complex of Lakhwar Project at Dakpathar, Dehradun (Year 2023-24). |
|
283. | 13/EE(M&G)/MPH/2023-24 | 07-09-2023 | 27-09-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Repair and painting work over trash rack screens |
|
284. | 04/UJVNL/EE(C-SBR)/2023-24 | 04-09-2023 | 27-09-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | Hiring of diesel driven small vehicle for Official Pool of O/o Executive Engineer (Civil), SBR Project, Munsiyari Pithoragarh for a period of 12 months. |
|
285. | 22/EE (GEN)/MB-II/2023-24 | 02-09-2023 | 27-09-2023 | Uttarkashi | Office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Cleaning and repairing of stator core punching of 76 MW Capacity Hydro Generators of Dharasu Power House, MB-II, Chinyalisaur, Uttarkashi |
|
286. | 09/SPH/2023-24 | 07-08-2023 | 27-09-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Procurement of 2 nos 12.5 HP Submersible pump motor set and 02 nos 15 HP Submersible pump motor set” at Sharda Power House, Lohiahead, Khatima |
|
287. | 04/EE(Civil-II)/LMP/2023-24 | 16-09-2023 | 26-09-2023 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. | Executive Engineer | Carrying out various geophysical investigations in drilled holes at Lakhwar MPP, Dehradun |
|
288. | T-14/EEM/2023-24 | 12-09-2023 | 26-09-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for DGM (HGC), Chilla |
|
289. | 18/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual operation & maintenance of Water supply distribution system of Maneri Dam Colony, Maneri, Uttarkashi. |
|
290. | 17/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual Cleaning & Gardening of Maneri Dam Complex at Maneri, Uttarkashi. |
|
291. | 16/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual operation & maintenance of Gauge and Discharge Site at Heena, Uttarkashi. |
|
292. | 07/EE(CM)/DDN/2023-24 | 05-08-2023 | 26-09-2023 | Dehradun | Office of The Executive Engineer (Civil Maint.) Yamuna Bhawan, Dehradun | Executive Engineer | Repair of Boundary wall and Beautification works of School Building at Junior High School against CSR head at Sunderwala, Nalapani, District-Dehradun, Uttarakhand. |
|
293. | 15/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and Drains in Kuteti Devi Colony, Uttarkashi. |
|
294. | 14/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and drains in Tiloth Colony, Uttarkashi. |
|
295. | 13/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Civil Maintenance & repair of Various type of Residences at TilothColony,Uttarkashi |
|
296. | 12/EE(Civil)/MB-I/TN/2023-24 | 04-09-2023 | 26-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Civil Maintenance & Repair of Tiloth Power House Complex, Uttarkashi. |
|
297. | 10/EE(E&M-I)/LP/2023-24 | 15-08-2023 | 26-09-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer | Annual maintenance of 33 KV, 11 KV & LT lines |
|
298. | 11/EE(Civil)/MB-I/TN/2023-24 | 02-09-2023 | 25-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual operation & maintenance of Mulsifyre water line & cooling water line of Tiloth power house, Uttarkashi |
|
299. | 10/EE(Civil)/MB-I/TN/2023-24 | 02-09-2023 | 25-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual operation & maintenance Of water Supply Distribution System of Kuteti Colony at Uttarkashi. |
|
300. | 09/EE(Civil)/MB-I/TN/2023-24 | 02-09-2023 | 25-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual operation & maintenance of Water supply distribution system of Tiloth Colony, Uttarkashi |
|
301. | 03 /EE (Test)/MB-II/2023-24 | 28-08-2023 | 25-09-2023 | Uttarkashi | The office of Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Application of Insulation Epoxy coating on floor area under or around various Electrical Main/Sub Distribution Boards (415V AC), Power Convenience Boards (415V AC), Cooling water pump panels, UAT Temp. Indication Marshalling Box and DG Set control panels in Dharasu Power House MB-II, Chinyalisour, Uttarkashi |
|
302. | 19/EE (GEN)/MB-II/2023-24 | 25-08-2023 | 25-09-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Providing and Fixing of Residual Current Circuit Breaker (RCCB) and Insulation Mat at MB-II, Dharasu Power House. |
|
303. | 08/EE(G)/CPH/2023-24 | 02-09-2023 | 23-09-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Annual maintenance of 60 MW generator & associated equipment of unit 1 & 2 at Chibro Power House |
|
304. | e-02/UJVNL/IT/EE(EM-II)/2023-24 | 26-08-2023 | 23-09-2023 | Dehradun | Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun | Executive Engineer | Supply, installation, testing & commissioning of Next Generation Firewalls (NGFW) and End Point protection platform at different sites of UJVN Limited |
|
305. | 04/EE(G)/Klg/2023-24 | 07-08-2023 | 23-09-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer | Calibration of Instruments. |
|
306. | 05/2023-24/EE/PCM(GV)/Mayapur | 01-09-2023 | 22-09-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Providing Toilet facility for Women, Guard & AE (E&M) at Pathri |
|
307. | 06/EE (Civil-I)/Srikot/2023-24 | 25-08-2023 | 22-09-2023 | Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer | Providing Tin Shed over footpath at Kalimath Temple in District – Rudraprayag |
|
308. | 17/EEM&G)DKN/2023-24 | 31-08-2023 | 21-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Various electrical maintenance work of Unit-B |
|
309. | 16/EEM&G)DKN/2023-24 | 31-08-2023 | 21-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Supply & fixing of Labyrinths and Shaft Sleeve |
|
310. | 08/EE(Gen)/Khodri/2023-24 | 12-08-2023 | 21-09-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Repair & Re-insulation of rotor pole of 30MW generator of Khodri Power Station |
|
311. | 15/EEM&G)DKN/2023-24 | 30-08-2023 | 20-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Modification in 11 kV system for redundancy of supply |
|
312. | 14/EEM&G)DKN/2023-24 | 30-08-2023 | 20-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Re-Rubberisation of water lubricated lower guide bearing |
|
313. | 13/EEM&G)DKN/2023-24 | 30-08-2023 | 20-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Supply & Fixing of signboards |
|
314. | 10/SPH/2023-24 | 07-08-2023 | 20-09-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | SITC of 02nos. 132 kV SF6 circuit breaker and dismantling of 02 nos. existing 132 kV circuit breakers along with the supply of essential spares” at Sharda Power House, Lohiahead, Khatima |
|
315. | 13/EE(Maint.)/Khodri/2023-24 | 29-09-2023 | 19-09-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance of 30MW Francis turbines and associated equipment of Unit 2&4 of Khodri Power Station. |
|
316. | 12/EE(Maint.)/Khodri/2023-24 | 28-08-2023 | 19-09-2023 | Dakpathar | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | – Supply & application of protective metallic coating on stay vanes and stay ring of unit No.1 of Khodri power station |
|
317. | 11/EE(Maint)/Khodri/2023-24 | 28-08-2023 | 19-09-2023 | Dakpathar | Office of Executive Engineer (Maint), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Corrosion and abrasion protection of spiral casing with Advanced Ceramics composite in Unit No-4 of Khodri Power Station |
|
318. | 21/EE (GEN)/MB-II/2023-24 | 28-08-2023 | 19-09-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of various items for Generator maintenance, MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi |
|
319. | 01/2023-24/EE(HM-I)/CD&H,Rishikesh | 29-08-2023 | 19-09-2023 | Dehradun | Office of Executive Engineer (HM-I), CD&H, Pashulok, Rishikesh, Dehradun | Executive Engineer | Hiring of one no. light non AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for use as pool vehicle by Executive Engineers, in GM(CDH&NP) office Rishikesh. |
|
320. | 10/EE(Maint.)/Khodri/2023-24 | 25-08-2023 | 19-09-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance of 30MW Francis turbines and associated equipment of Unit 1&3 of Khodri Power Station. |
|
321. | 09/EE(Gen)/Khodri/2023-24 | 25-08-2023 | 19-09-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance of Generator of 30 MW Hydro Machine No. 1 & 3 at Khodri Power Station. |
|
322. | 12/EEM&G)DKN/2023-24 | 27-08-2023 | 18-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | “In situ repair of Shaft Journal, Runner Blades & miscellaneous mechanical maintenance work of Unit -B |
|
323. | 11/EEM&G)DKN/2023-24 | 27-08-2023 | 18-09-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Testing of various equipment & T&P. |
|
324. | CH(Maint.) - 17/2023-24 | 26-06-2023 | 18-09-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance Works of unit no 01 & Unit no 02 at Chibro Power Station |
|
325. | 08/EE(Civil)/MB-I/TN/2023-24 | 24-08-2023 | 18-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Repair of existing foot track from Maneri dam site to village Jamak, at Maneri, Uttarkashi. |
|
326. | NCB/05/EE(E&M)/PB/2023-24 | 18-08-2023 | 18-09-2023 | Rishikesh | Office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Strengthening of Barrage gates with application of Zinc rich chemical compound at Virbhadra Barrage under DRIP-II. |
|
327. | 12/EE(M)/RPSK/2023-24 | 23-07-2023 | 18-09-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Hiring of one no. light motor vehicle AC (Mahindra Scorpio or equivalent) along with driver for a period of twelve months for the office of General Manager (R&S). |
|
328. | 07/EE(Civil-I)/Urgam/2023-24 | 28-08-2023 | 17-09-2023 | Garhwal | Office of the Executive Engineer (Civil-I)/SHP, UJVN Limited, Srikot, Srinagar Garhwal | Executive Engineer | Restoration and Protection work of Escape pipe at Urgam SHP (2x1.5 MW) in Distt- Chamoli |
|
329. | 7e/EE(G)/CPH/2023-24 | 27-08-2023 | 16-09-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Annual Contract for maintenance of 11kV lines and operation work of 33/11kV Sub Station at Chibro Power House |
|
330. | T-10/EEM/2023-24 | 27-08-2023 | 16-09-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Fabrication and Supply of Runner Servo Tube Assembly for Units of Chilla Power House |
|
331. | 18/EE (GEN)/MB-II/2023-24 | 24-08-2023 | 16-09-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of different spares for Generator auxiliary systems at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
332. | 17/EE (GEN)/MB-II/2023-24 | 24-08-2023 | 16-09-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of miscellaneous general consumable items at MB-II, Dharasu Power House |
|
333. | 20/EE (GEN)/MB-II/2023-24 | 25-08-2023 | 16-09-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Silver coating of Male and Female contacts of 220 kV Isolators installed at 220 kV switchyard of Dharasu Power House |
|
334. | 05/EE (Civil-I)/LMP/2023-24 | 16-08-2023 | 15-09-2023 | Dakpathar | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Repair/Reconstruction of Left bank road from Juddo to Dam Top for Lakhwar Multipurpose Project |
|
335. | 12/SPH/2023-24 | 17-08-2023 | 15-09-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Procurement of Personal Protection Equipment (PPE)/Safety Equipment for employees” at Sharda Power House, Lohiahead |
|
336. | 18/EE/PCM-DKP/TN/2023-24 | 16-08-2023 | 14-09-2023 | Dakpathar | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Construction of Water Intake Chamber and Laying of Drinking water Supply Pipeline for Koti, Dehradun |
|
337. | 15/EE (GEN)/MB-II/2023-24 | 08-08-2023 | 13-09-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur), | Executive Engineer | Procurement of microcontroller based magnetic flow meter for cooling lines at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi . |
|
338. | 05/EE(Civil-I)/KG-I/2023-24 | 02-08-2023 | 12-09-2023 | Srinagar Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot, Srinagar Garhwa | Executive Engineer | Special Repair & Strengthening of Diversion Weir at Kaliganga-I SHP (2x2 MW) in Distt- Rudraprayag. |
|
339. | T-11/EEM/2023-24 | 27-08-2023 | 11-09-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing of 33 kV Chilla- Bhupatwala Feeder at Neeldhara in River Ganga |
|
340. | 13/SPH/2023-24 | 19-08-2023 | 11-09-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima, | Executive Engineer | Annual general cleaning of power houses and other places at Sharda Power House, Lohiahead for one year |
|
341. | 09/EE(Civil)/Lohiahead/Khatima/2023-24 | 18-08-2023 | 11-09-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | Annual Operation, Cleaning & Upkeeping of Staying Facility and Office of Executive Engineer (Civil), UJVN Ltd. at Sharda Power House, Lohiahead Khatima for the year 2023-24 |
|
342. | 08/EE(Civil)/Lohiahead/Khatima/2023-24 | 18-08-2023 | 11-09-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | Annual Horticulture Maintenance, Development of Lawns and Clearing grass at Sharda Power House Lohiahead for the year 2023-24 |
|
343. | 07/EE(Civil)/Lohiahead/Khatima/2023-24 | 18-08-2023 | 11-09-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | Annual General Cleaning work of Lohiahead colony for the year 2023-24 |
|
344. | 15/EE(Pathri)/2023-24 | 18-08-2023 | 11-09-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Various Electrical repair and maintenance works at 66kV Switchyard at Pathri Power House. |
|
345. | 14/EE(Pathri)/2023-24 | 18-08-2023 | 11-09-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Repairing, Servicing and Overhauling of 66KV Isolators & Earth Links at Pathri Power House. |
|
346. | 13/EE(Pathri)/2023-24 | 18-08-2023 | 11-09-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Repairing & Rewinding of 250KVA & 300KVA Transformer & SITC of one no. new LT MBD Panel at Pathri Power House |
|
347. | 09/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 16-08-2023 | 11-09-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Leakage Treatment of Kalagarh Inter College at Kalagarh. |
|
348. | 15/EE/PCM/Dhalipur/ 2023-24 | 17-08-2023 | 11-09-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Repair of Boundary wall of Primary School at Dhakrani Power House Colony, Dhakrani, Dehradun |
|
349. | 12/EE(M&G)/MPH/2023-24 | 19-07-2023 | 11-09-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar | Executive Engineer | Repairing and painting of Tilting gates including supply of seals & fasteners |
|
350. | 06/EE(G)/CPH/2023-24 | 24-08-2023 | 08-09-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro, | Executive Engineer | “SITC of 03 nos. 800 A, 11kV VCBs Panel including dismantling of damaged VCBs panels at 33/11 Sub Station Chibro”. |
|
351. | 09/EEM/2023-24 | 17-08-2023 | 08-09-2023 | Chilla | office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Procurement of different types of Electrical consumables for Residences of Project Colony. |
|
352. | 08/EEM/2023-24 | 17-08-2023 | 08-09-2023 | Chilla | office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Procurement of Miscellaneous stationary items at Chilla Circle Office |
|
353. | CH(Maint.)- 16/2023-24 | 16-08-2023 | 08-09-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Hiring of Pool vehicle with driver for various sites of Chibro, Khodri & Ichari Dam |
|
354. | 14/EE/PCM/Dhalipur/ 2023-24 | 14-08-2023 | 08-09-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Cutting of trees of different species located on both sides of Power Channel from Court Bridge to Skew Bridge Dhalipur. |
|
355. | 09/EE(G)/Chilla/2023-24 | 17-08-2023 | 07-09-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Removal of Sledge with the help of dredger machine from intake of Chilla Power House |
|
356. | 11/SPH/2023-24 | 11-08-2023 | 07-09-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories, replacement of 07 nos. shutter vane servomotor seal kit along with sealing and shifting of draft tube gates and sealing of intake gates of Unit 1 of Sharda Power House, Lohiahead as per technical specifications. |
|
357. | 17/EE/PCM-DKP/TN/2023-24 | 16-08-2023 | 06-09-2023 | Dakpathar | Office of the Executive Engineer, PCM-Dakpathar, UJVNLtd., Dakpathar (Dehradun), | Executive Engineer | Providing fencing around segregation plant of Dakpathar Gram Panchayat at Dakpathar Dehradun. |
|
358. | 10/EE-II(E&M-LWR)/LP/2023-24 | 20-08-2023 | 05-09-2023 | Dakpathar | Office of the Executive Engineer (E&M-II), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer | Annual Operation & Maintenance Contract for Electrical Installations & DG sets |
|
359. | 01/EE(E&M)/ICHARI/TN/2023-24 | 05-08-2023 | 05-09-2023 | Dehradun | Office of the Executive Engineer (E&M), Ichari Dam, Ichari UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Annual contract for operation & maintenance of LT panels, DG set and lighting systems of Ichari Dam in District Dehradun & Tender No |
|
360. | 02/UJVNL/EE(C-SBR)/2023-24 | 27-07-2023 | 05-09-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | - Drifting Work for Geological & Geotechnical Investigation for Sirkari Bhyol Rupsiabagar HEP on Goriganga River, Munsiyari, Pithoragarh. |
|
361. | 11/EE(M)/RPSK/2023-24 | 23-07-2023 | 05-09-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Hiring of one no. 32 seater non AC Bus for a period of 12 months |
|
362. | 05/EE(Test)/DKP/2023-24 | 12-08-2023 | 04-09-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Hiring of diesel vehicle (6+ Seater) with driver |
|
363. | 04/EE(Test)/DKP/2023-24 | 12-08-2023 | 04-09-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | SITC of Three phase Static voltage regulator for 220V Chargers and Single phase Static voltage regulator for 50V and 48V Chargers at Chibro Power House. |
|
364. | 09/UJVNL/EE(M&G)/KPS/2023-24 | 11-08-2023 | 04-09-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Hiring of one no. non AC Jeep (Bolero plus /TUV 300) (7-seater, Model 2021 or later) along with driver for one year. |
|
365. | 08/UJVNL/EE(M&G)/KPS/2023-24 | 11-08-2023 | 04-09-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Modification, Rectification and Overhauling work of JESSOP Make 80/20 EOT Crane at Kulhal Power station. |
|
366. | 07/UJVNL/EE(M&G)/KPS/2023-24 | 11-08-2023 | 04-09-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Monitoring & Testing Of Environmental Conditions at Kulhal Power Station for FY 2023-24. |
|
367. | 07/EE(Civil)/MB-I/TN/2023-24 | 10-08-2023 | 04-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Fixing of iron frames on Water Tanks and backyards of various types of residences at Kuteti Devi Colony,Uttarkashi |
|
368. | 02/EE(Civil-II)/Guptkashi/2023-24 | 10-08-2023 | 04-09-2023 | Rudraprayag | Office of the Executive Engineer (Civil-II) SHP, UJVN Limited, Guptkashi, DistrictRudraprayag | Executive Engineer | Supply and fixing of C.I. Sluice valve in D-Tank and other miscellaneous work in weir site of Madhyamaheshwar SHP (3x5) MW in District-Rudraprayag . |
|
369. | 05/EE(Civil)/MB-I/TN/2023-24 | 21-07-2023 | 04-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual Supply of Toner Cartridges for printers at the Office of DGM(CM-BV) at Maneri, Uttarkashi. |
|
370. | 04/EE(Civil)/MB-I/TN/2023-24 | 21-07-2023 | 04-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – IstManeri, Uttarkashi | Executive Engineer | Annual Supply of Stationary items at the Office of DGM(CM-BV) at Maneri, Uttarkashi |
|
371. | 08/Manager(A&S)/2023-24 | 14-08-2023 | 02-09-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Providing Manpower services for a period of one year on outsource basis for UJVNLtd. Head Office at Dehradun |
|
372. | 03/UJVNL/EE(C-SBR)/2023-24 | 07-08-2023 | 01-09-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | - Hiring of one number diesel driven small vehicle for 12 months alongwith driver for Executive Engineer (Civil), SBR Project, UJVN Ltd., Munsiyari in distt. Pithoragarh. |
|
373. | 03/UJVNL/EE(C-SBR)/2023-24 | 07-08-2023 | 01-09-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | - Hiring of one number diesel driven small vehicle for 12 months alongwith driver for Executive Engineer (Civil), SBR Project, UJVN Ltd., Munsiyari in distt. Pithoragarh. |
|
374. | 08/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 08-08-2023 | 01-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Construction of New Guard Post near the A.E. Club at Shaktipuram Colony Chinyalisaur . |
|
375. | 07/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 08-08-2023 | 01-09-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Covering/safety by structural steel fencing of water storage tank in AP & BP type block/quaters at Shaktipuram Colony, MB-II, Chinyalisaur, Uttarkashi. |
|
376. | CH (Maint.) - 15/2023-24 | 10-08-2023 | 31-08-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Procurement of various Rubber consumables of Chibro Power Station |
|
377. | 08/EE-II (E&M)/LP/2023-24 | 09-08-2023 | 31-08-2023 | Dakpathar | Office of the Executive Engineer-II (E&M),Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer-II (E&M) | Supply & Construction of 11 KV DT feeder at Lakhwar Project Dam Site . |
|
378. | 16/EE (GEN)/MB-II/2023-24 | 07-08-2023 | 29-08-2023 | Uttarkashi | Dharasu Power House, MB-II Chinyalisaur, Uttarkashi | Executive Engineer | PROCUREMENT OF SILICA GEL & BREATHER FOR TRANSFORMERS AT MB-II, DHARASU POWER HOUSE, CHINYALISAUR, UTTARKASHI. |
|
379. | 14/EE (GEN)/MB-II/2023-24 | 07-08-2023 | 29-08-2023 | Uttarkashi | Dharasu Power House MB-II Chinyalisaur. | Executive Engineer | CLEANING OF OIL SOAK PIT AND FLUSHING CONDUITS OF 13 NO GENERATOR TRANSFORMERS AT DHARASU POWER HOUSE, MB-II, CHINYALISAUR, UTTARKASHI. |
|
380. | 16 / अधि0अभि0 (उत्पादन ) / म०भा०-11/2023-24 | 07-08-2023 | 29-08-2023 | चिन्यालीसौड़ | चिन्यालीसौड़ | अधि0 अभि० (उ0) धरासू विद्युत गृह | धरासू विद्युत गृह पर सिलिका जेल एवं बीदर की आपूर्ति हेतु |
|
381. | 14 / अधि0अभि0 ( उत्पादन)/ म०भा०-11/2023-24 | 07-08-2023 | 29-08-2023 | चिन्यालीसौड़ | चिन्यालीसौड़ | अधि0 अभि० (उ0) धरासू विद्युत गृह | धरासू विद्युत गृह में 13 नम्बर जनरेटर ट्रांसफार्मर के ऑयल सोक पिट एवं फ्लैसिंग कन्हयूट की सफाई का कार्य |
|
382. | 06/EE(CM)/DDN/2023-24 | 07-08-2023 | 28-08-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | M&R work of multi-storey corporate office building of UJVN Limited at UJJWAL campus, G.M.S. road, Maharani Bagh, Dehradun. |
|
383. | 02/DGM(IT)/EE (E&M-I)/2023-24 | 07-08-2023 | 28-08-2023 | Dehradun | Office of the Executive Engineer, E&M-I (IT), UJJWAL, UJVN Limited, Dehradun | Executive Engineer | Supply & Installation of IP based telephone instruments for PABX system (NEC-SV 9100)” at new building, UJJWAL, UJVN Limited, Dehradun. |
|
384. | 08/EE(E&M-I)/LP/2023-24 | 22-07-2023 | 28-08-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer | Supply of electrical items |
|
385. | 02/EE(E&M)/ICHARI/TN/2023-24 | 05-08-2023 | 26-08-2023 | Dehradun | Office of the Executive Engineer (E&M), Ichari Dam, Ichari UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Annual cleaning of trash rack including disposal of trash at Ichari Dam in District Dehradun. |
|
386. | 08/SPH/2023-24 | 03-08-2023 | 26-08-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Annual Maintenance (Generator & Electrical auxiliaries) of Unit # 1, 2 & 3 of Sharda Power House Lohiahead, Khatima |
|
387. | 01/EE(Civil-II)/Guptkashi/2023-24 | 25-07-2023 | 26-08-2023 | Rudraprayag | Office of the Executive Engineer (Civil-II) SHP, UJVN Limited, Guptkashi, DistrictRudraprayag | Executive Engineer | Hiring of one number Light diesel Pool vehicle Mahindra & Mahindra Bolero (Non - AC) or equivalent with driver for one year on rent basis under O/o Executive Engineer (Civil-II) SHP, Guptkashi in District- Rudraprayag |
|
388. | 05/EE(G)/CPH/2023-24 | 04-08-2023 | 25-08-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | SITC of 33 kV Outdoor Circuit Breaker including associated auxiliaries with dismantling of exist breaker at Chibro Sub Station |
Corrigendum 1
|
389. | 13/EE/PCM/Dhalipur/ 2023-24 | 04-08-2023 | 25-08-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R works of Power House Colony at Kulhal (Dehradun) |
|
390. | 12/EE/PCM/Dhalipur/ 2023-24 | 04-08-2023 | 25-08-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of old Office Building at Dhalipur, Dehradun |
|
391. | CH(Maint.)- 14/2023-24 | 03-08-2023 | 25-08-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Hiring of 1 no. School Bus at Chibro |
|
392. | CH(Maint.)- 13/2023-24 | 03-08-2023 | 25-08-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Replacement of defected TGB Pads, Fabrication & Supply of Blue Matching device |
|
393. | 08/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 01-08-2023 | 24-08-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Annual M & R Work of Type - III & IV residences at Hydel Colony Kalagarh |
|
394. | 07/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 01-08-2023 | 24-08-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Annual M & R Work of Type - I & Type -A residences at Hydel Colony Kalagarh |
|
395. | 03/EE(Civil)/MB-I/TN/2023-24 | 15-07-2023 | 24-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – IstManeri, Uttarkashi | Executive Engineer | Operation & Maintenance of 15KLD STP at Tiloth Power House, Uttarkashi. |
|
396. | 13/EE(M)/RPSK/2023-24 | 09-08-2023 | 23-08-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Annual Maintenance of Unit-03 |
|
397. | 06/Manager(A&S)/2023-24 | 02-08-2023 | 23-08-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Work of Renovation and conversion of Director Block into Guest House, at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun. |
|
398. | 06/EE(Civil)/MB-I/TN/2023-24 | 01-08-2023 | 23-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – Ist Maneri, Uttarkashi | Executive Engineer | Housekeeping and operation of field Hostel and officer’s Transit camp at Maneri Dam Colony, Maneri, Uttarkashi |
|
399. | 10/EE(M&G)/MPH/2023-24 | 19-07-2023 | 23-08-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar | Executive Engineer | Providing & application of insulation epoxy coating work in front of UCB and 11 kV & LT room panels |
|
400. | 4/EE(G)/CPH/2023-24 | 03-07-2023 | 23-08-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Supply, installation, testing and commissioning of 220 KV XLPE Armoured Power Cable with all accessories including dismantling of the existing 220 KV Oil Filled Cable at 4X60 MW Chibro Power House. |
|
401. | 16/EE/PCM-DKP/TN/2023- 24 | 01-08-2023 | 22-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Slip Clearance and its removal from Dapathar Chibro road via Khodri & Kalawar |
|
402. | 15/EE/PCM-DKP/TN/2023-24 | 01-08-2023 | 22-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Repair & Maintenance of D, F, FH and LCTType Residences at Dakpathar Colony, Dakpathar, Dehradun |
|
403. | 14/EE/PCM-DKP/TN/ 2023-24 | 01-08-2023 | 22-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil Maintenance & Repair of C-Type Residences of Tons Colony at Dakpathar, Dehradun |
|
404. | 13/EE/PCM-DKP/TN/2023-24 | 01-08-2023 | 22-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil Maintenance & Repair of B-Type Residences of Old & New Yamuna Colony at Dakpathar, Dehradun |
|
405. | 07/EE/M&G/DLR/2023-24 | 29-07-2023 | 21-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Polysulphide modified epoxy resin based protective coating on the metal and concrete surfaces |
|
406. | 06/EE/M&G/DLR/2023-24 | 29-07-2023 | 21-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rewinding & Overhauling of compressor burnt motor 25 HP/18.5 KW of Dhalipur Power Station. |
|
407. | 05/EE/M&G/DLR/2023-24 | 29-07-2023 | 21-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Repairing & overhauling of 2000 GPM oil lubricated pump bowl assembly and drainage pump of Dhalipur power station |
|
408. | CH (MAINT.) - 12/2023-24 | 29-07-2023 | 21-08-2023 | छिबरो | छिबरो | अधिसी अभियन्ता | अधिशासी अभियन्ता (अनु०). हेतु, चालक सहित वाहन उपलब्ध करवाने हेतु |
|
409. | 04/EE/M&G/DLR/2023-24 | 29-07-2023 | 21-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | SITC of M.S Grill Rolling Shutter &G.I. Rolling Shutter at Dhalipur Power Station. |
|
410. | 09/EE(Maint.)/Khodri/2023-24 | 31-07-2023 | 20-08-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Hiring of 2 Nos. school bus for wards of UJVNL employees located at Dakpather |
|
411. | 07/EE(Gen)/Khodri/2023-24 | 18-07-2023 | 19-08-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Testing of Various Transformers installed at Khodri Power Station. |
|
412. | 01/EE(P&C)/2023-24 | 13-07-2023 | 19-08-2023 | Dehradun | Office of the Executive Engineer (P&C) Ganga Bhawan, Dehradun | Executive Engineer (P&C) | Procurement of HP Make Cartridges for various offices of UJVN Ltd. Located at Dehradun. |
|
413. | 04/Manager (A&S)/2023-24 | 28-07-2023 | 18-08-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager | Annual maintenance, cleaning and upkeep of buildings at “UJJWAL” campus at Dehradun |
|
414. | 05/Manager(A&S)/2023-24 | 28-07-2023 | 18-08-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager | Annual Operation, maintenance, cleaning and upkeep of UJVN Ltd transit accommodation at Mussoorie, Dist.-Dehradun |
|
415. | 02/EE/M&G/DLR/2023-24 | 28-07-2023 | 18-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Procurement of furniture for Dhalipur Power House |
|
416. | 01/EE/M&G/DLR/2023-24 | 28-07-2023 | 18-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Hiring of One No. Non-AC Diesel Vehicle alongwith driver for Executive Engineer (M&G), Dhalipur Power House |
|
417. | 13/EE(M)/VP/2023-24 | 29-07-2023 | 18-08-2023 | Dehradun | Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer | Providing and fixing of shed over Draft tube, TRC outfall and Surge Shaft gates (Panel Equipments) of Vyasi HEP at Hathiyari |
|
418. | 12/EE(M)/VP/2023-24 | 29-07-2023 | 18-08-2023 | Dehradun | Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer | Annual Maintenance contract for EOT Crane Capacity 225/35/10 Ton, Vyasi HEP at Hathiyari |
|
419. | 08/EE(Maint.)/Khodri/2023-24 | 26-07-2023 | 17-08-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement of Fasteners and Consumable items of Khodri Power station |
|
420. | 04/EE(IC&CM)/2023-24 | 26-07-2023 | 17-08-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Valuation of scrap material lying at Galogi Power House, Yamuna Colony stores and Harrawala store Dehradun of UJVN Ltd. |
|
421. | 06/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 26-07-2023 | 17-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Roof Treatment work of CP Type Qtr’s at Shaktipuram colony Chinyalisaur, Uttarkashi. |
|
422. | 05/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 26-07-2023 | 17-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Renovation and Modification of Toilet’s in Officer Field Hostel at Shaktipuram Colony, Chinyalisaur (Uttarkashi). |
|
423. | 11/EE/PCM/Dhalipur/ 2023-24 | 26-07-2023 | 17-08-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | General Cleaning upkeeping park and plantation work of Dhakrani Power House Colony at Dhakrani Dehradun |
|
424. | 10/EE/PCM/Dhalipur/ 2023-24 | 26-07-2023 | 17-08-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | General Cleaning upkeeping park work of Dhalipur Power House Colony at Dhalipur Dehradun |
|
425. | 01/UJVNL/EE(C-SBR)/2023-24 | 27-07-2023 | 17-08-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | Executive Engineer | Running & Maintenance of Gauge & Discharge Site and Silt Laboratory near Barrage/ Dam site of Sela Urthing HEP (114 MW) at Tehsil Dharchula in Pithoragarh District |
|
426. | 24/EE (M)/MB-II/2023-24 | 18-07-2023 | 17-08-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Hiring of Two no. (8+1) seater, Two No. (6+1) seater and One No. Utility/Camper (Mahindra/Tata/equivalent) non- A.C. Diesel vehicles along with drivers |
|
427. | 21/EE(M)/MB-II/23-24 | 10-07-2023 | 17-08-2023 | Uttarkashi | Office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Annual/Capital Maintenance of Machine No 1,2,3,4 of Dharasu Power House for the Year 2023-24 |
|
428. | 03/EE(IC&CM)/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Supply of cables for Pathri Power House of UJVN Ltd |
|
429. | 06/2023-24/EE(C-M)Vyasi Project | 26-07-2023 | 16-08-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Annual Operation, repair and maintenance of water supply distribution system including pumping plant at Hathiyari Power House of Vyasi HEP and cleaning of Public toilets/site office |
|
430. | 03/EE(G)/Klg/2023-24 | 25-07-2023 | 16-08-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (PauriGarhwal) | Executive Engineer | Refilling of fire extinguishers including supply of accessories. |
|
431. | 12/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil Maintenance & Repair works of Dakpathar Barrage, Dakpathar, Dehradun |
|
432. | 11/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil maintenance & repair works of AE-Type & EE-Type residences at Dakpathar Colony, Dakpathar Dehradun |
|
433. | 10/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Repair of Training wall and protection works of Ichari Dam |
|
434. | 09/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Upkeep and Gardening Works Related to Ichari Dam |
|
435. | 08/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil Repair & Maintenance of B-Type Residences of Tons Colony at Dakpathar (Dehradun). |
|
436. | 07/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Civil Maintenance & Repair of C-Type Residences of New Hydel Colony & Old Yamuna Colony at Dakpathar, Dehradun. |
|
437. | 06/EE/PCM-DKP/TN/2023-24 | 25-07-2023 | 16-08-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Providing Manpower services on outsource basis for the office of DGM (Civil-Maintenance) Dakpathar and Executive Engineer, PCM-Dakpathar & Executive Engineer, PCM-Dhalipur. |
|
438. | 12/EE(Pathri)/2023-24 | 24-07-2023 | 16-08-2023 | Bahadrabad | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Supply & Installation of Split Air Conditioners at Pathri Power House |
|
439. | 13/EE (GEN)/MB-II/2023-24 | 22-07-2023 | 14-08-2023 | Uttarkashi | office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Cleaning and repairing of stator core punching of 76 MW Capacity Hydro Generators of Dharasu Power House, MB-II, Chinyalisaur, Uttarkashi |
|
440. | 12/EE (GEN)/MB-II/2023-24 | 22-07-2023 | 14-08-2023 | Uttarkashi | office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Thermal Insulation (Legging) Work for Cooling Water Pipe Line of Generators bearings at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
441. | 11/EE (GEN)/MB-II/2023-24 | 22-07-2023 | 14-08-2023 | Uttarkashi | office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Cleaning & Applying Epoxy Red gel/ Becktol Insulation Varnish on Generator Stator winding & rotor for two nos machines at MB-II Dharasu Power House |
|
442. | 10/EEM&G)DKN/2023-24 | 22-07-2023 | 14-08-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Annual Maintenance Contract for Grass Cutting & Gardening activities. |
|
443. | 10/EE (GEN)/MB-II/2023-24 | 21-07-2023 | 14-08-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of Safety items at MB-II, Dharasu Power House . |
|
444. | 07/EE(C&M)/MB-II/Joshiyara/2023-24 | 20-07-2023 | 14-08-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Renovation of old store rooms and other associated works at Joshiyara Barrage, MB-II, Uttarkashi. |
|
445. | 06/EE(C&M)/MB-II/Joshiyara/2023-24 | 20-07-2023 | 14-08-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual Civil Repair & Maintenance of Joshiyara Barrage Uttarkashi. |
|
446. | 03/EE/M&G/DLR/2023-24 | 29-07-2023 | 12-08-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Repair and Dry Out for removing water content in winding of 20 MVA Generator Transformer of Unit C of Dhalipur Power Station |
|
447. | 03/Manager(A&S)/2023-24 | 22-07-2023 | 12-08-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager | Miscellaneous civil maintenance work at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|
448. | 01/अ०अ० (वि०या०)/मनेरीबांध / 2023-24 | 21-07-2023 | 12-08-2023 | Uttarkashi | Uttarkashi | अधिशासी अभियन्ता | अधि0अभि0 (वि० / या०), मनेरी बाघ, मनेरी, उत्तरकाशी के प्रयोगार्थ एक वर्श की अवधि हेतु एक डीजल चालित वाहन (वातानुकूलित रहित) चालक सहित किराये पर लेने हेतु। |
|
449. | 04/2023-24/EE/PCM(GV)/Mayapur | 21-07-2023 | 11-08-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Annual M&R Work of Type-I Residences & Non Residencial Buildings at Chilla Colony for the Year 2023- 24 |
|
450. | 26/EE(M)/MBII/23-24 | 21-07-2023 | 11-08-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing and Rewinding of 500 kVA, 11/0.415 kV transformer and associated works at Shaktipuram Colony, Chinyalisaur. |
|
451. | 25/EE (M)/MB-II/2023-24 | 21-07-2023 | 11-08-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair and Re- babbiting of TGB pads of 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi. |
|
452. | 01/UJVNL/ DGM(CD-II)/ Lakhwar /2023-24 | 04-05-2023 | 11-08-2023 | Dehradun | Office of the Dy. GM (CD-II), CD&H, UJVN Limited, Pashulok, Rishikesh, Dehradun | Dy. GM (CD-II) | Engagement of Project Management Consultant for Lakhwar MPP (300 MW) on River Yamuna in District Dehradun, Uttarakhand. |
|
453. | 09/EE(C&M)/MB-II/Joshiyara/2023-24 | 25-07-2023 | 09-08-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Annual Sweeping, Cleaning and maintenance of office building at Joshiyara, Uttarkashi. |
|
454. | 08/EE(C&M)/MB-II/Joshiyara/2023-24 | 25-07-2023 | 09-08-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Up-keeping and Maintenance work of Parks and other associated works at Joshiyara, MB-II, Uttarkashi. |
|
455. | 06/EE-II (E&M)/LP/2023-24 | 20-07-2023 | 09-08-2023 | Dakpathar | Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar, UJVN Ltd. | Executive Engineer-II | Overhauling & Repair of 33/11kV, 5 mva Transformer and Lighting Arrestor of 33/11kV Substation, Hathiyari |
|
456. | e-09/EE(M&G)/DKN/2023-24 | 08-07-2023 | 09-08-2023 | Dehradun | Office of the Executive Engineer (M&G), Dhakrani Power House, Dhakrani, Dehradun | Executive Engineer (M&G) | Trash Rack Cleaning & Other O&M activities |
|
457. | 11/EE(M&G)/MPH/2023-24 | 19-07-2023 | 08-08-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan - Hardwar | Executive Engineer | Supply of stationary items |
|
458. | 02/EE(Civil)/MB-I/TN/2023-24 | 15-07-2023 | 08-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil) ManeriBhali Stage – IstManeri, Uttarkashi | Executive Engineer | Construction of Balcony in A-Type residences at Kuteti Devi colony , Uttarkashi |
|
459. | 02/EE(Test)/GV/2023-24 | 06-06-2023 | 08-08-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer (Test) | Hiring of diesel vehicle with driver for 1 year |
|
460. | 06/EE(Gen)/Khodri/2023-24 | 18-07-2023 | 07-08-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Supply and Installation of the thermal insulation on generator cooling pipe lines at Khodri Power Station |
|
461. | 05/EE(Gen)/Khodri/2023-24 | 18-07-2023 | 07-08-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Supply and Installation of Heavy Duty Exhaust Fansat Khodri Power Station. |
|
462. | 06/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 14-07-2023 | 07-08-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Annual General Cleaning Work of Hydel Colony Kalagarh |
|
463. | 05/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 14-07-2023 | 07-08-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Annual M & R Work of Ramganga Power House Kalagarh. |
|
464. | 01/EE(Civil)/MB-I/TN/2023-24 | 14-07-2023 | 07-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri, Uttarkashi | Executive Engineer (Civil) | Construction of Community Meeting centre and Renovation of Devi Mata Mandir near Panchayat chowk at Gram Panchayat Maneri, Uttarkashi |
|
465. | 09/EE/PCM/Dhalipur/ 2023-24 | 15-07-2023 | 05-08-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Hiring of one number Mahindra Bolero or equivalent vehicle including driver for the office of DGM (CM) Dhalipur for one year. |
|
466. | PDD-09/2023-24 | 14-07-2023 | 05-08-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Distt-Dehradun) | Executive Engineer | Supply & Fixing of 33 kV and 11 kV heat shrink jointing kit and other items . |
|
467. | 04/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 15-07-2023 | 04-08-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Hiring of one number Bolero or equivalent Non AC Diesel Vehicle (Model 2021 and onwards) along with driver for site supervision under E.E.( Civil) Division of MB-II, Chinyalisaur for the period of 12 months. |
|
468. | 05/EE(CM)/DDN/2023-24 | 14-07-2023 | 04-08-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Providing Manpower services for a period of one year on outsource basis for the office of the Executive Engineer (CM), UJVN Ltd., Yamuna Bhawan, Dehradun. |
|
469. | 23/EE(M)/MBII/23-24 | 14-07-2023 | 04-08-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House. |
|
470. | 22/EE (M)/MB-II/2023-24 | 14-07-2023 | 04-08-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repairing of MIV, bypass valve and seal valve operating system and their actuators at Dharasu Power House, MB-II, Uttarkashi |
|
471. | 02/EE(G)/Klg/2023-24 | 09-06-2023 | 04-08-2023 | Pauri-Garhwal | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Repairing & Cleaning of Generator, Main exciter, PMG, and 11KV Bus Duct of Unit No. # 2 |
|
472. | CH(Maint.)-11/2023-24 | 12-07-2023 | 03-08-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Refurbishment & Installation & Commissioning of 01 Set of Turbine Guide Bearing Pads of 60 MW Francis Turbine of Chibro |
|
473. | 02/Manager(A&S)/2023-24 | 07-07-2023 | 03-08-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Providing Manpower services for a period of one year on outsource basis for UJVNLtd. Head Office at Dehradun |
|
474. | 01/UJVNL/ EE(I&P-II) /2023-24 | 18-07-2023 | 02-08-2023 | Dehradun | Office of the EE(I&P-II), Ganga Bhawan, Yamuna Colony, Dehradun | EE(I&P-II) | Preparation of Feasibility Report of Hydro Electric Projects Proposed to be constructed in Yamuna River Basin, Uttarakhand. |
|
475. | 10/EE(M)/RPSK/2023-24 | 02-07-2023 | 02-08-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Supply of stationery items for various offices of Hydel Generation Circle |
|
476. | PDD-08/2023-24 | 12-07-2023 | 31-07-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Hiring of one no. diesel driven vehicle (Mahindra Bolero Camper/Tata Xenon Crew with cabin or equivalent model 2019 or later) alongwith driver for one year. |
|
477. | PDD-07/2023-24 | 12-07-2023 | 31-07-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Hiring of one no. diesel driven vehicle (Mahindra Bolero Plus/TUV-300 or equivalent model 2020 or later) along with driver for one year . |
|
478. | 03/EE(E&M-SHP)/KG-I/2023-24 | 05-07-2023 | 31-07-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer | Supply, Installation, Testing and Commissioning of 250 KVA, (320-480/415±1% V) Copper Wound Constant Voltage Transformer (Servo) for KaligangaI SHP (2x2 MW+15% COL) located in Tehsil Ukhimath, DistrictRudraprayag, Uttarakhand |
|
479. | 03/EE(Civil)/Lohiahead/Khatima/2023-24 | 24-06-2023 | 30-07-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | “Hiring of Non A.C. Diesel Vehicle (Bolero or Equivalent Model 2022 or above) with Driver for Executive Engineer (Civil), Lohiahead (Khatima), for one year |
|
480. | 01/EE(E&M)/AB/2023-24 | 08-07-2023 | 28-07-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer (E&M) | Cleaning of Trash Rack at Asan Barrage, Dhalipur for a period of one year |
|
481. | 02/EE(IC&CM)/2023-24 | 05-07-2023 | 27-07-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Supply of Lighting Arrestor for various Power Houses/Sites of UJVN Ltd |
|
482. | 05/EE(E&M)/LP/2023-24 | 01-07-2023 | 27-07-2023 | Dehradun | Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun | Executive Engineer | Works of SITC of Various Capacity Salient Type DG Set with Accessories at Dakpathar Dehradun. |
|
483. | 01/EE (G)/TPH/2023-24 | 28-06-2023 | 27-07-2023 | Uttarkashi | Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi | Executive Engineer | Calibration of various instruments at Tiloth Power House and Maneri Dam. |
|
484. | 04/EE(Test)/DKN/2023-24 | 12-07-2023 | 26-07-2023 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer | Provisioning of reverse power protection, trip circuit supervision and LBB protection. |
|
485. | 03/2023-24/EE/PCM(GV)/Mayapur | 05-07-2023 | 26-07-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | External Painting Work of Type-II Residences of Chilla Colony. |
|
486. | 02/2023-24/EE/PCM(GV)/Mayapur | 05-07-2023 | 26-07-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Painting Work of Residential and Non-Residential Buildings of Mayapur Colony at Haridwar. |
|
487. | 01/2023-24/EE/PCM(GV)/Mayapur | 05-07-2023 | 26-07-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | External Painting Work of Type-I Residences of Chilla Colony. |
|
488. | 02/EE(G)/2023-24 | 29-06-2023 | 26-07-2023 | Executive Engineer | Office of the Executive Engineer (Generation) Tiloth Power House, Uttarkashi | Executive Engineer | Procurement of Stationery items for Tiloth Power House, Uttarkashi. |
|
489. | 01/EE(G)/Klg/2023-24 | 09-06-2023 | 25-07-2023 | Pauri-Garhwal | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Overhauling of 20 MVA, 132/33 kV Distribution Transformer |
|
490. | 08/EE(M&G)DKN/2023-24 | 02-07-2023 | 24-07-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Hiring of One No. Non-AC Diesel Vehicle (Mahindra Bolero or equivalent) alongwith driver for DGM HGC Dhakrani on annual contract basis |
|
491. | 04/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 01-07-2023 | 24-07-2023 | Pauri Garhwal | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwa | Executive Engineer | Annual Horticulture Maintenance, Development of Parks and misc. works at Ramganga Power House, Kalagarh |
|
492. | 03/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 01-07-2023 | 24-07-2023 | Pauri Garhwal | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwa | Executive Engineer | Annual M & R Work of Type - II Residences at Hydel Colony Kalagarh. |
|
493. | 01/EE(Civil-SHP)/Munsyari/2023-24 | 28-06-2023 | 24-07-2023 | Munsyari | Office of the Executive Engineer (Civil-SHP), Munsyari | Executive Engineer | Construction of Toilet and other miscellaneous work at Suringad-II Power House. |
|
494. | 05/EE(M)/2023-24 | 17-06-2023 | 22-07-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Refilling of nitrogen cylinder |
|
495. | 05/EE(E&M)(SHP)/Rishikesh/2023-24 | 19-06-2023 | 21-07-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh | Executive Engineer | Supply of electrical items including electrical wiring at Guest House in Srinagar Pauri Garhwal |
|
496. | 04/EE(M)/2023-24 | 17-06-2023 | 21-07-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Operation of surge shaft gate and miscellaneous works at “C” |
|
497. | 03/EE(M)/2023-24 | 17-06-2023 | 21-07-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Removal and disposal of wet silt form various places of power house |
|
498. | 07/SPH/2023-24 | 26-06-2023 | 20-07-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply, Installation, Testing & Commissioning of Main Control Panel, Bus Junction Box, DOL starters & Cables with cable tray for dewatering system at Sharda Power House Lohiahead. |
|
499. | 04/EE (Civil-I)/Srikot/2023-24 | 14-06-2023 | 19-07-2023 | Garhwal | Office of the Executive Engineer (Civil-I) SHP, UJVN Limited, Srikot-Srinagar, District- Pauri Garhwal, | Executive Engineer | Work related to various projects under the office of DGM(SHP)/Civil, UJVN Limited, Srikot Srinagar, Pauri Garhwal for one year. |
|
500. | 07/EE(M)/2023-24 | 04-07-2023 | 18-07-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer | Repairing and overhauling of 11 kV panel installed at DPH Heena and Tiloth. |
|
501. | 05/EE(E&M-I)/LP/2023-24 | 28-06-2023 | 18-07-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer | Repairing of 11 KV line between Haripur & Lakhwar substation |
|
502. | 05/2023-24/EE(C-M)Vyasi Project, Dakpathar | 27-06-2023 | 18-07-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | “Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Dy. General Manager (Civil-Maintenance), Vyasi HEP Dakpathar, Dehradun for period of one year |
|
503. | 02/EE(Civil-I)/Kaliganga-II/2023-24 | 17-05-2023 | 18-07-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Construction of Store Room and allied works at Power House site of Kaliganga-II SHP (2X2.25 MW) in District – Rudraprayag |
|
504. | PDD-06/2023-24 | 27-06-2023 | 17-07-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Annual Contract for Operation of 11 /0.4 KV Substation No-03, Dakpathar |
|
505. | PDD-05/2023-24 | 27-06-2023 | 17-07-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Annual Contract for Operation of 11 /0.4 KV Substation No-01, Dakpathar. |
|
506. | T-07/EEM/2023-24 | 26-06-2023 | 17-07-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Miscellaneous stationary items at Chilla Circle Office |
|
507. | T-06/EEM/2023-24 | 26-06-2023 | 17-07-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer | Supply, Installation, Testing & Commissioning of 3.15 MVA, 33/11KV Transformer for Chilla Project Colony |
|
508. | 06/EE(Civil)/Lohiahead/Khatima/2023-24 | 24-06-2023 | 17-07-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | Annual M & R works of Sharda Power House Lohiahead for the year 2023-24 |
|
509. | 05/EE(Civil)/Lohiahead/Khatima/2023-24 | 24-06-2023 | 17-07-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | M&R work of Non residential Buildings of Lohiahead Colony and other miscellaneous civil works at Sharda Power House Complex for the year 2023-24 |
|
510. | 04/EE(Civil)/Lohiahead/Khatima/2023-24 | 24-06-2023 | 17-07-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | M&R work of Residential Buildings & Special Repair of DP-Type Residences of Lohiahead Colony for the year 2023-24 |
|
511. | 06/EE(M)/2023-24 | 19-06-2023 | 17-07-2023 | Uttarkashi | Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi | Executive Engineer | Hiring the services of divers for maintenance works. |
|
512. | 05/EE/PCM-DKP/TN/2023-24 | 01-07-2023 | 16-07-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Construction of EWS Control Room at Dakpathar Barrage, Dakpathar, Dehradun. |
|
513. | PDD-04/2023-24 | 22-06-2023 | 15-07-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Supply & Fixing of metal cladding structure(Tree guard) with chemical coating |
|
514. | PDD-03/2023-24 | 22-06-2023 | 15-07-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Strengthening, Maintenance and repair of 33KV Dhakrani-Chibro feeder # 1 |
|
515. | 08/EE/PCM/Dhalipur/ 2023-24 | 13-06-2023 | 14-07-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Hiring of one number Mahindra Bolero or equivalent vehicle including driver for the office of DGM (CM) Dhalipur for one year. |
|
516. | CH(Maint.)-10/2023-24 | 21-06-2023 | 13-07-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Polysulphide modified epoxy resin based protective coating of DT gates. |
|
517. | CH(Maint.)- 09/2023-24 | 21-06-2023 | 13-07-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Annual Maintenance contract for the works of Transport & Central Store |
|
518. | 04/EE(Test)/GV/2023-24 | 28-06-2023 | 12-07-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer | Hiring of diesel vehicle with driver for 1 year |
|
519. | 05/EEM/2023-24 | 21-06-2023 | 12-07-2023 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Providing services of divers to carry out the various underwater works at chilla power house |
|
520. | 06/SPH/2023-24 | 19-06-2023 | 12-07-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Cleaning of Under Ground Cooling water Filtration tank, Painting on Cooling water and Shaft seal water lines, supply of SS frame with mesh along with Cleaning of grass, bushes, rubbish etc. at Cooling water Pump House, Shaft seal tank, emulsifier pump house premises at Sharda Power House Lohiahead. |
|
521. | 05/SPH/2023-24 | 19-06-2023 | 12-07-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Annual testing of GSU transformers and LT relays installed at Sharda Power House Lohiahead. |
|
522. | 04/SPH/2023-24 | 19-06-2023 | 12-07-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Supply, installation, testing and commissioning of 110Volt 100Ah VLRA battery bank and 02nos 110 Volt 25 Amp battery chargers with integrated DC distribution board with bus coupler at Sharda Power House, Lohiahead. |
|
523. | 03 EE(Test)/GV/2023-24 | 19-06-2023 | 12-07-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer | Annual maintenance contract of CCTV system of Chilla Power House, Pauri Garhwal |
|
524. | 09/EE(M)/RPSK/2023-24 | 21-06-2023 | 11-07-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of one no. diesel driven non AC light motor vehicle for emergency duties for a period of twelve months. |
|
525. | 08/EE(M)/RPSK/2023-24 | 21-06-2023 | 11-07-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of one no. light motor vehicle AC (Mahindra Scorpio or equivalent) along with driver for twelve months for the office of General Manager (R&S) |
|
526. | 08/EE(G)/2023-24 | 20-06-2023 | 11-07-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Rewinding/Repairing of Motors of Chilla Power House |
|
527. | 06/2023-24/EE(C)/Pashulok Barrage | 12-06-2023 | 11-07-2023 | Rishikesh | Office of the Executive Engineer (Civil), Pashulok Barrage, Rishikesh | Executive Engineer (Civil) | :Providing Manpower Services for a Period of One Year on Outsource Basis for the Offices of the Executive Engineer (Civil) Pashulok Barrage, Rishikesh. |
|
528. | 05/EE(Generation)/Vyasi/2023-24 | 17-06-2023 | 10-07-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Development & Maintenance of Garden and Operation of Canteen at Vyasi Power House, Hathiyari |
|
529. | 01/DGM(IT)/EE (E&M-I)/2023-24 | 17-06-2023 | 10-07-2023 | Dehradun | Office of the Executive Engineer, E&M-I (IT), UJJWAL, UJVN Limited, Dehradun | Executive Engineer | Rate Contract for Supply and Installation of SSD & UPS Batteries for various offices of UJVN Ltd. located at Dehradun. |
|
530. | 03/2023-24/EE(C-M)Vyasi Project | 19-06-2023 | 10-07-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Fabrication & Erection of Walkways, Foot Bridges & Ladders etc. for the Inspection of Piers, Divide Walls & Spillway Glacis at Juddo Dam of Vyasi HEP , Distt. Dehradun |
|
531. | NIT- 02/EE(Test)/MB-II/23-24 | 15-06-2023 | 10-07-2023 | Uttarkashi | The office of Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Misc. Cartridges/Toners for various Printer/ MFP/Photocopier’s at GM office, DGM office and Dharasu Power House, MB-II, Uttarkashi -249196 |
|
532. | 04/EE/PCM/Dhalipur/ 2023-24 | 06-06-2023 | 10-07-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Hiring of one non AC vehicle (Bolero or equivalent model) without driver for one year for the office of the Project Civil Maintenance, Dhalipur, Dehradun |
|
533. | 03/SPH/2023-24 | 23-05-2023 | 10-07-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Hiring of one number diesel driven vehicle model 2018 or later along with services of driver for a period of one year for departmental use for office of Executive Engineer (M&G), Sharda Power House,Lohiahead, Khatima |
|
534. | 07/EEM&G)DKN/2023-24 | 23-06-2023 | 07-07-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | “Retubing of Governor Oil sump cooler |
|
535. | 07/EE(M)/RPSK/2023-24 | 16-06-2023 | 07-07-2023 | Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Annual Maintenance Contract for repairing and overhauling of drainage dewatering pumps system and various motors. |
|
536. | 02/2023-24/EE(C-M)Vyasi Project, | 16-06-2023 | 07-07-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Inner Fencing work around Power House building & Pothead yard of Vyasi HEP, Dehradun |
|
537. | No.05/UJVNL/EE(M&G)/KPS/2023-24 | 15-06-2023 | 07-07-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Provision & Modification of Intake gate emergency fall limit switch and necessary mechanism for gate No. 1, 2 & 3 at Kulhal Power House |
|
538. | 09/EE(E&M)/MB-II/Barrage/2023-24 | 15-06-2023 | 07-07-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi), | Executive Engineer | Annual Routine Maintenance of Electrical work of colony and HT / LT Line at Joshiyara Colony |
|
539. | 08/EE(E&M)/MB-II/Barrage/2023-24 | 15-06-2023 | 07-07-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage, | Executive Engineer | Hiring of 02 Non-AC diesel vehicles at Joshiyara Barrage, Uttarkashi for the period of one year |
|
540. | 01/EE(E&M - ISO)/2023-24/ISMS | 14-06-2023 | 07-07-2023 | Dehradun | Office of the Executive Engineer (E&M-ISO), Ganga Bhawan, Yamuna Colony, Dehradun | Executive Engineer (E&M-ISO) | CONSULTANCY SERVICES FOR IMPLEMENTATION OF ISO 27001:2022 (ISMS) AT SITES HAVING IT/OT UNDER PHASE-IV (YAMUNA VALLEY) OF UJVN LTD. |
|
541. | 09/EE (GEN)/MB-II/2023-24 | 07-06-2023 | 07-07-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of Dial Type Temperature Gauge (DTT’s) for Bearings of 76 MW Hydro Generator at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
542. | 03/EE(E&M-I)/LP/2023-24 | 16-06-2023 | 06-07-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar, | Executive Engineer | Electrical wiring of office & residential buildings. |
|
543. | 04/EE(Generation)/Vyasi/2023-24 | 08-06-2023 | 06-07-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Annual Running & Maintenance of 10 KLD Sewage Treatment Plant (STP), MBR based technology at Vyasi Power House, Hathiyari (Dehradun) |
|
544. | 03/EE(Generation)/Vyasi/2023-24 | 08-06-2023 | 06-07-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Painting, Marking & other Miscellaneous works of Over Head OFC Line from Vyasi Power House, Hathiyari to Juddo Dam site |
|
545. | 05/EE(E&M)/Vyasi Dam/2023-24 | 15-06-2023 | 05-07-2023 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar | Executive Engineer | Providing Services for 30 Mbps Internet Leased Line (ILL) connectivity with static IP for a period of two-year at Vyasi Dam Site at Juddo, Dehradun |
|
546. | 01/EE(M&U-TP)/2023-24 | 13-06-2023 | 05-07-2023 | Dhalipur | Office of the Executive Engineer (M&U-TP), Dhalipur | Executive Engineer | Hiring of 01 no M&M Scorpio AC and 02 no M&M Bolero non AC or equivalent vehicles with drivers for two years. |
|
547. | 11/EE(Pathri)/2023-24 | 13-06-2023 | 05-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | 1.Servicing of End Suction Type Horizontal Centrifugal Pumps of Cooling Water System & Procurement of its allied spares at Pathri Power House. |
|
548. | 04/2023-24/EE(C-M)Vyasi Project, Dakpathar, | 20-06-2023 | 04-07-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Hiring of one number light diesel vehicle (Mahindra Make Bolero/TUV 300 or Equivalent) along with driver for Executive Engineer (CivilMaintenance), Vyasi HEP Dakpathar, Dehradun for period of one year |
|
549. | 04/EE(E&M)(SHP)/Rishikesh/2023-24 | 19-06-2023 | 04-07-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh, | Executive Engineer | Supply, Installation, and Commissioning including Repair & Maintenance of existing Sluice Valve at RPN SHP (2x750 KW), Dunao in District Pauri Garhwal . |
|
550. | 07/EE(G)/2023-24 | 13-06-2023 | 04-07-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | (1)Annual Cleaning of Intake Trash Rack of Chilla Power House |
|
551. | 03-EE-Test-DKP-2022-23 | 13-06-2023 | 04-07-2023 | Dakpathar | Office of the Executive Engineer (Test) Vidyut Bhawan, Dakpathar | Executive Engineer | Supply, Installation, Testing and Commissioning of Lead Acid Plante Battery Banks of 220 V DC/300 AH Capacity, after dismantling of old battery banks Set no.-1 at Chibro Power House. |
|
552. | 03/EE (Civil-I)/Srikot/2023-24 | 09-06-2023 | 04-07-2023 | Garhwal | Office of the Executive Engineer (Civil-I), UJVN Limited, Srikot-Srinagar, Garhwal | Executive Engineer (Civil-I) | Special Civil repair & maintenance work at Tunnel outlet portal of Kaliganga-II SHP (2x2.25) MW in District Rudraprayag |
|
553. | 9/EE(M&G)/MPH/2023-24 | 13-06-2023 | 03-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Supply, testing & commissioning work of 10 H.P submersible pump along with suitable control panel & HDPE flexible pipe |
|
554. | 8/EE(M&G)/MPH/2023-24 | 13-06-2023 | 03-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Providing & application of protective coating work over the surface of Bye pass gate & associated structure. |
|
555. | 7/EE(M&G)/MPH/2023-24 | 13-06-2023 | 03-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Servicing/Overhauling/ Alignment, Maintenance & Testing of 66 kV Isolators |
|
556. | 6/EE(M&G)/MPH/2023-24 | 13-06-2023 | 03-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Servicing & repairing of 27.5 TR, ductable AC, Hitachi Make including SITC of 03 Nos 2.0 TR, Split Type AC. |
|
557. | 07/EE(Pathri)/2023-24 | 21-05-2023 | 01-07-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Providing services for 20 Mbps Internet Leased Line with Static IP at Pathri Power House for a period of two year. |
|
558. | 02/EE(Pathri)/2023-24 | 04-05-2023 | 01-07-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer, (M&G) | Supply of PV Modules & String Inverters at 500KWp Solar Power Plant, Pathri and Installation, testing & commissioning work of 04 Nos. String Invertors in Solar Power Plant, Pathri |
|
559. | 01/UJVNL/ EE(Civil-II)/ TP /2023-24 | 01-05-2023 | 01-07-2023 | Dehradun | Office of the Executive Engineer (Civil-II), Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Executive Engineer (Civil-II) | Consultancy Services for Detailed Civil Design and Engineering including Project Monitoring & Control of Tiuni-Plasu Hydro Electric Project (2x36 =72MW) on River Tons in District Dehradun, Uttarakhand |
Corrigendum 1
|
560. | 06/EE(E&M)/Vyasi Dam/2023-24 | 16-06-2023 | 30-06-2023 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar | Executive Engineer | Hiring of 250 KVA DG Set at Vyasi Dam Site Juddo, Dehradun |
|
561. | 03/EE(Test)/DKN/2023-24 | 10-06-2023 | 30-06-2023 | Dhakrani | Dhakrani | Executive Engineer (Test) | Hiring of One No. Non - AC Diesel Vehicle (Mahindra Bolero/TUV300 or equivalent vehicle model-2021 or later) for Executive Engineer (Test), Dhakrani for a period of Twelve Calendar Months. |
|
562. | 07/EE/PCM/Dhalipur/ 2023-24 | 09-06-2023 | 30-06-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Hiring of one number Mahindra Bolero or equivalent vehicle including driver for the office of EE PCM Dhalipur for one year. |
|
563. | 06/EE(M)/RPSK/2023-24 | 09-06-2023 | 30-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Repairing and overhauling of jack-brake system of Unit-2 & Unit-3 |
|
564. | 05/2023-24/EE(C)/Pashulok Barrage | 09-06-2023 | 30-06-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Annual Sweeping & Cleaning Work of Barrage and New Hydel Colony at Pashulok-Rishikesh. |
|
565. | 04/2023-24/EE(C)/Pashulok Barrage | 09-06-2023 | 30-06-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Annual M&R Works of New Hydel Colony at Pashulok, Rishikesh |
|
566. | 03/2023-24/EE(C)/Pashulok Barrage | 09-06-2023 | 30-06-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Annual M&R Works of Type-B, Type-C & Type-D Residences at Barrage Colony, Pashulok, Rishikesh. |
|
567. | 06/EE(Civil-III)/LMP/2023-24 | 09-06-2023 | 30-06-2023 | Dehradun | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-III) | Construction of Office Building and Meeting Hall for Administrator / Rehabilitation Officers at Steel store Dakpathar Distt-Dehradun Of Lakhwar Project (300 MW) |
|
568. | 08/EE (GEN)/MB-II/2023-24 | 07-06-2023 | 30-06-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur) | Executive Engineer | Procurement of flexible braided copper connector for 76 mw Generator Maintenance at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
569. | 02/ EE(Civil)/SHP/Maneri /2023-24 | 15-04-2023 | 30-06-2023 | Uttarkashi | Office of the Executive Engineer (Civil)/SHP/Maneri Uttarkashi | Executive Engineer | Construction, Design, Supply, Installation and Testing of Silt Flushing System all complete for proper functioning of (2x1125 kw) Pilangad SHP, Bhatwari, Distt- Uttarkashi. |
|
570. | 20/EE(M)/MB-II/23-24 | 08-06-2023 | 29-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair and Rewinding of 90kw Flygt Make Cooling Water Pump including repairing of stator and other works at Dharasu Power House. |
|
571. | 20/EE(M)/MBII/23-24 | 08-06-2023 | 29-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repair and Rewinding of 90kw Flygt Make Cooling Water Pump including repairing of stator and other works at Dharasu Power House. |
|
572. | 19/EE (M)/MB-II/2023-24 | 08-06-2023 | 29-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repair and Rewinding of Drainage Pumps of Dharasu Power House |
|
573. | 07/EE(Maint.)/Khodri/2023-24 | 07-06-2023 | 28-06-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | SITC of 10 ton Electrically operated Hoisting arrangement at Surge tank of Khodri Power Station. |
|
574. | 11/EE(M)/VP/23-24 | 08-06-2023 | 28-06-2023 | Hathiyari | The office of Executive Engineer (Maint.), Vyasi Project Hathiyari | Executive Engineer (Maint.) | Supply of Consumable Items for Maintenance at Vyasi Power House, Hathiyari |
|
575. | 06/EE/PCM/Dhalipur/ 2023-24 | 07-06-2023 | 28-06-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R works of Kulhal Power House at Kulhal, Dehradun |
|
576. | 05/EE/PCM/Dhalipur/ 2023-24 | 07-06-2023 | 28-06-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | M&R works of Dhalipur Power House Colony at Dhalipur, Dehradun |
|
577. | 10/EE(Pathri)/2023-24 | 06-06-2023 | 28-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual Contract for General Operation of Pump House System & other miscellaneous electrical section works in Pathri Power House |
|
578. | 09/EE(Pathri)/2023-24 | 06-06-2023 | 28-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual Contract for Sweeping, Cleaning & Up-keeping of Pathri Power House |
|
579. | 18/EE(M)/MB-II/23-24 | 05-06-2023 | 27-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Servicing of KG Khosla make compressors at Dharasu Power House, MB-II |
|
580. | 17/EE(M)/MB-II/23-24 | 05-06-2023 | 27-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Consumable and Other Spares at Dharasu power House M.B -II, Uttarkashi. |
|
581. | CH(Maint.)- 08/2023-24 | 27-05-2023 | 27-06-2023 | Chibro | Chibro | Executive Engineer | Providing Vehicles (Bolero & equivalent) for Deputy General Manager, J.V.U.M for Dakpathar |
|
582. | T-04/EEM/2022-23 | 12-06-2023 | 26-06-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Genration) Chilla. |
|
583. | T-03/EEM/2022-23 | 12-06-2023 | 26-06-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Dismantling, Assembly of Turbine Sealing System and associated work of Units of Chilla Power House |
|
584. | 02/2023-24/EE (Civil)/UJVNL/Pashulok Barrage, Rishikesh | 05-06-2023 | 26-06-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Reconstruction of Kunaw Village Approach Road with Interlocking Tiles along Silt Ejector Channel of Virbhadra Barrage Rishikesh. |
|
585. | 01/EE(Civil)/Tiuni Plasu/2023-24 | 02-06-2023 | 26-06-2023 | Dakpathar | Office of the Executive Engineer (Civil), Tiuni-Plasu, UJVNLtd., Dakpathar (Dehradun), | Executive Engineer | Sweeping, Cleaning & Upkeep work of Arakot-Tiuni and Tiuni-Plasu offce at Dakpathar |
|
586. | 04/EE(Civil-III)/LMP/2023-24 | 25-05-2023 | 24-06-2023 | Dehradun | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-III) | Construction of 04 Nos. A-Type residential Building for Lakhwar MPP at Dakpathar, Dehradun |
|
587. | 08/EE(M)/VP/2023-24 | 25-05-2023 | 24-06-2023 | Dehradun | Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one number Light diesel vehicle (M&M Bolero or Equivalent) along with driver for emergency use of vyasi HEP for One Year |
|
588. | NIT-10/EE(M)/VP/23-24 | 03-06-2023 | 23-06-2023 | Vyasi | The office of Executive Engineer (Maint.), Vyasi Project Hathiyari | Executive Engineer (Maint.) | Strenghtening of metal and concrete joints of up & down stream side of MIV inlet & outlet pipes of unit no. 01 & 02 at Vyasi Power House |
Corrigendum 1
|
589. | 16/EE(M)/MB-II/23-24 | 01-06-2023 | 22-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Dial Type Temperature (DTT) Detector at Dharasu Power House, Uttarkashi |
|
590. | 15/EE(M)/MB-II/23-24 | 01-06-2023 | 22-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement Of Coating Material For Turbine At Dharasu Power House |
|
591. | 06/EEM&G)DKN/2023-24 | 31-05-2023 | 22-06-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Wiring works of residential buildings & SITC of 11 KV TPMO |
|
592. | 05/EEM&G)DKN/2023-24 | 31-05-2023 | 22-06-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Annual General cleaning of Power House area, HGC offices, other offices, switchyard area & other associated areas |
|
593. | 04/EEM&G)DKN/2023-24 | 31-05-2023 | 22-06-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Overhauling, servicing, modification and testing of 11 kV panels |
|
594. | 02/EE (GC)/2023-24 | 26-05-2023 | 22-06-2023 | Dehradun | Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun | Executive Engineer | Hiring of one No. Covered light diesel vehicle (M&M Make Bolero or equivalent along with driver on rent basis for 12 months for Executive Engineer and Assistant Engineer as pool vehicle for Galogi SHP and office |
Corrigendum 1
|
595. | 01/EE(Test)/MB-II/23-24 | 12-05-2023 | 22-06-2023 | Uttarkashi | The office of Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Test) | Procurement of 3 Phase 11/0.275KV,700KVA Copper Wound Dry Type Cast Resin Transformer (Excitation Transformer) for Dharasu Power House, M.B.-II, Chinyalisaur, Uttarkashi, 249196 |
|
596. | 04/UJVNL/EE (M&G)/KPS/2023-24 | 25-05-2023 | 21-06-2023 | Kulhal | Kulhal | Executive Engineer (M&G) | Servicing & Overhauling of Voltas make 15 TR x 2 capacity air cooled package unit installed at Kulhal Power Station |
|
597. | 03/EE(G)/CPH/2023-24 | 30-05-2023 | 20-06-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer (Generation) | “SITC of 440V LT panel & cable for emergency supply at Chibro Power House. |
|
598. | 03/EE(Maint.)/Khodri/2023-24 | 20-05-2023 | 20-06-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Procurement of 4 nos. Shaft Sleeves for 30 MW Machine of Khodri Power Station |
|
599. | 04/EE(E&M)/Vyasi Dam/2023-24 | 19-05-2023 | 20-06-2023 | Dakpathar | The office of Executive Engineer (E&M), Vyasi Dam Juddo, Dakpathar | Executive Engineer (E&M) | Supply of portable suspended solids/silt Analyzer for Vyasi Dam Juddo, Dehradun |
|
600. | 5/EE(C&M)/MB-II/ Joshiyara/2023-24 | 18-05-2023 | 20-06-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi | Executive Engineer (C&M) | Annual sweeping, cleaning, repair & maintenance of sewer lines & drains in Joshiyara colony Uttarkashi. |
|
601. | 4/EE(C&M)/MB-II/ Joshiyara/2023-24 | 18-05-2023 | 20-06-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi | Executive Engineer (C&M) | Annual operation & maintenance of water supply distribution system at Joshiyara colony, Uttarkashi. |
|
602. | 01/EE(R&D)/2023-24 | 08-05-2023 | 20-06-2023 | Dehradun | Dehradun | EE(R&D) | RFP for Engagement of “Service Provider Agency” for work related to validation, registration and its first verification of eligible Hydro Projects of UJVN Limited commissioned before 01.01.2016 under suitable GHG (Green House Gas) Program along with issuance and trade / sale of carbon credits and receipt of complete revenue (i.e. money obtained against sale of all carbon credits mined for the consideration period) in to UJVN Limited’s Account on “Zero Investment/ Expense Model” revenue sharing basis through open tender. |
|
603. | 01/EE(IC&CM)/2023-24 | 27-05-2023 | 19-06-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Procurement of new Transformer Oil for various Power Stations of UJVN Ltd. |
|
604. | 06/EE(Maint.)/Khodri/2023-24 | 27-05-2023 | 19-06-2023 | Dehradun | Dehradun | Executive Engineer | Installation of 25 HP Pump along with motor for clean water supply at Khodri Power Station |
|
605. | 05/EE(Maint.)/Khodri/2023-24 | 26-05-2023 | 19-06-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | AMC of Automation system of various pumps of khodri power station |
|
606. | CH(Maint.)- 07/2023-24 | 27-05-2023 | 19-06-2023 | Chibro | Chibro | Executive Engineer | Supply of various wooden material for DT gates of Chibro Power House |
|
607. | 07/EE (GEN)/MB-II/2023-24 | 26-05-2023 | 19-06-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur | Executive Engineer | Procurement of Electrical Items for MB-II, Dharasu Power House. |
|
608. | 05/EE(M)/RPSK/2023-24 | 27-05-2023 | 17-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Annual maintenance contract for repairing & overhauling of LOPs and EOCs of unit no. 1, 2 & 3 |
|
609. | 01/EE(Civil)/AT/2023-24 | 26-05-2023 | 17-06-2023 | Dehradun | Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer (Civil) | Drilling & associated testing for Geo-technical Investigations at Arakot-Tiuni Hydro Electric Project in District Uttarkashi of Uttarakhand. |
|
610. | 04/EE(E&M)/MB-II/Barrage/2023-24 | 27-04-2023 | 17-06-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Annual Routine Maintenance of Electro Mechanical and Hydro Mechanical Equipment’s of barrage including sweeping and cleaning for the year 2023-24 |
|
611. | 01/2023-24/EE(C)/Pashulok Barrage | 26-05-2023 | 16-06-2023 | Rishikesh | UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Annual M&R Works of Type- A Residences at Barrage Colony, Pashulok, Rishikesh. |
|
612. | 03/EE(CM)/DDN/2023-24 | 26-05-2023 | 16-06-2023 | Executive Engineer | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | M&R work in Type-II (CT, E & F) Residences of UJVN Limited at yamuna colony, Dehradun. |
|
613. | 04/EE(CM)/DDN/2023-24 | 26-05-2023 | 16-06-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | M&R work of Type III Residences of UJVN Limited at Yamuna Colony. Dehradun |
|
614. | 02/EE(E&M-SHP)/Dharchula/2023-24 | 25-05-2023 | 16-06-2023 | Dharchula | Office of the Executive Engineer (E&M-SHP), Dharchula | Executive Engineer (E&M-SHP) | Hiring of one number diesel driven small vehicle M&M Bolero or equivalent for 12 months along with driver for the office of DGM (E&M-SHP), Pithoragarh |
|
615. | 07/EE(E&M)/MB-II/Barrage/2023-24 | 23-05-2023 | 16-06-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer (E&M) | Providing and Fixing Weatherproof Junction Box for Outdoor Installation at Joshiyara Barrage Uttarkashi |
|
616. | 06/EE(E&M)/MB-II/Barrage/2023-24 | 23-05-2023 | 16-06-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer (E&M) | Extension of 3 phase Power Supply for submersible pumps at Joshiyara Barrage, Uttarkashi |
|
617. | 4/EE(M&G)/MPH/2023-24 | 03-05-2023 | 15-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Overhauling & maintenance of TRCM at MPH |
|
618. | 02/EE(M)/RPSK/2023-24 | 07-04-2023 | 15-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of one no. light motor vehicle (Mahindra Scorpio or equivalent) along with driver for twelve months for the office of General Manager (R&S) |
|
619. | 01/EE(M)/RPSK/2023-24 | 07-04-2023 | 15-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of one no. 42 seater non AC Bus for a period of 12 months |
|
620. | 06 /EE(G)/2023-24 | 26-05-2023 | 14-06-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Flushing of Strainers, Flushing of Filtration Plant & Cleaning of 132Kv Switchyard of Chilla Power House. |
|
621. | 09/EE(M)/VP/2023-24 | 25-05-2023 | 14-06-2023 | Dehradun | Office of the Executive Engineer (Maint.), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one no.(35 Seater) School Bus Model 2020 or later for academic session 2023-24 for one year on contract basis for transportation of school going children of Vyasi Project effected, Vyasi Project, Hathiyari |
|
622. | 08/EE(Pathri)/2023-24 | 24-05-2023 | 14-06-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Hiring of one no. Non AC diesel driven vehicle (along with driver’s services) for DGM, HGC, Pathri for a period of one year |
|
623. | 01/EE(E&M-SHP)/Dharchula/2023-24 | 10-05-2023 | 14-06-2023 | Dharchula | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Dharchula | Executive Engineer (E&M-SHP) | Annual Operation and Maintenance of Suringad-II SHP (2x2.5 MW+10% COL), located in Tehsil Munsyari, District- Pithoragarh. |
|
624. | 05 /EE(G)/2023-24 | 24-05-2023 | 13-06-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Annual Cleaning & Sweeping of Chilla Power House. |
|
625. | e-01/UJVNL/IT/EE(EM-II)/2023-24 | 27-05-2023 | 12-06-2023 | Dehradun | Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun | Executive Engineer (E&M-II) | Supply, installation, testing & commissioning of Video Conferencing System at Conference Room of New Corporate Office Building, UJVN Limited, Dehradun |
|
626. | 02/EE(Test)/DKN/2022-23 | 21-05-2023 | 12-06-2023 | Dhakrani | Office of Executive Engineer (Test), Dhakrani | Executive Engineer | Calibration of various testing instruments and panel meters |
|
627. | 02/SPH/2023-24 | 23-05-2023 | 12-06-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer | Hiring of one number diesel driven vehicle model 2018 or later along with services of driver for a period of one year for departmental use under Dy. General Manager, HGC, Lohiahead, Khatima |
|
628. | 04/EE(Maint.)/Khodri/2023-24 | 20-05-2023 | 12-06-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Procurement of Self lubricated bushes for Khodri Power Station |
|
629. | 02/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 19-05-2023 | 12-06-2023 | Pauri Garhwal | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | “Horticulture Maintenance, Development of Parks and Play Ground and Sanitization work at Hydel Colony Kalagarh.” |
|
630. | No.02/UJVNL/EE(M&G)/KPS/2023-24 | 16-05-2023 | 12-06-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal, | Executive Engineer | Servicing & overhauling of Trash Rack Cleaning Machine TRCM at Kulhal Power Station |
|
631. | 03/EE (Maint)/VP/2023-24 | 13-05-2023 | 12-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for Executive Engineer Generation, Vyasi HEP, Hathiyari, Dehradun for one year period |
|
632. | 04/EE(E&M)/PB/2023-24 | 20-05-2023 | 10-06-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer (E&M) | Hiring of diesel vehicle non-AC (Mahindra & Mahindra Bolero or equivalent) without driver for emergency conditions at Virbhadra Barrage, Pashulok Rishikesh . |
|
633. | 03/EE(E&M)/Vyasi Dam/2023-24 | 19-05-2023 | 10-06-2023 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar, UJVN Ltd. | Executive Engineer (E&M ) | SITC and repairing of valve of dewatering system in the dam gallery of Vyasi Dam at Juddo, Dehradun |
|
634. | 01/EE (GC)/2023-24 | 12-05-2023 | 10-06-2023 | Dehradun | Office of the Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony Dehradun | Executive Engineer (Galogi Complex) | “Expanded Metal wire mess Fencing work at Bhatta Head of Galogi SHP, Dehradun for safeguard of man material and stray Animal |
|
635. | 07/EE(M)/VP/2023-24 | 20-05-2023 | 09-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd. | Executive Engineer (Maint. ) | Providing the services of Divers to carry out the underwater works at Vyasi HEP |
|
636. | 06/EE(M)/VP/2023-24 | 20-05-2023 | 09-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd. | Executive Engineer (Maint. ) | Annual maintenance contract of hydromechanical gates of Vyasi Power House at Hathiyari |
|
637. | 05/EE(M)/VP/2023-24 | 20-05-2023 | 09-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd. | Executive Engineer (Maint. ) | Protection Railing work of Draft Tube Gate, TRC Outfall Gate and Surge Shaft Gate of Vyasi Power House, at Hathiyari |
|
638. | 06/EE(Pathri)/2023-24 | 18-05-2023 | 08-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Supply & Installation of Sliding SS mesh wire gate with one no. openable mesh door at the entrance & one no. Sliding SS mesh wire gate at the exit of machine hall of Pathri Power House. |
|
639. | NCB/01/EE/PCM-DKP/TN/2023-24 | 08-05-2023 | 08-06-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Special repair and reconstruction of railing, parapet wall and inspection way of Dakpathar Barrage |
|
640. | 03/EE(E&M)(SHP)/Rishikesh/2023-24 | 24-05-2023 | 07-06-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh | Executive Engineer (E&M) | Complete Servicing and Overhauling of Both Unit OPU at RPN SHP (2x750kW), Dunao in District Parui Garhwal. |
|
641. | 01/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 | 16-05-2023 | 07-06-2023 | Plasu | Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu | Executive Engineer | Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu |
|
642. | 02/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 | 16-05-2023 | 07-06-2023 | Plasu | Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu, | Executive Engineer | Hiring of 1 no. Diesel Vehicle Bolero/TUV 300 or Equivalent Model with Driver for Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu Dakpathar for one year |
|
643. | CH(Maint.)- 06/2023-24 | 16-05-2023 | 07-06-2023 | Chibro | Chibro | Executive Engineer | Cleaning & Flagging work of main cooling water stainer during monsoon period. |
|
644. | 03/EE(E&M)/PB/2023-24 | 16-05-2023 | 06-06-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer (E&M) | Annual Routine Electrical Maintenance of colonies and Virbhadra Barrage at Pashulok, Rishikesh |
|
645. | 02/EE(E&M)/PB/2023-24 | 16-05-2023 | 06-06-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer (E&M) | Manufacturing & Providing of Spares of Barrage gates at Virbhadra Barrage, Rishikesh |
|
646. | 04 /EE(G)/2023-24 | 15-05-2023 | 06-06-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Repairing of Inlet Air Blowers of Chilla Power House. |
|
647. | 03 /EE(G)/2023-24 | 15-05-2023 | 06-06-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Supply, Fabrication & erection of truss type tin shade on 500kVA DG set and other associated works at Chilla Power House. |
|
648. | No.03/UJVNL/EE(M&G)/KPS/2023-24 | 16-05-2023 | 06-06-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal, | Executive Engineer | Operation and Maintenance of cross regulating gates at downstream of Kulhal PH |
|
649. | PDD-02/2023-24 | 13-05-2023 | 06-06-2023 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | AMC of 33 kV & 11kV Lines & other miscellaneous works |
|
650. | 05/EE (Civil-III)/LMP/2023-24 | 16-05-2023 | 05-06-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) | Executive Engineer | Construction of barbed wire fencing and other associated works for the land of Lakhwar Multipurpose Project at Juddo, District-Dehradun. |
|
651. | 05/EE(Pathri)/2023-24 | 13-05-2023 | 03-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual Contract for operation & maintenance of 500 KWp Solar PV Plant Pathri. |
|
652. | 04/EE(M)/RPSK/2023-24 | 13-05-2023 | 03-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of diving services |
|
653. | NIT-14/EE(M)/MB-II/23-24 | 13-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Re-filling of Fire Extinguisher at Central store at Dharasu Power House |
|
654. | NIT-13/EE (M)/MB-II/2023-24 | 13-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Cleaning of Grass, bushes and rearrangement of materials in central store area at Dharasu Power house |
|
655. | 04/EE/PCM-DKP/TN/2023-24 | 12-05-2023 | 03-06-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Sweeping, cleaning & upkeep works of Vidyut Bhawan, Project Distribution Division Office & Project Civil Maintenance-Dakpathar Office at Dakpathar, Dehradun. |
|
656. | 06/EE(Gen)/MB-II/2023-24 | 11-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Generation) | Re-filling of different type and capacity of Fire extinguisher & Nitrogen cylinder at MB-II, Dharasu Power House. |
|
657. | 05/EE (GEN)/MB-II/2023-24 | 29-04-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Supply, installation, testing & commissioning of 1010 KVA, DG set along with synchronizing panel at MB-II Dharasu Power house. |
|
658. | 04/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Supply and Replacement of different types of valves of cooling lines of Khodri Power Station |
|
659. | 03/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Extension of CCTV system to surge tank area at Khodri Power Station. |
|
660. | 02/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Supply and Installation of Air filter Assembly for Exciter of 30 MW Generator. |
|
661. | 01/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Providing of Additional Power Supply to Hydrant System at Khodri Power Station. |
|
662. | 04/EE (Maint)/VP/2023-24 | 13-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of Dy.GM (O&M), Vyasi Project, Dakpathar for one year period |
|
663. | 03/EE/PCM-DKP/TN/2023-24 | 11-05-2023 | 01-06-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Hydel Colony, Old Yamuna Colony, New Yamuna Colony, main road from Dakpathar Tiraha to New Yamuna Colony and by pass road from Tikona Park to main gate of Play Ground near Barrage at Dakpathar, Dehradun |
|
664. | 02/EE/PCM-DKP/TN/2023-24 | 11-05-2023 | 01-06-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Tons Colony, Gole Market Colony, Colony Behind Post Office and main road from Dakpathar Bus Station to main gate of play ground near Barrage via Nehru Market and GMVN at Dakpathar, Dehradun. |
|
665. | 12/EE(M)/MB-II/23-24 | 11-05-2023 | 01-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Special Jack and Puller Assembly for Lower Bush Housing at Dharasu Power House, MB-II Uttarkashi. |
|
666. | 11/EE(M)/MB-II/23-24 | 11-05-2023 | 01-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of gun metal bush for Turbine at Dharasu Power House, Uttarkashi |
|
667. | 04/EE(Pathri)/2022-23 | 09-05-2023 | 31-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | AMC of CCTV Camera System installed at various places such as in & around side of Andritz Store, Pathri Power House & 500KWp Solar PV Plant, Pathri and Supply, Installation, Testing & Commissioning of 02 nos. CCTV Cameras system in Pathri Power House |
|
668. | 02-EE-Test-Dkp-2023-24 | 10-05-2023 | 31-05-2023 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer (Test) | Internet lease line (1:1) for Chibro PH, Khodri PH, Ichari Dam, Dakpathar Barrage and Vidyut Bhawan offices |
Corrigendum 1
|
669. | 01-EE-Test-Dkp-2023-24 | 10-05-2023 | 31-05-2023 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer (Test) | Hiring of Diesel vehicle with driver for a period of one year |
|
670. | 01/UJVNL/EE (M&G)/KPS/2023-24 | 08-05-2023 | 31-05-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Annual Maintenance Contracts (AMC) for Colony Maintenance work (Elec/Mech) at Kulhal Power Station |
|
671. | 01/Manager(A&S)/2023-24 | 08-05-2023 | 30-05-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Supply, Installation, Testing and Commissioning of 01 No. 750 KVA DG set along with AMF panel at New Office Building, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|
672. | 01/EE (E&M) /DKP BRG/2023-24 | 04-05-2023 | 29-05-2023 | Dakpathar | Dakpathar | Executive Engineer | Hiring of one number non-AC Diesel vehicle (Mahindra Bolero Plus or equivalent) along with driver for Dakpathar Barrage, Dakpathar, Dehradun (excluding the cost of fuel) on contract basis for one year. |
|
673. | 02/EE(G)/2023-24 | 08-05-2023 | 29-05-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Refilling of Fire Extinguishers at Chilla Power House. |
|
674. | 01/EE(G)/2023-24 | 08-05-2023 | 29-05-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Annual maintenance contract (AMC) for computers, printers at Chilla Power House. |
|
675. | 05/EE(M&G)/MPH/2023-24 | 08-05-2023 | 29-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Hiring of one Non AC 7(6+1) seater vehicle for EE(M&G) Office & driver for new purchased ambulance for one year |
|
676. | NIT-02/EE(M)/VP/23-24 | 09-05-2023 | 29-05-2023 | Hathiyari | The office of Executive Engineer (Maint.), Vyasi Project Hathiyari | Executive Engineer (Maint.) | Supply of various submersible pump with accessories for vyasi HEP, Hathiyari |
|
677. | CH(Maint.)– 05/2023-24 | 08-05-2023 | 29-05-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Supply of Self Lubricating Guide vane Bushes (Top, Middle) and lip seal of 60 MW Machines at Chibro Power Station. |
|
678. | 02/EE(Civil)/Lohiahead/Khatima/2023-24. | 08-05-2023 | 29-05-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | Repair and Protection work of right bank of TRC of Sharda Power House, Lohiahead, (Khatima) |
|
679. | 01/EE(Civil-SHP)/Dharchula/2023-24 | 04-05-2023 | 27-05-2023 | Dharchula | Office of the Executive Engineer (Civil-SHP), Dharchula | Executive Engineer (Civil-SHP) | Hiring of one number diesel driven small vehicle (M&M Bolero or equivalent, non AC) for 12 months along with driver for the office of EE (Civil-SHP), Dharchula |
|
680. | 02/EE(E&M)(SHP)/Rishikesh/2023-24 | 28-04-2023 | 27-05-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh, | Executive Engineer | Design, Reverse Engineering, Manufacturing, Supply, Transportation and Repair of Turbine Runner and associated Items of Urgam SHP (2x1500kW) in District Chamoli, Uttarakhand . |
|
681. | 02/EE(E&M-SHP)/Kaliganga-II/2023-24 | 29-04-2023 | 26-05-2023 | Guptkashi | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Guptkashi | Executive Engineer (E&M) SHP | Annual Operation and Maintenance of Kaliganga-II SHP (2x2.25 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag |
|
682. | 09/EE(Gen)/Klg/2022-23 | 22-11-2022 | 26-05-2023 | Kalagarh | Executive Engineer (Generation) | Electrical and Mechanical | Design, Engineering, Manufacturing, Supply, Installation, Testing & commissioning of Stator Core, Winding & Re-insulation of Rotor Poles with Class F insulation of Unit # 1 of Ramganga Power Station, Kalagarh. |
Corrigendum 1
|
683. | 01/2023-24/EE(C-M)Vyasi Project | 11-05-2023 | 25-05-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Construction of Storm drain at Bench at El. ± 562.50m above Pothead yard area of Hathiyari Power House of Vyasi HEP |
|
684. | 01/EE(Test)/DKN/2023-24 | 04-05-2023 | 25-05-2023 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer (Test) | Retrofitting of Alarm &Annunciation panels with auxiliary relays for all 03 units at Kulhal Powerhouse |
|
685. | 02/EE(C&M)/MB-II/Joshiyara/2023-24 | 03-05-2023 | 25-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Development of Park at right bank of Joshiyara Barrage , MB-II , Uttarkashi |
|
686. | 02/EE(E&M)/Vyasi Dam/2023-24 | 03-05-2023 | 25-05-2023 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar, UJVN Ltd | Executive Engineer (E&M ) | Fabrication of M.S Platform (Chemically coated) for inspection and maintenance of trunnion bracket assembly of orifice radial gates of Vyasi Dam at Juddo, Dehradun |
|
687. | 01/EE(E&M)/Vyasi Dam/2023-24 | 03-05-2023 | 24-05-2023 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd | Executive Engineer (E&M) | Shifting of TRCM trash from Dam site to the Dump yard site at Juddo, Dakpathar, District Dehradun |
|
688. | 07/EE(M)/MB-II/23-24 | 26-04-2023 | 24-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Maintenance for HydroMechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months |
|
689. | 01/EE(Test)/GV/2023-24 | 08-05-2023 | 23-05-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer (Test) | Hiring of diesel vehicle with driver for 1 year |
|
690. | 02/EE(Maint.)/Khodri/2023-24 | 02-05-2023 | 23-05-2023 | Dehradun | Dehradun | Executive Engineer | Cleaning & up-keeping of duplex strainer buckets system and other miscellaneous works during monsoon season at Khodri Power Station |
|
691. | 3/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Testing & Fault rectification work on 66kv switchyard equipment including procurement of 66kv spares at MPH |
|
692. | 2/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Providing, fixing & installation of switchyard electric fencing at MPH |
|
693. | 1/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Supply of Switchgear spares at MPH |
Corrigendum 1
|
694. | 02/EE(M)/2023-24 | 02-05-2023 | 23-05-2023 | Uttarkashi | Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi | Executive Engineer (M) | Procurement of un-armored cable for Tiloth Power House |
Corrigendum 1
|
695. | 03/EE (E&M-II)/LP/2023-24 | 08-05-2023 | 22-05-2023 | Dakpathar | Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar, UJVN Ltd. | Executive Engineer-II (EM-LWR) | Repairing and Overhauling of 33/11kV, 5MVA & 1.5MVA Transformers and 11kV VCB Panels at Lakhwar Substation |
|
696. | 01/EE(M)/2023-24 | 01-05-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi | Executive Engineer | Hiring of 1 no. non AC diesel vehicle and 1 no. utility diesel vehicle for power house. |
|
697. | 03/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Maintenance of Water Supply System for residential and non residential buildings of Shaktipruam colony, Chinyalisaur, Uttarkashi. |
|
698. | 01/EE(E&M)/MB-II/Barrage/2023-24 | 11-04-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer (E&M) | Annual cleaning of trash rack through Diving Team at Joshiyara Barrage, Uttarkashi for the period of one year |
|
699. | 03 /EE(C&M)/MB-II/ Joshiyara/2023-24 | 12-05-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi | Executive Engineer (C&M) | Surveying work of Barrage reservoir and project area of Joshiyara Barrage, MB-II, Uttarkashi |
|
700. | 03/EE(Pathri)/2023-24 | 06-05-2023 | 20-05-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Hiring of one no. 7 (6+1) seater Non AC diesel vehicle (along with driver’s services) for official use of Executive Engineer (M&G), Pathri Power House & one no. driver for running of departmental ambulance for a period of one year. |
|
701. | 02/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual sweeping and cleaning work of ShaktipuramColony,MB-II, Chinyalisaur. |
|
702. | 01/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Civil Maintenance of Dharashu Power House Complex at Dharashu, Uttarkashi. |
|
703. | 03/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | CLEANING IN 220 KV SWITCHYARD AND OTHER ASSOCIATED WORKS AT DHARASU POWER HOUSE. |
|
704. | 04/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Painting of Various Electrical Equipment, Panels and Staircase at MB-II, Dharasu Power House. |
|
705. | 02/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Painting of earthing strip, support structure (towers, gantry and beam), street poles & concrete slabs of cable gallery and other associated work at 220 kV switchyard, MB-II, Dharasu Power House. |
|
706. | 01/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | General Cleaning work at MB-II, Dharasu Power House. |
|
707. | 03/EE(Civil)/SHP/Maneri/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi | Executive Engineer (Civil) SHP | Annual repair & maintenance work of Pilangad (2x1125 KW) SHP in Bhatwari, Distt-Uttarkashi. |
|
708. | 05/EE(E&M)/MB-II/Barrage/2023-24 | 27-04-2023 | 19-05-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Procurement of Electrical items for Joshiyara barrage colony, Uttarkashi |
|
709. | 01/EE/PCM/Dhalipur/ 2023-24 | 27-04-2023 | 18-05-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Annual M&R works of Office Building at Dhalipur for the year of 2023-24 |
|
710. | 01/EE(Civil)/Lohiahead/Khatima/2023-24 | 26-04-2023 | 18-05-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer (Civil) | Providing & Fixing of Chain Link Fencing from C-16 to RT Bank of TRC Nigam Premises near Temple, at Sharda Power House, Lohiahead, Khatima |
|
711. | 01/EE(E&M)/LP/2023-24 | 17-04-2023 | 18-05-2023 | Dehradun | Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun | Executive Engineer (E&M-II) | Works of Revamping & Refurbishment of 33/11 kV Lakhwar Substation. Kaldriyan, Tehsil Nain Bagh Tehri Garhwal. |
Corrigendum 1
|
712. | 02/EEM/2023-24 | 03-05-2023 | 17-05-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer (M) | Supply and Application of Coating Material over the upper and lower ring wall surfaces of stay ring of Unit #2 of Power House |
|
713. | NIT-09/EE(M)/MBII/23-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repairing of Bowl Assembly of 150HP dewatering pump and other work at Dharasu Power House, M.B.-II, Uttarkashi |
|
714. | NIT-08/EE (M)/MB-II/2023-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repairing of Guide vane leaver assembly at Dharasu Power House |
|
715. | 10/EE(M)/MB-II/23-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Drainage Pump Spares at Dharasu Power House, MB-II, Uttarkashi |
|
716. | NIT-02/EE(Gen)/Vyasi/23-24 | 25-04-2023 | 17-05-2023 | Dakpathar | he office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Annual General Cleaning of 2x60 MW Vyasi Power House at Hathiyari, Dehradun |
|
717. | 01/EE(Pathri)/2023-24 | 25-04-2023 | 17-05-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | O&M works of Cooling Water System of Pathri Power House during monsoon period. |
|
718. | PDD-01/2023-24 | 26-04-2023 | 16-05-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Supply & Replacement of damaged electrical poles at Dakpathar colony |
|
719. | 02/EE(CM)/DDN/2023-24 | 25-04-2023 | 16-05-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Construction of overhead water tank along with water purifier and hand washing station at Govt. Primary School, Shastri Nagar, Dehradun. |
|
720. | 01/EE (E&M)/(SHP)/Rishikesh/2023-24 | 13-04-2023 | 16-05-2023 | Rishikesh | The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh | Executive Engineer | Annual Operation and Maintenance for RPN SHP (2x750kW) Dunao, in District- Pauri Garhwal, Uttarakhand |
|
721. | CH(Maint.)- 04/2023-24 | 22-04-2023 | 15-05-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Repair & Maintenance work of clean water Supply System at Chibro Power Station |
|
722. | 01/EE (E&M-SHP)/KG-II/2023-24 | 21-04-2023 | 13-05-2023 | GUPTKASHI | Office of Executive Engineer (E&M-SHP), UJVN Limited, GUPTKASHI | Executive Engineer (E&M-SHP) | “Hiring of One no. Light Diesel Commercial vehicle Non-AC (M&M Bolero or equivalent) on rent basis along with driver for D.G.M. (E&M-SHP) Srikot, Srinagar, Garhwal for one year |
|
723. | 01/EE (Civil-III)/LMP/2023-24 | 14-04-2023 | 12-05-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) | Executive Engineer | Supply, erection and design of 85.4 meter span Bailey Suspension Bridge, 24R load class, carriage road width 3.277 m (excluding of Civil works) at River Yamuna at Lakhwar Dam Site Distt. Dehradun |
|
724. | NCB/01/EE(E&M)/PB/2023-24 | 10-04-2023 | 12-05-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer (E&M) | Strengthening of Barrage gates with application of Zinc rich chemical compound at Virbhadra Barrage under DRIP-II. |
|
725. | 2e/EE(G)/CPH/2023-24 | 20-04-2023 | 11-05-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer (Generation) | Annual Contract for miscellaneous work of lighting system, operation and maintenance at Chibro Power House |
|
726. | 01/EE(Maint.)/Khodri/2023-24 | 18-04-2023 | 11-05-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Modification of opening arrangement of Main Inlet Valve (MIV) ofunit no 2,3,4 of Khodri Power House. |
|
727. | 01/EE(CM)/DDN/2023-24 | 19-04-2023 | 10-05-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Housekeeping Service for New Corporate Office Building, UJVN Ltd., Ujjwal, Maharani Bagh, G.M.S. Road, Dehradun |
|
728. | 01/SPH/2023-24 | 18-04-2023 | 09-05-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply, Installation, Testing & Commissioning of 220 VDC, 250AH and 220 VDC 440AH VRLA Battery Bank at Sharda Power House, Lohiahead, Khatima, (Uttarakhand) |
|
729. | CH (Maint.)- 03/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Operation and routine servicing of 50t outlet structure crane during monsoon period at Chibro Power Station |
|
730. | CH (Maint.)- 02/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Fixing of Pump at Stage II gallery and Miscellaneous Pipe Line work at Chibro Power Station |
|
731. | CH (Maint.)- 01/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Repairing of wiring and fixing of lights at miscellaneous site of Chibro Power Station |
|
732. | 01/EE(Civil)/SHP/Maneri/2023-24 | 13-04-2023 | 09-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi | Executive Engineer | Construction of Approch Path from near Pilangad Power House to Forebay tank and other associated work of Power House (2x1125 KW) at Bhatwari Distt- Uttarkashi |
Corrigendum 1
|
733. | 01/EE(G)/CPH/2023-24 | 16-04-2023 | 08-05-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer (Generation) | Annual contract for cleaning, & up keeping of switchyard and Chibro Power House complex . |
|
734. | 01/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 15-04-2023 | 08-05-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Treatment of Leakage in Penstock Gallery of Unit No. 02 & 03 at Ramganga House Kalagarh |
|
735. | 24/SPH/2022-23 | 31-03-2023 | 08-05-2023 | Khatima | Office of the Executive Engineer (M&G) | Executive Engineer (M&G) | Supply & installation of cable tray and repair & maintenance of clock tower at Sharda Power House Lohiahead |
Corrigendum 1
|
736. | 10/EE(E&M)/ ICHARI/TN/2022-23 | 31-03-2023 | 08-05-2023 | Dehradun | Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) | Executive Engineer (E&M) | Providing & fixing of Main gate board and other sign board for Ichari Dam |
|
737. | 12/Manager(A&S)/2022-23 | 21-03-2023 | 08-05-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Hiring of vehicles along with driver for corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|
738. | NIT- 03/EE(E&M)/MB-II/Barrage/2023-24 | 15-04-2023 | 06-05-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Epoxy Painting in sedimentation gallery of Joshiyara Barrage, Uttarkashi |
|
739. | 02/EE(E&M)/MB-II/Barrage/2023-24 | 15-05-2023 | 06-05-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Procurements of T&P items at Joshiyara Barrage, MB-II, Uttarkashi |
|
740. | 01/EE(C&M)/MB-II/Joshiyara/2023-24 | 13-04-2023 | 06-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Development of land and other associated civil works at the left bank of Joshiyara barrage reservoir,MB-II, near suspension bridge, Uttarkashi |
|
741. | 01/EE(Generation)/Vyasi/2023-24 | 06-04-2023 | 06-05-2023 | Dakpathar | Office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Supply Installation and Testing of Dielectric Epoxy Coating around Electric Panels at Vyasi HEP LT/HT Panels at Vyasi Power Station |
Corrigendum 1
|
742. | 03/EE(M)/RPSK/2023-24 | 13-04-2023 | 04-05-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Repair and modification of water cooling system of Unit-1, 2 and 3 |
|
743. | 03/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Lower bush housings for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi |
|
744. | 01/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of general spares for Turbines at Dharasu Power House, MB-II Uttarkashi |
|
745. | NIT- 06/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing of TGB Housings of 76 MW Turbines at Dharasu Power House, Uttarkashi |
|
746. | NIT- 05/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Re-filling of Fire Extinguisher at Central store at Dharasu Power House |
|
747. | NIT-04/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair and Overhauling of One No E.O.T Crane of Capacity 15 Ton at Dharasu Power House, MB-II Uttarkashi. |
|
748. | NIT-02/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Cleaning of Grass, bushes and rearrangement of materials in central store area at Dharasu Power house |
|
749. | 21/SPH/2022-23 | 14-03-2023 | 04-05-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | .Internet leased line service at Sharda Power House, Lohiahead for a period of one year. |
|
750. | 03/EEM&G)DKN/2023-24 | 11-04-2023 | 02-05-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Miscellaneous procurement for Power House, offices, training center and guest house |
|
751. | 02/EEM&G)DKN/2023-24 | 11-04-2023 | 02-05-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Procurement of Stationery |
|
752. | T-01/EEM/2023-24 | 06-04-2023 | 01-05-2023 | Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Providing & Replacement of 500mm dia FLV Pipe Line of Unit No. 2 at Chilla Power House |
|
753. | T-58/EEM/2023-24 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer | Procurement of Globe valves at Chilla Power House |
|
754. | T-57/EEM/2023-24 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Generation) Chilla. |
|
755. | T-56/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing and overhauling work of water filtration plant of Power House |
|
756. | T-55/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Thermal Insulation work in two units at Power House. |
|
757. | T-54/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Supply of Cleaning Products and Gasket Sealant for Units of Power House |
|
758. | T-53/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Supply & fabrication of rotating shaft sleeve at Power House. |
|
759. | 01/EE (Civil-I)/Srikot/2023-24 | 05-04-2023 | 29-04-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Providing & fixing Modular type kitchen and allied work at UJVNL Guest House buiding at Srikot Srinagar (Garhwal)” |
|
760. | 22/EE(Gen)/Khodri/2022-23 | 07-04-2023 | 29-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | V Dry Type 500 kVA Unit Auxiliary Transformer (UAT) and 11/0.415V Dry Type 800 kVA Station Auxiliary Transformer (SAT) |
|
761. | 52/EEM/2022-23 | 25-03-2023 | 29-04-2023 | Chilla | Office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer (M) | Design, Engineering, Supply, Installation Testing & Commissioning of dredging Pump & Dredging System structure for Intake of Chila Power Station. |
Corrigendum 1
|
762. | 01/EE(M)/VP/2023-24 | 07-04-2023 | 27-04-2023 | Hathiyari | Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyar | Executive Engineer (Maintenance) | Annual maintenance contract of Drainage and Dewatering System of Vyasi HEP at Hathiyari |
|
763. | 01/EEM&G)DKN/2023-24 | 06-04-2023 | 27-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Annual Maintenance Contract (AMC) for Electrical Maintenance works of Dhakrani colony |
|
764. | 09/EE(E&M-SHP)/KG-II/2022-23 | 30-03-2023 | 27-04-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Checking/Tightening of all nuts & bolts of towers, riveting/tack welding of bolts up to section A-A, replacement of damaged/punctured insulators of 33 kV transmission (IInd circuit) line from Kaliganga II SHP to Madhyamaheshwar SHP. |
|
765. | 10/EE(E&M-SHP)/KG-II/2022-23 | 30-03-2023 | 27-04-2023 | Guptkashi | Guptkashi | Executive Engineer | Hiring of One no. Light Diesel Commercial vehicle Non-AC (M&M Bolero or equivalent) on rent basis along with driver for D.G.M. (E&M-SHP) Srikot, Srinagar, Garhwal for one year |
Corrigendum 1
|
766. | 08/EE(E&M-SHP)/KG-II/2022-23 | 29-03-2023 | 27-04-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Design and supply of Dummy plates/ bulk head gates for MIV & Draft tube at Kaliganga-II SHP (2x2.25 MW +15%COL) near village Kaviltha, tehsil Ukhimath in district Rudraprayag, Uttarakhand. |
|
767. | 19/EE(Civil-I)/LMP/2022-23 | 13-03-2023 | 27-04-2023 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Construction of chain-link fencing, security huts and other associated works of Lakhwar Multipurpose Project |
|
768. | 18/EE(Civil-I)/LMP/2022-23 | 13-03-2023 | 27-04-2023 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Maintenance of project roads of Lakhwar Multipurpose Project |
|
769. | T-03/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 1.25 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Pashulok Barrage, Rishikesh, District-Dehradun, Uttarakhand |
|
770. | T-02/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 6.25 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Dhalipur Power House, Dhalipur, District- Dehradun, Uttarakhand |
|
771. | T-01/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 9.5 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Kulhal Power House, Kulhal, District-Dehradun, Uttarakhand |
Corrigendum 1
|
772. | 01/2023-24/EE(CD-II)/CDH&NP,UJVN Ltd Rishikesh | 01-04-2023 | 24-04-2023 | Dehradun | UJVN Limited, Executive Engineer (CD-II), CDH&NP, UJVN Ltd,Pashulok, Rishikesh, Dehradun | Executive Engineer (CD-II) | Supply/Procurement of MIDAS FEA-NX Software for UJVN Ltd Civil Design and Hydrology Office Rishikesh. |
|
773. | 25/SPH/2022-23 | 31-03-2023 | 24-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer (M&G) | ”Installation,Testing & Commissioning of 33KV feeder-4 at Sharda Power House,Lohiahead |
Corrigendum 1
|
774. | 12/EE(Civil)/Lohiahead/Khatima/2022-23 | 30-03-2023 | 24-04-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer (Civil) | Repair and improvement of Sewerage System of Sharda Power House Colony, Lohiahead |
|
775. | 17/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | General Cleaning of Ramganga Power Station, Kalagarh for 12 months |
|
776. | 16/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Annual Maintenance Contract for Routine Maintenance Activities |
|
777. | 15/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Fabrication & fixing of stator cooling pipeline of U#3 |
|
778. | 14/EE(IC&CM)/2022-23 | 15-03-2023 | 24-04-2023 | Dehradun | office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Procurement of new Transformer Oil for various Power Stations of UJVN Ltd |
|
779. | 28/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Replacement and modification of Generator Transformer water cooling pipe lines of Dhalipur Power Station |
|
780. | 27/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Supply installation testing and commissioning of electric winch machine 5 Ton Capacity at Dhalipur power station |
|
781. | 26/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Fabrication and fixing of covers for driving mechanism of Intake Gate Hoists of Unit A,B &C of Dhalipur power station. |
|
782. | 11/EE(Generation)/Vyasi/2022-23 | 31-03-2023 | 21-04-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Establishment of Canteen at Vyasi HEP |
|
783. | 15/EE (Maint)/VP/2022-23 | 01-04-2023 | 21-04-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | “Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maintenance), Vyasi Project, Hathiyari, Dehradun for one year period for Executive Engineer, Vyasi Dam, Juddo" |
|
784. | 23/SPH/2022-23 | 29-03-2023 | 21-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply , installation , testing and commissioning of packaged type air conditioner at Sharda Power House, Lohiahead” |
|
785. | 34/UJVNL/EE (M&G)/KPS/2022-23 | 30-03-2023 | 20-04-2023 | Kulhal | Office of Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | 3 Drawing generation by reverse engineering 3D Scanner Software of Turbine guide bearing and shaft seal assembly and its interfaces of Unit-A at Kulhal Power House |
|
786. | 18/EE(G)/Chilla/2022-23 | 30-03-2023 | 20-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Re-insulation of rotor pole coil of chilla power house |
|
787. | CH (MAINT.) - 36/2022-23 | 29-03-2023 | 20-04-2023 | Chibro | Chibro | Chibro | Hiring of Non AC vehicle with round O’ clock driver for maintenance duty of Chibro Power Station |
|
788. | 10/EE(Generation)/Vyasi/ 2022-23 | 28-03-2023 | 19-04-2023 | Dakpathar | Office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Electrical Fitting for equipments at Offices of Vyasi HEP |
|
789. | 27/EE(M)/RPSK/2022-23 | 29-03-2023 | 18-04-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Annual Maintenance of Unit-02 |
|
790. | 06/2022-23/EE Test(GV) | 27-03-2023 | 17-04-2023 | Haridwar | Office of the Executive Engineer, Test(Ganga Valley), Mayapur, Haridwar | Executive Engineer | Restoration of Temperature Scanner in U#2 at Chilla Power House |
|
791. | 17/EE(G)/Chilla/2022-23 | 25-03-2023 | 17-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Procurement of protective footwear i.e. safety shoes at Chilla Power House. |
|
792. | 16/EE(G)/Chilla/2022-23 | 25-03-2023 | 17-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Providing, installation and commissioning of 15 mbps leased line internet service at Chilla Power House and other associated offices. |
|
793. | 35/EEM&G)DKN/2022-23 | 27-03-2023 | 17-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Hiring of One No. Non-AC Diesel Vehicle alongwith driver for Executive Engineer (M&G), Dhakrani Power House on annual contract basis |
|
794. | 19/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Procurement of consumable and miscellaneous items of generator maintenance at Khodri Power Station. |
|
795. | 18/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Repairing of Unit Auxiliary (UAT) of machine no. 4 of Khodri Power Station |
|
796. | 21/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Revamping of switchyard by providing and laying of Gravels in 220 kV switchyard at Khodri Power Station-Phase-II |
|
797. | 25/EE/M&G/DLR/2022-23 | 01-04-2023 | 15-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Repair and Dry Out for removing water content in winding of 20 MVA Generator Transformer of Unit B of Dhalipur Power Station |
|
798. | 29/2022-23/EE(C)/Pashulok Barrage | 25-03-2023 | 15-04-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Cleaning & Maintenance of Hathi Kund 01,02,and 03 at Power Channel HEP |
|
799. | 37/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwa | Executive Engineer | Slope Protection Works Near Confluence of Chilla Power House Tail Race Channel & Mundal Nala at Chilla |
|
800. | 36/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Flood Protection Works at Right Bank of Ghasiram Nala for the Protection of Haridwar-Chilla Power House Road. |
|
801. | 35/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwa | Executive Engineer | Flood Protection Works at Left Bank of Mundal Nala in upstream of Mundal Bridge for the Protection of Transmission Tower |
|
802. | 19/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 22-03-2023 | 13-04-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Civil) | Construction of Class Rooms for Saraswati Vidya Mandir Inter collage at Shaktipuram Colony, MB-II, Chinyalisaur |
|
803. | 07/EE(E&M-I)/LP/2022-23 | 17-03-2023 | 13-04-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer (E&M-I) | Electrical wiring of office & residential buildings. |
Corrigendum 1
|
804. | NIT- 27/EE(Gen)/MB-II/22-23 | 10-03-2023 | 13-04-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Generation) | ELCID Testing of Stator Of 76 MW Hydro Generator At MB-II, Dharasu Power House. |
|
805. | 18/EE(M)/2022-23 | 21-03-2023 | 11-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Supply of various consumable items for Tiloth Power House, Uttarkashi. |
|
806. | 23/EE(CM)/DDN/2022-23 | 06-03-2023 | 11-04-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Construction of overhead water tank along with water purifier and hand washing station at Govt. Primary School, Shastri Nagar, Dehradun. |
|
807. | 34/EEM&G)DKN/2022-23 | 24-03-2023 | 10-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Hiring of One No. AC diesel vehicle (Mahindra Scorpio or equivalent) for General Manager (Yamuna Valley-II) on annual contract basis |
|
808. | 05/UJVNL/ EE(C-SBR)/2022-23 | 20-03-2023 | 10-04-2023 | Munsiyari | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd.Munsiyari | Executive Engineer (Civil) | Hiring of Manpower Services for a Period of One Year on Outsource Basis for the Office of the Dy. G.M. (Civil) and Executive Engineer (Civil), SBR project and hiring of labours for field visit of experts/committees/officials of other departments at Sirkari Bhyol Rupasiabagar HEP site at Munsiyari in Pithoragarh District |
|
809. | 11/EE(Test)/DKN/2022-23 | 18-03-2023 | 10-04-2023 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer (Test) | Repair of faulty relays and earth-fault locator at Dhakrani Power House |
|
810. | 13/EE(T)/MB-II/22-23 | 17-03-2023 | 10-04-2023 | Chinyalisaur | The office of Executive Engineer (Test), MB-II, Dharasu Power House, Chinyalisaur | Executive Engineer (Test) | Up Keeping and Maintenance Of GM (BV)/ DGM (HGC) Offices, Officers Club, JE Club,Type-3 club and 11kv/0.4kv Substation in Shaktipuram Colony, Chinyalisaur. |
|
811. | T-51/EEM/2022-23 | 17-03-2023 | 08-04-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repair and Rewinding of ceiling fans at Chilla Power House. |
|
812. | T-50/EEM/2022-23 | 17-03-2023 | 08-04-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Annual General Cleaning of different places, Officers Club, Guest House, Substations, Central Store and Tube well premises etc. at Chilla Power House, Chilla |
|
813. | 17/EE(M)/2022-23 | 17-03-2023 | 07-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Repairing and overhauling of 11 kV panel installed at DPH Heena and Tiloth. |
|
814. | 16/EE(M)/2022-23 | 17-03-2023 | 07-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Replacement of TPMO switch & fuse set at different locations of Tiloth Power House, Uttarkashi |
|
815. | e-23/EE/M&G/DLR/2022-23 | 04-03-2023 | 07-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Procurement of Lube oil cleaner for Turbine Governing system of Unit A,B & C of Dhalipur Power station |
|
816. | 07/EE(Civil-II)/LMP/2022-23 | 22-03-2023 | 06-04-2023 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun | Executive Engineer (Civil-II) | Annual Cleaning Upkeeping, Gardening and other miscellaneous work of field hostel (near inspection house) of Lakhwar Project at Dakpathar, Dehradun |
|
817. | 14/EE(M)/VP/2022-23 | 17-03-2023 | 06-04-2023 | Dakpathar | Office of the Executive Engineer (Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Maintenance) | Annual maintenance contract of Cooling Water System of Vyasi HEP at Hathiyari,Dehradun . |
|
818. | 33/UJVNL/EE (M&G)/KPS/2022-23 | 15-03-2023 | 06-04-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Design Fabrication Integration Testing and Commissioning of Low Voltage Switchgear and Control gear at Kulhal Power Station |
|
819. | 20/SPH/2022-23 | 02-03-2023 | 06-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply of new fire extinguishers and other accessories along with refilling of old fire extinguishers at Sharda Power House, Lohiahead. |
|
820. | 16/EE (Civil-I)/Urgam/2022-23 | 21-02-2023 | 05-04-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Miscellaneous & Repair work at Power House and Thrust block at Urgam SHP (2x1.5 MW) in Distt- Chamoli. |
|
821. | 22 /SPH/2022-23 | 16-03-2023 | 03-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Annual Horticulture Maintenance, development of lawn and clearing grass at learning center/guest house”, of Sharda Power House, Lohiahead |
|
822. | 04/EE (Civil-III)/LMP/2022-23 | 14-03-2023 | 03-04-2023 | Dehradun | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer (Civil-III) | Construction and Design of (Abutment, protection and appurtenant civil works) for 85.4 meter span Bailey Suspension Bridge, 24R load class, carriage road width 3.277m with all civil works at River Yamuna at Lakhwar Dam Site Distt. Dehradun |
|
823. | 28/EE (GEN)/MB-II/2022-23 | 10-03-2023 | 03-04-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur | Executive Engineer (Generation | Routine maintenance work of LT and Switchyard at MB-II, Dharasu Power House. |
|
824. | 35/EE/PCM/Dhalipur/ 2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Skew Bridge to Intake of Dhalipur Power House. |
Corrigendum 1
|
825. | 34/EE/PCM/ Dhalipur/ 2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Court Bridge up to Skew Bridge. |
Corrigendum 1
|
826. | 33/EE/PCM/Dhalipur/2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Bhimawala Bridge to Court Bridge. |
Corrigendum 1
|
827. | 32/EE/PCM/Dhalipur/2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Dakpathar silt ejector to Bhimawala Bridge. |
Corrigendum 1
|
828. | 01/DGM(SHP)/PITHORAGARH/2022-23 | 24-03-2023 | 02-04-2023 | Pithoragarh | Office of the Deputy General Manager (SHP), Cantt. Road, Jakhni, Distt-Pithoragarh | General Manager (SHP) | Supply, Transportation, Installation, Commission & Testing of Line Reactor, Capacitor Bank etc. for (2X2.5 MW) Suringad SHP in Tehsil Munsyari District Pithoragarh |
|
829. | (1) 08/EE(Generation)/Vyasi/ 2022-23 | 10-03-2023 | 31-03-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Gen) | Supply & Installation of Easy Movable Gates & Other Fabrication work in (2x60 MW) Vyasi Power Station |
|
830. | NIT-09/EE(Gen)/Vyasi/22-23 | 10-03-2023 | 31-03-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Supply of stationary items for Vyasi HEP |
Corrigendum 1
|
831. | 43/EE(M)/MB-II/22-23 | 09-03-2023 | 30-03-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of vacuum breaking valve with sealing seat for turbine of Dharasu power House MB-II, Uttarkashi |
|
832. | 42/EE(M)/MB-II/22-23 | 09-03-2023 | 30-03-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House |
|
833. | 04/EE(Civil-II)/Guptkashi/2022-23 | 27-01-2023 | 30-03-2023 | Guptkashi | Executive Engineer (Civil-II) SHP, UJVN Limited, Guptkashi | Executive Engineer | Hiring of one number Light diesel Pool vehicle Mahindra & Mahindra Bolero (Non - AC) or equivalent with driver for one year on rent basis under O/o Executive Engineer (Civil-II) SHP, Guptkashi in District- Rudraprayag. |
|
834. | 17/EE (Civil-I)/Dunao/2022-23 | 24-02-2023 | 29-03-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Protection and Power Channel covering work at Ram Prasad Nautiyal, Dunao SHP (2x0.75 MW) in Distt- Pauri Garhwal |
|
835. | 20/EE(Gen)/Khodri/2022-23 | 06-03-2023 | 28-03-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Various works related to Hydrant System at Khodri Power Station |
|
836. | 33/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repairing of 33/ 11 kV 1 MVA transformer |
|
837. | 32/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repairing of drainage /dewatering Pumps |
|
838. | 31/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repair & overhauling of EOT Crane |
|
839. | 18/EE (Civil-I)/Kaliganga-II/2022-23 | 03-03-2023 | 28-03-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Protection work at Forebay escape of Kaliganga-II SHP (2x2.25 MW) in Distt-Rudraprayag |
|
840. | 09 /EE (Test)/MB-II/2022-23 | 15-12-2022 | 28-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Supply, Installation, Testing & Commissioning of 24 VDC, 850AH, VRLA Battery Bank at Dharasu Power House (MB-II), Chinylaisaur (Uttarkashi). |
|
841. | 14/EE(G)/Klg/2022-23 | 07-03-2023 | 27-03-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Supply & installation work of LED False Ceiling Lights at Ramganga Power Station, Kalagarh |
|
842. | T-49/EEM/2022-23 | 05-03-2023 | 27-03-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | 1-SITC of gear based easy movable mechanism system of central store gates chilla |
|
843. | CH(Maint.)-35/2022-23 | 04-03-2023 | 27-03-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Refurbishment & Installation & Commissioning of 01 Set of Turbine Guide Bearing Pads of 60 MW Francis Turbine of Chibro |
|
844. | e 13/EE(Gen)/Klg/2022-23 | 14-02-2023 | 27-03-2023 | Kalagarh | Executive Engineer (Generation) Ramganga Power Station | Executive Engineer | Supply, Installation, Testing & Commissioning of 110 V/400 Ah Plante Battery Bank at Ramganga Power Station, Kalagarh, Kalagarh. |
|
845. | 39/EE(Pathri)/2022-23 | 03-03-2023 | 25-03-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer, (M&G) | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar |
|
846. | CH(Maint.)-34/2022-23 | 04-03-2023 | 25-03-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer (Maint.) | Procurement of spare fasteners of Main Inlet Valve Flange at Chibro |
|
847. | 02/EE(E&M)/Vyasi Dam/2022-23 | 25-02-2023 | 25-03-2023 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar | Executive Engineer | Annual operation of Dam related control system & associated equipment of Vyasi HEP at juddo |
|
848. | 38/EE(Pathri)/2022-23 | 31-01-2023 | 25-03-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Design, Supply, Erection, Installation of Bore well Water System at Pathri Power House. |
|
849. | 24/EE/M&G/DLR/2022-23 | 04-03-2023 | 24-03-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Enhancing fencing security system of Dhalipur Power House Providing. |
|
850. | 13/EE (Maint)/VP/2022-23 | 04-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maintenance), Vyasi Project, Hathiyari, Dehradun for one year period for Executive Engineer |
|
851. | 12/EE (Maint)/VP/2022-23 | 04-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maint.), Vyasi Project, Hathiyari, Dehradun for one year period for pool vehicle |
|
852. | e-NIT/13/EE (E&M)/Asan Barrage/2022-23 | 02-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bwawan, Dhakrani, Dehradun | Executive Engineer (E&M) | Major overhauling of silt ejector gate at Asan Barrage |
|
853. | 03/EE (Civil-III)/LMP/2022-23 | 02-03-2023 | 24-03-2023 | Dehradun | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer (Civil-III) | Repair/ Maintenance and other miscellaneous civil work of Ambari store of Lakhwar project at Dakpathar (Dehradun) |
|
854. | 22/EE(CM)/DDN/2022-23 | 02-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Outer Painting & associated repair work of Type-III residences of UJVN Limited at Yamuna Colony, Dehradun |
|
855. | 21/EE(CM)/DDN/2022-23 | 02-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Outer Painting & associated repair work of Type-I residences of UJVN Limited at Yamuna Colony, Dehradun. |
|
856. | T-48/EEM/2023-24 | 02-03-2023 | 23-03-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer (M), Chilla Power House | Hiring of Light diesel vehicle non AC (Mahindra Bolero & Equivalent ) with driver for a period of 12 months for EE (Generation) Chilla |
|
857. | 31/EE/PCM-DKP/TN/2022-23 | 01-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVNLtd., Dakpathar (Dehradun) | Executive Engineer | Repair of drain in front of switchyard at Khodri Power House, Khodri (Dehradun) |
|
858. | 15/EE (Civil-I)/LMP/2022-23 | 26-02-2023 | 23-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Cleaning and Up-keeping of site offices of Lakhwar MPP |
|
859. | 20/EE(C&M)/MB-II/ Joshiyara/2022-23 | 01-03-2023 | 22-03-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Reconstruction of drain near playground at MB-II Joshiyara Uttarkashi. |
|
860. | 32/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Rectification of problem followed by AMC of Hydro-Mechanical governors installed at Kulhal Power Station along with other associated works |
|
861. | 31/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Shifting of 33 KV line, Khara no 4 and Khara no 5 under Kulhal Power House, Kulhal |
|
862. | 30/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Cleaning of drain water sump, sealing water tank, penstock gallery flushing of cooling water strainer and Bye pass gate charging pit for the period of one year of Kulhal Power House.” |
|
863. | 29/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | SITC of new 12.5 HP Submersible Pump at Kulhal Old Colony, Kulhal Power House |
|
864. | 28/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | External Painting Work of Type-I Residences of New Hydel Colony at Pashulok, Rishikesh. |
|
865. | 27/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh. | Executive Engineer | External Painting Work of Type-A Residences of Barrage Colony, Type-II & Type-III Residences of New Hydel Colony at Pashulok, Rishikesh. |
|
866. | 26/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Internal Painting work of Type-I, Type-II & Type-III Residences of New Hydel Colony at Pashulok, Rishikesh |
|
867. | 30/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Repair & overhauling of Trash rack Cleaning Machine |
|
868. | 29/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Replacement of rubber seals of Draft Tube gates |
|
869. | 28/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Supply, Installation, Testing and Commissioning of 33 kV Vacuum Circuit Breakers |
|
870. | 09/2022-23/EE(C-M) | 05-03-2023 | 20-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Repair and maintenance of Juddo Dam of Vyasi HEP at Juddo (Dehradun) |
|
871. | 24/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 25-02-2023 | 20-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal. | Executive Engineer | Interior painting work of Type-II Residences at Hydel Colony Kalagarh |
|
872. | 23/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 25-02-2023 | 20-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Exterior painting work of Type-II Residences at Hydel Colony Kalagarh. |
|
873. | NIT-01/EE(E&M)/Vyasi Dam/22-23 | 07-02-2023 | 20-03-2023 | Dakpathar | Executive Engineer (E&M), Vyasi Dam Juddo | Executive Engineer | Supply of various Electrical Spare parts for Dam site Juddo, Dakpatthar (Dehradun). |
|
874. | 12/EE(G)/Klg/2022-23 | 19-01-2023 | 20-03-2023 | Pauri-Garhwal | Executive Engineer (Generation), Ramganga Power Station, Kalagarh | Executive Engineer | Providing and fixing work of emergency exit sign boards, Safety Posters. |
|
875. | 27/EEM&G)DKN/2022-23 | 24-02-2023 | 18-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Supply, Installation, Testing and Commissioning of Rolling Shutters |
|
876. | 26/EEM&G)DKN/2022-23 | 24-02-2023 | 18-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Oil testing of various transformers. |
|
877. | 01/GM(SHP)/UJVNL/2022-23 | 21-02-2023 | 18-03-2023 | Rishikesh | Office of the General Manager (SHP), UJVN Ltd., Maneri Bhali Colony Rishikesh | EXECUTIVE ENGINEER (A)SHP Rishikesh | Hiring of one number Light diesel vehicle with AC (Scorpio/Creta or equivalent) with driver for one year on rent basis for GM (SHP) UJVN Limited, Maneri Bhali colony, Rishikesh. |
Corrigendum 1
|
878. | 25/EE(M&G)/DKN/2022-23 | 15-02-2023 | 18-03-2023 | Dhakrani | Executive Engineer (M&G), Dhakrani Power House | Executive Engineer | Supply, Installation, Testing and Commissioning of 36 kV Isolators at 132/33 kV Switchyard of Dhakrani Power Station. |
|
879. | 08/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Cleaning, Sweeping and other associated works in open area of Power House Building, HRT and Surge Shaft of Vyasi HEP at Hathiyari, Dehradun |
|
880. | 07/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Upkeeping and other works related to offices of Civil-Maintenance, Vyasi Project, Dakpathar, Dehradun |
|
881. | 06/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Granite stone fixing work at staircase Lift opening area in Dam at Juddo, Vyasi HEP (2X60MW) |
|
882. | 12 /EE (Test)/MB-II/2022-23 | 17-02-2023 | 17-03-2023 | Uttarkashi | Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | AMC of Computer & IT Equipments & procurement of spares for GM office, DGM office, Account office, Joshiyara Barrage and Dharasu Power House MB-II |
|
883. | CH(Maint.)-32/2022-23 | 14-02-2023 | 17-03-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Servicing of 100 Ton Syphon Tunnel Crane at Chibro. |
|
884. | 11 / प्रबन्धक (प्र TTO एवं सु ) / 2022-23 | 24-02-2023 | 16-03-2023 | देहरादून | उज्ज्वल, महारानी बाग,जीएमएस रोड, देहरादून | प्रबन्धक (प्रशासन एवं सुरक्षा) | उज्ज्वल, महारानी बाग,जीएमरोड,देहरादून परिसर के बाग बहार(वर्श 2023-24)की बिकी |
|
885. | 02/2022-23/EE(HM-I)/CD&H,Rishikesh | 23-02-2023 | 16-03-2023 | Dehradun | For and on behalf of UJVN Limited, Executive Engineer (HM-I), CD&H, Pashulok, Rishikesh, Dehradun | Executive Engineer (HM-I) | Hiring of one no. light non-AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for DGM(CD-I)Pashulok, Rishikesh.”, |
|
886. | 04/2022-23/EE(C-M)Vyasi | 17-02-2023 | 16-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Hiring of one number vehicle (Mahindra Scorpio, AC (diesel)/equivalent along with driver for General Manager(Civil maintenance) Vyasi Project cum GM (Civil) Arakot-Tiuni &Tiuni Plasu, Dakpathar, Dehradun for one year.” |
|
887. | 25/2022-23/EE | 16-02-2023 | 16-03-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Protection Work in Left Bank at Just Upstream of Bin Super Passage. |
|
888. | 15 /EE(G)/2022-23 | 23-02-2023 | 15-03-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Procurement of printed log books and various stationary items for chilla power house |
|
889. | 14/EE(G)/2022-23 | 23-03-2023 | 15-03-2023 | Chilla | Office of the Executive Engineer (G), Chilla | Executive Engineer (G) | Supply, laying & fixing of 11kV Power Cable for 800 kVA SAT No-1 at Chilla Power House. |
|
890. | 05/ EE(Civil)/SHP/Maneri /2022-23 | 23-02-2023 | 15-03-2023 | Uttarkashi | Office of the Executive Engineer (Civil)/SHP/Maneri Uttarkashi | Executive Engineer (Civil)/SHP/Maneri | Hiring of one no. Non A.C Diesel vehicle Such as Mahindra Bolero or equivalent with driver for office of Executive Engineer (Civil),SHP Maneri,Uttarkashi for one year, |
|
891. | 22/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 17-02-2023 | 15-03-2023 | Pauri Garhwal | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Providing & Laying new Granite Stone and Kota Stone flooring in Ramganga Power House Kalagarh. |
|
892. | 07/EE(E&M-SHP)/KG-II/2022-23 | 16-02-2023 | 15-03-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Supply, Installation, Testing and Commissioning of CCTV & its accessories at Kaliganga-II SHP near village Kaviltha, tehsil Ukhimath in district Rudraprayag, Uttarakhand. |
|
893. | 15/EE(M)/2022-23 | 28-01-2023 | 15-03-2023 | Uttarkashi | Executive Engineer (Maintenance) Tiloth Power House | Executive Engineer | Different maintenance works of 5 MT capacity single girder EOT crane at Tiloth Power House, Uttarkashi. |
|
894. | 16/EE (Civil-I)/LMP/2022-23 | 28-02-2023 | 14-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun | Executive Engineer (Civil-I) | Repair/Reconstruction of Project approach roads of Lakhwar MPP |
|
895. | 09/EE(Test)/DKN/2022-23 | 19-01-2023 | 14-03-2023 | Dhakrani | Executive Engineer (Test), Dhakrani | Executive Engineer | Servicing of 220/110 Volt battery banks and battery chargers & Provisioning of standby 48 volt DC source for PLCC panels. |
|
896. | 14/EE (Civil-I)/LMP/2022-23 | 26-02-2023 | 13-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Carrying out Miscellaneous Survey work for Lakhwar Multipurpose Project |
|
897. | 32/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | Conversion of Andritz Office in Committee Hall at Pathri Power House. |
|
898. | 31/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | External Painting Work of Type-II Residences of Chilla Colony |
|
899. | 34/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | Painting Work of Residential and Non-Residential Buildings of Mayapur Colony at Haridwar. |
|
900. | 33/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | External Painting Work of Type-I Residences of Chilla Colony. |
|
901. | 04/UJVNL/EE(C-SBR)/2022-23 | 20-02-2023 | 13-03-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | (Executive Engineer (C), SBR Project) | Construction of approach path to barrage site of SBR-HEP (120 MW) at tehsil Munsyari in dist. Pithoragarh. |
|
902. | 11/EE(Maint.)/VP/2022-23 | 18-02-2023 | 13-03-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Vyasi Project, Dakpathar | Executive Engineer (Maint.) | Hiring of one no. 11 Seater Van for one year on contract basis for transportation of staff of Vyasi Dam, Juddo, Dehradun |
|
903. | 20/EE(CM)/DDN/2022-23 | 20-02-2023 | 13-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Construction of Saraswati Shishu Mandir school building under CSR head at Soda-Siroli, Raipur, Dehradun. |
|
904. | 19/EE(CM)/DDN/2022-23 | 20-02-2023 | 13-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Hiring of Diesel Vehicle Bolero or equivalent of model 2021 or later (With Driver) for the Office of the Executive Engineer, Civil Maintenance, Yamuna Colony, UJVN Ltd. Dehradun. |
|
905. | 19/SPH/2022-23 | 16-02-2023 | 13-03-2023 | Lohiahead, Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Cleaning of trash rack with the help of labours and disposal of debris from collecting pit of Sharda Power House, Lohiahead. |
|
906. | 21/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 16-02-2023 | 13-03-2023 | Kalagarh, Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | M&R work of drains and making path along drains in IIIrd type residences at Hydel Colony Kalagarh |
|
907. | 20/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 16-02-2023 | 13-03-2023 | Kalagarh, Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Interior and exterior painting work of Type-I & Type-A residences at Hydel colony Kalagarh. |
|
908. | 24/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 14-02-2023 | 13-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Executive Engineer | Protection Work in Left Bank Near Vindhyavasini Site at Bin River. |
|
909. | 23/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 14-02-2023 | 13-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Executive Engineer | Protection Works of Downstream of Bin Super Passage at Power Channel of Chilla HEP. |
|
910. | NIT- 10/EE(Test)/MB-II/22-23 | 15-02-2023 | 11-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Procurement of spare Items for Battery Bank at Dharasu Power House MB-II, Chinyalisaur Uttarkashi -249196. |
|
911. | 11/EE(Test)/MB-II/22-23 | 15-02-2023 | 11-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Procurement of Rotary Switches for ASEP & GCP for Dharasu Power House MB-II, Chinyalisaur Uttarkashi. |
|
912. | 05/2022-23/EE(C-M) | 18-02-2023 | 10-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Maintenance of Power House and allied structures of Vyasi HEP (2X60 MW) at Hathiyari, Dehradun |
Corrigendum 1
|
913. | 12/EE(IC&CM)/2022-23 | 17-02-2023 | 10-03-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Hindi Translation and Printing of annual financial report of UJVN Ltd. for the F.Y. 2021-22 |
|
914. | 12/EE(E&M)/AB/2022-23 | 16-02-2023 | 10-03-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Leakage sealing of Barrage Gates and other works |
|
915. | 18/SPH/2022-23 | 15-02-2023 | 10-03-2023 | Lohiahead, Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima, | Executive Engineer(M&G) | Procurement of 2 nos 36 kV Vacuum Circuit Breakers of rated current 1250 A for 33 kV switchyard at Sharda Power House, Lohiahead” . |
|
916. | 17/EE(Gen)/Khodri/2022-23 | 15-02-2023 | 10-03-2023 | Dakpathar | Executive Engineer (Generation), Khodri Power Station | Executive Engineer | Retrofitting and up gradation of 3X 40 TR DX AC Plant at Khodri Power Station. |
|
917. | 10/EE(G)/Klg/2022-23 | 06-01-2023 | 10-03-2023 | Pauri-Garhwal | Eecutixve Engineer (Generation), Ramganga Power Station, Kalagarh | Executive Engineer | Internet Leased Line Service at Ramganga Power Station, Kalagarh for a period of one year works. |
Corrigendum 1
Corrigendum 2
|
918. | 13/EE(Civil-I)/LMP/2022-23 | 16-02-2023 | 09-03-2023 | Dakpathar | Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Repair and maintenance of residences of Lakhwar project at Dakpathar (Dehradun) |
|
919. | CH(Maint.)-33/2022-23 | 14-02-2023 | 09-03-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Repairing & overhauling of Drainage & Dewatering pumps system of Chibro. |
|
920. | 21/EE/M&G/DLR/2022-23 | 14-02-2023 | 08-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Annual Cleaning of Dhalipur Power House Intake Trash Rack, Parks, Power House Campus, Pitching walls, uneven field, Switchyard etc for FY. 2022-23 |
|
921. | 21/EE/M&G/DLR/2022-23 | 14-02-2023 | 08-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Annual Cleaning of Dhalipur Power House Intake Trash Rack, Parks, Power House Campus, Pitching walls, uneven field, Switchyard etc for FY. 2022-23. |
|
922. | 21/EE(M&G)/MPH/2022-23 | 26-02-2023 | 06-03-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Hiring of One non AC Vehicle for School going Children and Power house work at Mohammadpur Power House for one year |
|
923. | 04/EE/BP/2022-23 | 06-02-2023 | 06-03-2023 | Tehri Garhwal | Executive Engineer, UJVN Ltd., Ghansali, Tehri Garhwal | Executive Engineer | Hiring of one no. Vehicle (M&M Bolero, Non-AC or equivalent) along with driver for one Year. |
|
924. | PDD-12/2022-23 | 18-01-2023 | 05-03-2023 | Dakpathar | Executive Engineer, Project Distribution Division | Executive Engineer | Supply of HT XLPE armored cable of different sizes. |
|
925. | 20/EE(M&G)/MPH/2022-23 | 11-02-2023 | 03-03-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Overhauling & maintenance of Trash rack cleaning machine at Mohammadpur Power House. |
|
926. | 19/EE(M&G)/MPH/2022-23 | 11-02-2023 | 03-03-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Annual routine maintenance at Mohammadpur Power house. |
|
927. | 09/EE(E&M-II)/LP/2022-23 | 10-02-2023 | 03-03-2023 | Lakhwar | Office of the Executive Engineer-II (E&M-II), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer | Turfing & Cable Protection work at 33/11 KV, Lakhwar substation, Kaldriyan, Nainbagh, Tehrighwal |
|
928. | 30/EE(G)/CPH/2022-23 | 09-02-2023 | 03-03-2023 | Chibro | Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Supply & Installation of fire extinguisher equipments and Insulating coating at Chibro Power House .” |
|
929. | 20/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rewinding & Overhauling of various type burnt motor of 3 x 17 MW. Dhalipur Power Station. |
|
930. | 19/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rewinding & Overhauling of Governor pump burnt motor of Unit B of Dhalipur Power Station |
|
931. | 18/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Refilling of various dry powder extinguisher stored pressure ABC type at Dhalipur Power Station |
|
932. | 15/EE(Civil-I)/Urgam/2022-23 | 06-02-2023 | 02-03-2023 | Rudraprayag | Executive Engineer (Civil-I), UJVN Limited, Guptkashi | Executive Engineer | Protection & Repair work at Intake and water conductor system at Urgam SHP (2x1.5 MW) in Distt- Chamoli. |
|
933. | 31/EE/PCM/Dhalipur/ 2022-23 | 07-02-2023 | 02-03-2023 | Dehradun | Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Extension of existing vehicle parking at Dhalipur Power House at Dhalipur, Dehradun. |
|
934. | 02/2022-23/EE(Civil-II)/BP | 03-02-2023 | 02-03-2023 | Garhwal | Executive Engineer (Civil-II) Bhilangna Projects Ghansali Tehri Garhwal | Civil | Hiring of one no. diesel vehicle Non-AC (M&M Bolero or equivalent) along with driver for Executive Engineer (Civil—II), Bhilangna Projects, Ghansali, Tehri Garhwal for twelve Months. |
|
935. | 22/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 09-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer | Construction of Drain at Ganga Bhogpur Talla along the Power Channel of Chilla HEP |
Corrigendum 1
|
936. | 29/2022-23/EE/PCM(GV)/Mayapur | 08-02-2023 | 01-03-2023 | Haridwar | Executive Engineer, Project Civil Maintenance(Ganga Valley), Mayapur, Haridwar. | Executive Engineer | Roof Leakage Treatment of Residential Buildings at Pathri Power House Colony. |
|
937. | 21/2022-23/EE(C)/Pashulok Barrage | 07-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Renovation & Strengthing of Damaged Boundary Wall of New Hydel Colony Rishikesh. |
|
938. | 20/2022-23/EE(C)/Pashulok Barrage | 07-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh |