S.No | Click Here To Download NIT | Uploading Date | Closing Date | Circle | Address | Classification | Description | Corrigendum / Downloads |
---|---|---|---|---|---|---|---|---|
1. | 03/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 24-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Power House Building, Tail Race Channel, Switch yard and other associated work of Power House site of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
Time Extn. 1
|
2. | 02/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 24-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Head Race Tunnel, Adits, Surge Shaft, Excavation of penstock of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
Time Extn. 1
|
3. | 01/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 24-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Barrage, Intake and its appurtenant works including River Diversion of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
Time Extn. 1
|
4. | 11/EE(Civil-II)/LMP/2023-24 | 12-03-2024 | 05-06-2024 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. | Executive Engineer | Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2024-25) |
Time Extn. 1
Time Extn. 2
|
5. | 01/EE(Civil)/HT/2023-24 | 15-03-2024 | 01-06-2024 | Dehradun | Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun) | Executive Engineer | Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Hanol-Tiuni Hydro Electric Project on River Tons in District Uttarkashi/Dehradun of Uttarakhand |
Time Extn. 1
|
6. | 73/EE(M)/MB-II/23-24 | 13-03-2024 | 22-05-2024 | Uttarkashi | The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Turbine Shaft Rubber Seal for 76MW Turbine at Dharasu Power House MB-II, Chinyalisaur |
Time Extn. 1
Time Extn. 2
|
7. | 72/EE(M)/MB-II/23-24 | 13-03-2024 | 22-05-2024 | Uttarkashi | The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of consumable items at Dharasu Power House, MB-II Chinyalisaur |
Time Extn. 1
Time Extn. 2
|
8. | 07/EE(Civil)/KB/2023-24 | 05-03-2024 | 15-05-2024 | Dakpathar | Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Providing Consultancy Services for preparation of EPC tender documents and tender stage drawing for Katapathar Barrage on river Yamuna at Katapathar, Dist. Dehradun in Uttarakhand. |
Time Extn. 1
Time Extn. 2
Corrigendum 1
|
9. | 16/EE(E&M-I)/LP/2023-24 | 26-03-2024 | 11-05-2024 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer | Supply of Stationery items for the offices of E&M wing Lakhwar Multi Purpose Project, Dakpathar, Dehradun |
Time Extn. 1
|
10. | e-T.No.10/EE(Test)/DKN/2023-24 | 05-03-2024 | 07-05-2024 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer | Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels at Kulhal Powerhouse |
Time Extn. 1
Time Extn. 2
|
11. | 20/2023-24/EE(C-M)Vyasi Project | 09-02-2024 | 06-05-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Levelling of land & Demarcation of plots at Village Dhaira Khadar,Kalsi Distt. Dehradun for Rehabilitation of Vyasi HEP affected village Lohari |
Time Extn. 1
Time Extn. 2
Time Extn. 3
Time Extn. 4
|
12. | 32/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Safe closure of adits,tunnels,surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
Corrigendum 1
|
13. | 31/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
Corrigendum 1
|
14. | 30/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
Corrigendum 1
|
15. | 32/EE/PCM-DKP/TN/2023-24 | 27-02-2024 | 27-04-2024 | Dakpathar | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Special repair of spillway & roller bucket of bay no 3, 4 & 5, CC Blocks beyond the roller buckets of all spillway and pitching/retaining wall of approach road of Ichari dam |
Time Extn. 1
Time Extn. 2
|
16. | 21/EE(Civil-III)/LMP/2023-24 | 20-03-2024 | 25-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 11.00 to 15.20) at left bank of river Yamuna of Lakhwar MPP |
Time Extn. 1
|
17. | 20/EE(Civil-III)/LMP/2023-24 | 20-03-2024 | 25-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 6.2 to Km 9.00 upto Doligad) at left bank of river Yamuna of Lakhwar MPP |
Time Extn. 1
|
18. | 01/EE(Quality)/LMP/2023-24 | 18-03-2024 | 23-04-2024 | Dehradun | Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun | Executive Engineer | Construction of 04 nos. B-Type residences for Lakhwar Project at Dakpathar, Dehradun |
Time Extn. 1
|
19. | 21/EE(C-M)/DDN/2023-24 | 21-02-2024 | 23-04-2024 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Comprehensive annual maintenance contract (CAMC) of 03 Nos. Kone Make lifts installed at the New Corporate Office Building G.M.S. Road, Ujjwal Dehradun |
Time Extn. 1
Time Extn. 2
|
20. | e-04/UJVNL/IT/EE(EM-II)/2023-24 | 16-03-2024 | 22-04-2024 | Dehradun | Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun | Executive Engineer | Supply, installation, testing & commissioning of Advance Training System in Training Hall, UJVN Limited, “Ujjwal”, GMS Road, Dehradun |
Time Extn. 1
|
21. | 18/EE(Civil-I)/LMP/2023-24 | 16-03-2024 | 22-04-2024 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Construction of Transit camp at Lakhwar SubStation Kandriyan |
Time Extn. 1
|
22. | 17/EE(Civil-I)/LMP/2023-24 | 16-03-2024 | 22-04-2024 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair and maintenance of Sub-Station Building and protection of switchyard at Kandriyan. |
Time Extn. 1
|
23. | 27/EE-II (E&M)/LP/2023-24 | 22-03-2024 | 22-04-2024 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer-II | Detailed Engineering & Designing, Procurement, Manufacturing, inspection, Transportation, site erection, installation, testing & commissioning of Early Warning System and Surveillance System of Lakhwar MPP |
|
24. | 26/2023-24/EE(C-M)Vyasi | 14-03-2024 | 22-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Annual Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun |
Time Extn. 1
|
25. | 38/EE/PCM/Dhalipur/ 2023-24 | 26-02-2024 | 22-04-2024 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Protection work of Tail Race Channel (Asan River side) of Dhalipur Power House at Dhalipur, Dehradun |
Time Extn. 1
Time Extn. 2
|
26. | 48/EE(Pathri)/2023-24 | 20-03-2024 | 20-04-2024 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Design, Manufacturing, Supply, Erection, Testing & Commissioning of one no. Hydraulically Operated Trash Rack Cleaning Machine at Pathri Power House |
Time Extn. 1
|
27. | 14/EE (Civil)/Lohiahead/Khatima/2023-24 | 02-03-2024 | 20-04-2024 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | Construction of Type- IV residences in residential complex at Sharda Power House, Lohiahead Khatima Udham Singh Nagar |
Time Extn. 1
|
28. | e-28/EE(Gen)/Khodri/2021-22 | 10-01-2022 | 05-03-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Procurement of DC excitation cable. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
Cancellation Notice
|